Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME.

Slides:



Advertisements
Similar presentations
John Coughlan et al.Rutherford Appleton Laboratory14th May 20023rd CMS Electronics Week Tracker Front-End Driver Progress Report 3rd CMS Electronics Week.
Advertisements

Tracker Strip and Pixel FEDs John Coughlan Tracker Readout Upgrade Meeting September 12 th 2007.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
ESODAC Study for a new ESO Detector Array Controller.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory14 September 2000LEB2000 Krakow The Front-End Driver Card for CMS Silicon Microstrip.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
CMS Annual Review September 2004Geoff Hall1 Tracker Off-detector Electronics On-detector electronics production approaching completion procuring spares.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Instrumentation Department John Coughlan Rutherford Appleton Laboratory14 November 2002 CMS Tracker Readout Effort Requirements in Instrumentation Department.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Development of a tracking detector for physics at the Large Hadron Collider Geoff Hall.
Instrumentation DepartmentJohn Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 Delay FPGA I/O Clock40.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory21 October 2002 CMS Tracker FED Back End FPGA Frame_Sync_out0.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory16 January 2002 CMS Tracker FED Back End FPGA Frame_Sync_out0.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
J. Coughlan et al. 1st October 2003 LECC 2003 Amsterdam The CMS Tracker Front-End Driver 9 th Workshop on Electronics for LHC Experiments Amsterdam J.A.Coughlan,
Upgrade to the Read-Out Driver for ATLAS Silicon Detectors Atlas Wisconsin/LBNL Group John Joseph March 21 st 2007 ATLAS Pixel B-Layer Upgrade Workshop.
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
Tracker Week 11th February CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
LHCb front-end electronics and its interface to the DAQ.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory11 September 2002LEB 2002 Colmar The Front-End Driver Card for the CMS Silicon.
24th October 2003 M. Noy, Imperial College London0 M. Noy FED Project Status.
CCU25 Communication and Control Unit ASIC in CMOS 0.25 μm Ch.Paillard
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London.
Electronic System Design GroupInstrumentation DepartmentRob HalsallRutherford Appleton Laboratory19 July 2002 Electronic System Design Group CMS Tracker.
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 CMS Tracker FED Firmware.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory18 July 2001 CMS Tracker FED CMS Tracker Two Weekly.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
DAQ and TTC Integration For MicroTCA in CMS
Development of the CMS Silicon Strip Tracker Readout
Production Firmware - status Components TOTFED - status
CCS Hardware Test and Commissioning Plan
Readout System of the CMS Pixel Detector
Iwaki System Readout Board User’s Guide
HCAL Data Concentrator Production Status
TTC system and test synchronization
The CMS Tracking Readout and Front End Driver Testing
Data Concentrator Card and Test System for the CMS ECAL Readout
TELL1 A common data acquisition board for LHCb
Presentation transcript:

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME crate requirements definition FEDv1 status : hardware / firmware / low-level software FEDv1 testing plans

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Crates Requirements Document Document needed for Tracker Crates ordering Aim to have common VME64x bus crates for FED and FEC List of special needs, connectors, power…etc. E.g. FED may need Transition cards (DAQ links) References to LHC Crate technical specification EP document Released for comments

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Crates Requirements Document

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided board CERN Opto- Rx Analogue/Digital 96 Tracker Opto Fibres VME Interface Xilinx Virtex-II FPGA Modularity 9U VME64x Form Factor Modularity matches Opto Links 8 x Front-End “modules” OptoRx/Digitisation/Cluster Finding Back-End module / Event Builder VME module / Configuration Power module Other Interfaces: TTC : Clk / L1 / BX DAQ : Fast Readout Link TCS : Busy & Throttle VME : Control & Monitoring JTAG : Test & Configuration FE-FPGA Cluster Finder TTC TCS Temp Monitor JTAG TCS : Trigger Control System 9U VME64x

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Board Layout Primary Side

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FED v1 Board Layout Secondary Side

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Overview 12 Front-End Modules x 8 Double-sided board CERN Opto- Rx Analogue/Digital 96 Tracker Opto Fibres Xilinx Virtex-II FPGA Modularity 8 x Front-End “modules” FE-FPGA Cluster Finder 9U VME64x

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Front-End module 12 Fibre Ribbon PD Array *5* CLK DCM LVDSCLK40 from TTC CERN Opto Rx 6 CLOCK CONTROL DATA DATA 160 MHz 3 N Full Partially Full RESET Cluster Finding FPGA Delay FPGA Delay FPGA Delay FPGA Dual ADC 10-bits 40 MHz OpAmp XC2V1500XC2V40AD9218EL2140 CLK 10 ASIC 4*4* Data Control Digital Processing 12x trim DAC Temp Sensor LM82 * Double Data Rate I/O Each individual ADC clock skew is adjustable in steps ~ 1nsec

