12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.

Slides:



Advertisements
Similar presentations
10/03/ PHENIX WEEKLY PLANNING Oct. 3, 2013 Don Lynch.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
8/22/ PHENIX WEEKLY PLANNING Aug. 22, 2013 Don Lynch.
5/2/ PHENIX WEEKLY PLANNING 5/2/2013 Don Lynch.
6/7/20121 PHENIX WEEKLY PLANNING 6/7/2012 Don Lynch.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
10/31/ PHENIX WEEKLY PLANNING Oct. 31, 2013 Don Lynch Happy Halloween!
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
10/10/ PHENIX WEEKLY PLANNING Oct. 10, 2013 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
8/30/20121 PHENIX WEEKLY PLANNING 8/30/2012 Don Lynch.
6/27/ PHENIX WEEKLY PLANNING 6/27/2013 Don Lynch.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/2/20121 PHENIX WEEKLY PLANNING 8/2/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
3/29/20121 PHENIX WEEKLY PLANNING 3/29/2012 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
11/29/20121 PHENIX WEEKLY PLANNING 11/29/12 Don Lynch.
7/26/20121 PHENIX WEEKLY PLANNING 7/26/2012 Don Lynch.
9/13/20121 PHENIX WEEKLY PLANNING 9/13/2012 Don Lynch.
5/3/20121 PHENIX WEEKLY PLANNING 5/3/2012 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
7/19/20121 PHENIX WEEKLY PLANNING 7/19/2012 Don Lynch.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
8/29/ PHENIX WEEKLY PLANNING Aug. 29, 2013 Don Lynch.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
1/31/20131 PHENIX WEEKLY PLANNING 1/31/2013 Don Lynch.
823/20121 PHENIX WEEKLY PLANNING 8/23/2012 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
3/22/20121 PHENIX WEEKLY PLANNING 3/22/2012 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
10/4/20121 PHENIX WEEKLY PLANNING 10/4/12 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/1/20121 PHENIX WEEKLY PLANNING 3/1/2012 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
6/28/20121 PHENIX WEEKLY PLANNING 6/28/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
7/12/20121 PHENIX WEEKLY PLANNING 7/12/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
4/18/20131 PHENIX WEEKLY PLANNING 4/18/2013 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
9/5/ PHENIX WEEKLY PLANNING Sep. 5, 2013 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
Presentation transcript:

12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch

12/20/20122 This Week Continue installing VTX/FVTX (continue connecting cabling and services) Move MMS to run position Re-install MuID Collars Re-install EC dumbwaiter and ladder (evaluate ladder safety?) Continue RPC3 Gas Recirculation Upgrade Continue working on RPC3 shielding Continue window Washer safety upgrades Continue sPHENIX design support Continue MPC-Ex design support Begin Pink/White/Blue sheets

12/20/20123 Next Week & 1 st week of 2013 Christmas Holidays Monday & Tuesday 12/24-25 Most Staff on Vacation rest of the week Happy Holidays No meeting next Thursday 12/27/12 Continue RPC3 Gas Recirculation Upgrade Continue working on RPC3 shielding Continue window Washer safety upgrades Continue sPHENIX design support Continue MPC-Ex design support Continue Pink/White/Blue sheets

12/20/ RPC Recirculation Upgrade Recirculation Piping installation – Done GMH rack in progress Purification system controls assembly, installation and testing – D. Northacker in progress PC upgrade - Done Analyzer procurement in process (~4 months)

12/20/20125 RPC Background Attenuation Project Looking towards RPC3 North  EastWest  Looking towards RPC3 South  WestEast  Large shielding modifications at Q2 upstream north and south to be planned and installed by CA-D (Dave Phillips) by 12/14/2012. In progress this week

12/20/20126

7 Under DX at RPC3 South RPC Background Attenuation Project 144 Steel bricks, 2x4x8, stacked in 3 high, 16 wide, 3 rows, respectively by 11/21

12/20/20128

9

10 Window Washer Remote Pin Removal and Winch/spooler safety upgrades Space available: 16.5” x 27” x 28” h Space needed for model 20” x 32” x 32.58” h 55 º

12/20/ Other Subsystem Work and Future Upgrades related Work PHENIX Electronics Upgrades 1.Install second MODBUS server in counting house. - TBD Additional Work for 2012, not yet scheduled, to be fit in as available 1.identify obsolete services passing through sill and remove them. - As time is available 2.Cover for services coming from IR through sill. – After Shutdown 3.Plan for stripping out TEC electronics and services to free up TEC racks. - As time is available

12/20/ MPC-Ex Existing vacuum bellows anti-squirm In MPC S Cavity Proposed vacuum bellows anti-squirm In MPC S Cavity to accommodate MPC-Ex MPCS Flat cables replaced with round cables.

12/20/ sPHENIX Proposed Upgrade Work continues evaluating engineering tradeoffs for EMCal and HCal design, materials, etc. BNL Review last week Prototype HCal and EMCal in progress Silicon Photo Multiplier Holder

12/20/ Shutdown Schedule (Continued) Add several backup MTP fibers from CH to IR – NovemberDone MuID Collars to IR, plates, manlift and 12 ton cart to AH, & Roll in ECDone VTX Cooling System UpgradesDone Prep IR for run12/7-12/21/2012 RPC Recirculation Upgrade (except analyzer)12/21/2012 RPC Shielding under DX magnets12/21/2012 Window Washer pin & spool upgrades12/21/2012 Christmas Holidays12/21-1/1/2013 RPC tunnel Shielding (Dave Phillips)1/11/2013 Pre-run commissioning and prep for run 131/11/2013 Pink/Blue/White sheets12/12/12-1/11/2013 Start run 132/11/2013

12/20/ PHENIX Annual Safety Review Today - (Don, Paul, Rob) 2. Remember to lock all doors and secure equipment each day during the holidays Safety, Security, Etc.

12/20/ Safety and Security

12/20/201217

12/20/ Where To Find PHENIX Engineering Info Mayan Calendar Update