SPX Data Acquisition PRELIMINARY DETAILED DESIGN REVIEW John Dong David Haller Adam Johnson Thomas Klaben Luke Kranz.

Slides:



Advertisements
Similar presentations
Routed Systems Presented by: Bassam Najar, Design Engineer Butler International Inc.
Advertisements

HVAC523 Heat Sources.
New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
Do Now for 6/10/13 Open books to page D-69 HW: Complete Group Procedure.
© LWTL Faculty Team Living with the Lab Pump Performance Testing.
Electromagnetics for 8th grade
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Dakota Nickerson, Kyle Pflueger, Adam Leschber, Andrew Dahlke M.E. Undergrad 1.
© 2011 LWTL Faculty Team Living with the Lab Pump Performance Testing.
LFTB Proprietary Information 1 Fuser test bed ™ R I T MSD1 Project Review February 22, 2007 Fuser Test Bed P07501 IE TEAM Justin McMillan – Project Lead.
Team Members: Bryan McCormick (ME) Andy Freedman (ME) John Kreuder (ME) Ken McLoud (ME) Jon Holdsworth (EE) Gabriela Santa Cruz (IE) Thermoelectric Module.
Film Thickness Measurement Julian Peters Joe Fitzmyer Brad Demers P06402.
Space Engineering Institute (SEI) Space Engineering Research Center Texas Engineering Experiment Station, Texas A&M University Integrated Thermal Energy.
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
How To Solder By: Stephen Eibling.
SMART House Kia Graham Tyangelio Gaines Ebony LeBlanc Southern University and A & M College College of Engineering and Computer Science Department of Electrical.
Power Generation for the Better Water Maker: Subsystems Design Review October 29, 2013.
Detailed Design Review P UAV Telemetry Chris BarrettProject Manager Gregg GolembeskiInterface Manager Alvaro PrietoRadio Concepts Cameron BosnicSoftware.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
Senior Project Electrical Engineering 2010 Energy Monitoring Demarcus Hamm Advisor: Prof. Cherrice Traver Abstract Goals ECE Lab Connection Diagram Design.
Handout from Clinic Conducted by Bernard Kempinski at several NMRA conventions
Power Control System for a Concrete Durability Test Cabinet – Phase 2 Jacob Jameson Madhav Kothapalli Thomas Persinger Andrew Versluys.
Shutter Timing and Flash Synchronization System Joel Hoffa Shaun Pontsler November 10, 2005 Advisor: Professor Herr.
Stycast Insertion Part 3 and preliminary glue picture on samples
Legal Notices and Important Information Intel processor numbers are not a measure of performance. Processor numbers differentiate features within each.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Engineering Design Workshop Quality Design Projects for Engineering Fairs Sponsored by Santa Clara Valley Science and Engineering Fair Association for.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
ROV Cameras. Extending Your Camera We want your ROV to be able to see the sea! (And the pool)
SPX Data Acquisition PROBLEM DEFINITION REVIEW John Dong David Haller Adam Johnson Thomas Klaben Luke Kranz.
First-Year Engineering Program Advanced Energy Vehicle System Analysis 3 Reference:  AEV Lab Manual  System Analysis 3 Grading Guidelines.
AP Physics Heat Capacity Lab Objective : The objective of this lab exercise is to use calorimetry as well as the concepts of heat capacity and exchange.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
SPX Data Acquisition SUBSYSTEMS DESIGN REVIEW John Dong David Haller Adam Johnson Thomas Klaben Luke Kranz.
Manual Density Business Today
Stress/Strain Measurement
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
Name ____________________________________________ Date ______________ Period ____________ Heat Capacity BACKGROUND INFORMATION Heat, as you know by now,
SPX Data Acquisition SYSTEMS DESIGN REVIEW John Dong David Haller Adam Johnson Thomas Klaben Luke Kranz.
Nanofluidic Characterization David Sharp David West Justin Davis.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Planning/Production Record P17 Date/ Time Work carried outQuality control checks Health and Safety issues Name:
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
Dynamometer Redesign and Build for Future RIT Automotive Laboratory Project Sponsored by: Mechanical Engineering Dept, Dave Hathaway and Mark Steinke.
Failure Modes and Effects Analysis (FMEA)
Motor Assisted Wheelchair Design Review 10/01/15.
P1 Revision. Structure of P1 P1 is split into 5 different topics: 1.The transfer of energy by heating processes and the factors that affect the rate the.
Assessing the Damage Potential in Pretensioned Bridges Caused by Increased Truck Loads Due to Freight Movements Robert J. Peterman, Ph.D., P.E. Martin.
Pump Performance Testing. Goal: Measure the pump curve(s) Head versus flow rate:Efficiency versus flow rate:
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Planetary Lander PDR Team Name
Case sample of a CT option
P07203 Dynamometry Laboratory Infrastructure
Module – Groundwater Level Measurement
P17082 Biomechanical Elbow Model Detailed Design
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
STRAIN GAGE CHARACTERISTICS
MSD P15280 RIT HOT WHEELZ TEST BENCH
Waste Heat Recovery from PV Panels
Rapid Automation Design
BACK UP P09045: Membrane Characterization Test Stand
FPGA Vinyl to Digital Converter (VDC)
<Your Team # > Your Team Name Here
Detailed Design Presentation
Detailed Design Review Solar Thermal Water Heater
Preliminary Detailed Design Review: P18001
Presentation transcript:

SPX Data Acquisition PRELIMINARY DETAILED DESIGN REVIEW John Dong David Haller Adam Johnson Thomas Klaben Luke Kranz

Presentation Agenda Phase Objective Statement(2 Minutes) Lab Setup(3 Minutes) Schematics(10 Minutes) Telemetry Wiring Diagram Strain Gauge Wiring Diagram Overall System Transmitter Case Flow Charts(5 Minutes) Data Energy Procedures(5 Minutes) Operations Manual Expectations Assembly of Telemetry Case Wiring Installation – Strain Gauges Proof of Concepts/Feasibility(10 Minutes) Gauge Mounting Gauge Removal Wire Waterproofing Transmission Through Case Test Plans(5 Minutes) Gauge Accuracy Case Waterproofing Project Management(10 Minutes) Engineering Requirements Bill Of Materials New Purchases Risk Assessment Detailed Design Project Plan Questions(10 Minutes)

Phase Objective Statement Overall Objective: ◦To provide SPX with a system capable of measuring strain on an operating impeller and then wirelessly transmitting the data to a third party user interface. The system is to be validated on a small-scale setup and then transferred to a full-scale setup. Goals for this Phase: ◦Set up lab space for small-scale testing ◦Compile and update all project and design documents ◦Trace designs back to customer and engineering requirements ◦Continue to purchase components and write test plans to validate specs ◦Continue feasibility studies on subsystem designs ◦Revise designs based on new findings

Lab Setup Location ◦Institute Hall Room 2180 Supplies ◦34” diameter stainless steel tank (134 gallon capacity) ◦1.25 hp motor ◦1000W variable frequency power supply ◦R&D impeller for small- scale mixing ◦Gauges ◦Wires ◦Soldering iron and solder

Schematic Telemetry Wiring Diagram

Schematic Strain Gauge Wiring Diagram

Wire tables

Schematic Overall System Changes to transmitter case Removed wire tube Spiral wires up shaft to case

Schematic Transmitter Case

Flow Chart Data

Flow Chart Energy Details the path of energy flow throughout the Wireless Strain Measurement system.

Procedure Operation Manual Expectations Pending Documentation: Node Commander Software Setup & Installation Base Station Configuration Data Logging Procedure

Procedure Installation – Strain Gauge Surface Preparation ◦Solvent degreasing ◦Surface abrading ◦Application of layout lines ◦Surface conditioning Gauge Bonding and Waterproofing ◦Handling and gauge preparation ◦Gauge placement using cellophane tape ◦Bonding with quick dry adhesive (super glue) ◦Waterproofing with epoxy Images courtesy of

Proof of Concept/Feasibility Gauge Mounting Question: Will we be able to mount gauges onto impellers? Will they stay mounted once underwater? Method of Test: Consult subject matter expert on best adhesive and waterproofing agent. Use suggestions and practice mounting on scrap metal. Subject Matter Expert: Rob Kraynick. Suggestions: Thin layer of super glue for adhesive, layer of epoxy for waterproofing. Gauges will only be usable once, and should have ribbon connections to avoid soldering damage. Proof of Concept: Conclusions/Learnings: ◦We must practice cleanly attaching gauges and using the least amount of epoxy/adhesive as possible. ◦Gauge lines will be needed to guarantee accurate placement. ◦Underwater adhesion testing will begin once we fill stainless steel tank in lab space.