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Front-End module Primary Routed

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Front-End module Secondary Routed

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Full-Scale 9U Layout TTCrx BE-FPGA Event Builder Buffers DAQ Interface 12 Front-End Modules x 8 Double-sided board CERN Opto- Rx Analogue/Digital 96 Tracker Opto Fibres Xilinx Virtex-II FPGA Back-End module For each L1-Trigger: Collects 8 x FE variable length data fragments Formats FED event for DAQ Appends TTC synch information Buffers in External QDR SRAM Sends data via DAQ Front-end Readout Link FRL Signals to TCS : Busy/Throttle FE-FPGA Cluster Finder TTC TCS TCS : Trigger Control System 9U VME64x PinDiode /Amp ASIC

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting DAQ Front-end Readout Link FRL DAQ Mezzanine Card Transition Card Busy Throttle S-LINK64 FEDv1 FED-DAQ Interface TTCrx BE-FPGA Event Builder Buffers 12 TTC TCS FRL DAQ links use S-LINK64 standard Implementation: Channel Link 800 MBytes/sec max Average DAQ rate 200 MBytes/sec See talk “CMS Data to surface transportation architecture”: Attila Racz Due to mechanical constraints place DAQ link card on Transition card

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting Alternative scheme: “Channel Link” in Virtex-II BE-FPGA DAQ FEDv1 FED-DAQ Interface (alternative) TTCrx BE-FPGA Event Builder Buffers 12 TTC TCS

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 VME module VME-FPGA FPGA Configuration 12 VME Interface Xilinx Virtex-II FPGA VME64x Interface: A32/D64 Slave & Master DMA engine Interrupter Plug & Play geographic addressing Live Insertion Transceivers FPGA Configuration: Xilinx System ACE Compact Flash MPU-VME interface for in-situ reprogramming via Crate Controller JTAG for Configuration & Test JTAG 9U VME64x System ACE CF

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Power module Power DC-DC 12 Front-End Modules x 8 Double-sided board CERN Opto- Rx Analogue/Digital Xilinx Virtex-II FPGA Standard LHC spec crate supplies: +3.3V, +5V, +12V Derive: -5V, 1.5V, 2.5V on board Board Estimate ~ 80 W Hot Swap Controllers: Sequence power Protection against out of range voltage & current Over temperature shutdown Temp Monitor TCS : Trigger Control System 9U VME64x Warning

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Testing VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided board CERN Opto- Rx Analogue/Digital 96 Tracker Opto Fibres VME Interface Xilinx Virtex-II FPGA JTAG Boundary Scan: Digital connections Chip Scope Integrated Logic Analyser Cores : Capture raw ADC data (without VME) Opto-Tests or Inject electrical signals post-OptoRx Special FPGA loads e.g. Pattern Generators Additional Test Features: Internal/External Clocks External Triggers FE-FPGA Cluster Finder TTC TCS Temp Monitor JTAG TCS : Trigger Control System 9U VME64x

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Status VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided board CERN Opto- Rx Analogue/Digital 96 Tracker Opto Fibres VME Interface Xilinx Virtex-II FPGA FE-FPGA Cluster Finder TTC TCS Temp Monitor JTAG TCS : Trigger Control System 9U VME64x Board Status

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FED Schedule Schedule 2002/Q4 : 2 x RAL for test 2003/Q4 : ~10 x CERN 2004/Q4 : ~10 x FEDv2 manufacture 2005/Q2* : 500 x FEDv3 manufacture (*funds permitting) FEDv1 : Full scale Prototype FEDv2 : Pre-production FEDv3 : Final production FEDv1 FEDv2 FEDv3 2003/Q3 : ~2 x CERN ?