Procedure Assembly of Telemetry Case Wiring

Procedure Strain Gauge Wiring

Proof of Concept/Feasibility Gauge Removal Preliminary Test: 1.Affix gauge to test sample. Place known load on sample, creating a known strain. 2.Remove gauge. 3.Affix gauge to test sample in same location. Re-test with the same known load. 4.If second strain reading is within 2% of initial reading, gauge can be reused. 5.Repeat until gauge measures a strain that is greater than 2% of the initial strain. 6.Record number of times the gauge was removed and the process used to remove the gauge.

Proof of Concept/Feasibility Gauge Removal Revised Test: 1.Affix gauge to test sample. Place known load on sample. 2.Use calculations to determine if the gauge is placed accurately on the test sample (see: Gauge Accuracy Feasibility). 3.Remove gauge. Record method of removal and any visual defects created by the removal of the strain gauge. 4.If any visible gouges are created while removing the gauge, the tested process fails and will be revised.

Proof of Concept/Feasibility Wire Waterproofing Feasibility Results: ◦Liquid Electrical Tape Insulates Underwater Wires ◦Heat Shrink Wrap Insulates Wires underwater Deltas: ◦Care must be taken with the wires once coated in electrical tape to not bend to extremes ◦When using heat shrink wrap make sure no stray wires are sticking through ◦Use a Real heat gun ◦Use multiple Waterproofing methods where possible

Proof of Concept/Feasibility Transmission Through Case Concept: Based off of cell phone Research we should be able to transmit through plastic Phones only need antenna lines to transmit through metal. Make a test plan to test for range reduction

Test Plans Gauge Accuracy/Calibration Clamp test piece to perform tests. Affix strain gauges a measured distance from the free end of the test piece. Apply a load on the end of the clamped test piece (cantilevered beam model) Calculate stress and strain as follows: Determine moment using singularity functions: q(x) = P -1 M(x) = P 1 = P(x) Where x is the distance from the free end of the test sample Stress Calculations: σ = -MC/I Where C is one half of the beam thickness and I = (1/12)bh 3 Strain Calculations: ε = σ/E = -MC/EI Where E is Young’s Modulus If the calculations and the actual experiment yield results within 5%, this shows our gauge placement and calibrations to be accurate.

Test Plans Case Waterproofing Spec S12: Submerged in water at depth of 1 meter for 1 hour with less than 0.1 grams of leakage Test plan: 1.Take enough sponges to fill case 2.Weigh sponges 3.Place sponges in case 4.Submerge case in water at depth of 1 meter for 1 hour 5.Take sponges out of case 6.Weigh sponges 7.See if difference in mass is less than 0.1 grams

Project Management Engineering Requirements

Project Management Bill of Materials

Project Management New Purchases Item: Telemetry System Brand: Lord Microstrain Price: $ Delivery: November 27, 2015 Item: Semi-Conductor Gauges Brand: Micron Instruments Price: $22.11 each Delivery: November 16, 2015 Item: Ribbon Gauges Brand: Omega Price: $13.60 each Delivery: November 10, 2015 Budget Update: $ /$5000 = 49.07% budget spent

Project Management Risk Assessment

Project Management Detailed Design Project Plan

Efficiency Schematics- 25% 1.Finished Schematics, realized no room for ground wire in plug 2.Changed to add new plugs 3.Found wiring error while doing wire tables, so recompleted tables and second Schematic Cad Efficiency 33% 1.Improvements- Fellow member found latch CAD file which saved time 2.Needing two plugs in case, needed to redo case design 3.Changed case design to include antenna inside for less water intrusion points

Questions