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FED Schedule Schedule 2002/Q4 : 2 x RAL for test => 2002/Q3 : 2 x CERN TIB test? 2003/Q4 : ~10 x CERN 2004/Q4 : ~10 x FEDv2 manufacture 2005/Q2* : 500 x FEDv3 manufacture (*funds permitting)

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FED Schedule Schedule 2002/Q4 : 2 x RAL for test 2003/Q4 : ~10 x CERN 2004/Q4 : ~10 x FEDv2 manufacture 2005/Q2* : 500 x FEDv3 manufacture (*funds permitting) FEDv1 : Full scale Prototype FEDv2 : Pre-production FEDv3 : Final production FEDv1 FEDv2 FEDv3

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting CMS Silicon Strip Tracker FED Summary & Schedule Schedule 2002/Q4 : 2 x RAL for test 2003/Q4 : ~10 x CERN 2004/Q4 : ~10 x FEDv2 manufacture 2005/Q2* : 500 x FEDv3 manufacture (*funds permitting) FEDv1 : Full scale Prototype FEDv2 : Pre-production FEDv3 : Final production Summary Presented a 9U VME64x board for off-detector readout of Silicon Strip Tracker Digitisation Zero Suppression Event Readout Meets SST data rate requirements Analogue : 96 channel 10-bit 40 MHz Digital : Virtex-II FPGAs flexible logic Test and Monitor features aid debugging

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting CMS Silicon Strip Tracker FED Counting Room Layout (illustration) 440 Boards96 ADC/Board 24 Crates 8 Racks 440 Boards96 ADC/Board 24 Crates 8 Racks 40 K ADC Channels10 Max Trigger Rate100 kHz Input Rate1.5 T Byte/s Output rate25 Gbyte/s/% 40 K ADC Channels10 Max Trigger Rate100 kHz Input Rate1.5 T Byte/s Output rate25 Gbyte/s/% 4 TTC Partitions DAQ FED

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting 124 E-Net Switch FEC CRATES DCS Tracker Control WS TTC CRATES DAQ VME SBC RTOS CMS Silicon Strip Tracker FED Control & Monitoring D-BASE R/C 50K ADC Channels FED CRATES

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting CMS Silicon Strip Tracker FED Software Architecture Software Architecture CMS XDAQ & HAL Network VME Supervising WS CRATE SBCs Real Time OS Hardware FED, FEC, TTC FPGA USER Tracker System ‘Kernel’ GUI Network FED API Library Memory Map Hardware Driver Network Calibration Setup Fast Monitoring Exception Handling Hit Finding Logic Analyser

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting CMS Silicon Strip Tracker FED PMC Prototype 8 x 10 Bit 40 MHz ADC 64K Memory/per ADC 40 K Gate FPGA Control PCI Interface Mounts on Commercial VME CPU Board (or with an adapter in a PC slot) 60 in service Present Generation of ADC PMC Small scale module testing System Test beams e.g. LHC 25 nsec Small scale module testing System Test beams e.g. LHC 25 nsec

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting CMS Silicon Strip Tracker FED Crate Layout FE 1 DAQ TTC FE 2 FE 3 FE 4 FE 5 FE 6 FE 7 Crate Input Data Rate~ 50 Gbyte/s Crate Output Data Rate~ 1 GByte/s per percent hit occupancy B-Scan F-Bus NN Synch 100 KHz FE 8 Throttle

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting CMS Silicon Strip Tracker FED Front-End FPGA Logic ADC 1 10 sync 11 trig2 Ped sub 11 trig3 Re-order cm sub 8 Hit finding s-data s-addr8 16 hit Packetiser 4 averages 8 header control DPM 16 No hits Sequencer-mux 88 a d a d ADC trig1 sync 11 trig2 Ped sub 11 trig3 Re-order cm sub 8 Hit finding s-data s-addr cycles hit DPM 16 No hits Sequencer-mux 88 a d a d status averages 8 headerstatus nx256x16 trig4 Synch in Synch out Synch emulator in mux Serial I/O Serial Int B’Scan Local IO Config Cluster Finding FPGA VERILOG Firmware Full flags data Global reset Control Sub resets 10 Phase Registers Phase Registers 2 x 256 cycles256 cyclesnx256x16 trig1 Synch error 4x Temp Sensor Delay Line Opto Rx Clock 40 MHz DLL 1x 2x 4x per adc channel phase compensation required to bring data into step + Raw Data mode, Scope mode, Test modes MHz

Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting FEDv1 Back-End FPGA Logic FIFO Circular Buffers Frame_Syncs Readout_Syncs Monitor_Syncs x8 TTC Rx TCS ‘VME’ DECODE CONTROL & MONITOR Data_stream 0 Data_stream Data In 20 Address 18 Data Out 64 FRL to DAQ SLINK64 64 R/W Address Generator APV hdrs Lengths Bx,Ex Em Hdr diagnostics Data 80 Mhz L1 100 kHz MHz 40 Mhz Clock40 Reset DCM x1 x2 x4 2 x QDR SRAM x2 burst BSCAN 160 MHz 80 MHz Lengths Header FF/PF Flags Control 2 MBytes