FERC Order 1000 and its Potential Implications for BCCPG Transmission Providers BCCPG Steering Committee Meeting 20 September 2011.

Slides:



Advertisements
Similar presentations
E-Tariff - The Problem with Joint and Shared Filings Presented by National Grid NAESB E-Tariff Conference Colorado Springs January 23-25, 2008.
Advertisements

WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Reliability in British Columbia
1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
ERO Filing and WECC Delegation Agreement Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake.
WECC Reliability Management System
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
Cost Allocation & Resource Sharing In a One-Stop Environment Two distinctly different concepts.
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Shawn Davis Regional Policy and Operations Analyst Portland General Electric Proposed Mid-C Scheduling Changes August 20, 2014 Interchange Scheduling and.
Northwest Electricity The Council An interstate compact of ID, MT, OR and WA, not a federal or state agency. An interstate compact of ID, MT, OR and.
Montana Energy Summit Transmission Planning Process April 22, 2008.
Reno, NV December 18,  Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update 3. SB 123- NVision 4. Stakeholder Input 2.
Western Planning Regions Interregional (IR) Coordination Activities
Reno, NV June 26,  Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update ◦ SB 123- NVision 3. Generator Interconnection Updates.
Sue Sheridan President and Chief Counsel Coalition for Fair Transmission Policy EEI Transmission and Distribution Conference April 2012 TRANSMISSION PLANNING.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
The Transmission Imperative November 3, 2011 Jay Caspary.
Introduction to Bonneville Power Administration
The Value of Electric Transmission NASUCA Mid-Year Meeting June 25, 2012.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
NERC Compliance Program Overview FRCC 2007 Compliance Workshop April 4 and 11, 2007.
Chelan County PUD March 16, Staff recommendation for license action and resolution License Order Rehearing and Clarification Rehearing Items License.
Opportunities for interregional cooperation in Regional Operational Programmes: Article 96.3.d) of the Common Provisions Regulation INTERACT Future Pilot.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
COMMON USE SYSTEM March 5, 2008 Black Hills Power Service Center Rapid City, SD TRANSMISSION COORDINATION AND PLANNING COMMITTEE.
Overview of WECC and Regulatory Structure
WECC Response to DOE Funding Opportunity on Regional Planning Northwest Wind Integration Forum Steering Committee January 6, 2010 Tom Schneider Managing.
Transmission Planning at the California ISO September 10, 2015.
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
Transmission Owners and Operators Forum NERC Stakeholders Meeting 8/1/06 Ad-Hoc T. O. O. Forum Group.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Updated 1/28/2011.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
Forming a Cost Assignment/ Cost Recovery Team RMATS Steering Committee January 13, 2004.
Federal Aviation Administration Clarification to Policy and Procedures Concerning Use of Airport Revenues; Proceeds from Taxes on Aviation Fuel Presented.
Congestion Management in a Market Environment David Nevius Senior Vice President North American Electric Reliability Council.
Standards Review Subcommittee Update August 17, 2010.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American.
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
1 Entergy Transmission Planning Summit Transmission Planning & Budget Process Doug Powell New Orleans, LA July 10, 2003.
Source: americans for a clean grid. CAISO - FERC 1000 Update CTPG is now WestConnect- strong relationship Inter-regional key coordinator (public policy.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
MAC Board Effectiveness Survey
WECC PCC Meeting July 15-16, 2014.
Massachusetts Electric Restructuring Roundtable
Two Energy Facility Permitting Reforms: New Hampshire’s Site Evaluation Committee, and the Federal FAST-41 Tom Burack, Esq., Sheehan Phinney New England.
FERC Order 1000 One Transmission Owner’s Perspective
MIC Committee Discussion
BHP 2015 Formula Rate True-Up Meeting
FERC NOI on Incentive Rates
The Electric Reliability Organization: Getting from here to there.
Mandatory Reliability Standards
Great Lakes Wind Collaborative: Who We Are and What We Do
WECC PCC Meeting July 15-16, 2014.
MAC Board Effectiveness Survey
MIC Committee Discussion
Offshore Wind Transmission:
Presentation transcript:

FERC Order 1000 and its Potential Implications for BCCPG Transmission Providers BCCPG Steering Committee Meeting 20 September 2011

Issued in July 2011 –Effective Date: 11 Oct, 2011 –Compliance filings: 11 Oct 2012 & 11 Apr 2013 Builds on reforms of Order 890 Requires transmission planning at regional level that results in a transmission plan Requires that cost of transmission solutions chosen be allocated fairly to beneficiaries NOTE: FERC’s use of word “regional” equates to ‘sub-regional” in West FERC ORDER 1000

Sub-regional Planning Groups in West

BC Coordinated Planning Group Formed in March 2011 Composed of transmission facility owners within British Columbia Goals of the BCCPG: –Promote efficient development of the electric transmission system; –Provide a forum for interaction with other utilities, sub-regional planning groups and stakeholders within the WECC as transmission plans are developed; and –Enable coordination of regional and subregional planning activities.

Transmission Planning Participate in a regional transmission planning process; Produce a regional transmission plan; Consider federal and state public policy requirements; Transmission providers in neighbouring regions must coordinate on efficient/cost-effective solutions; Distinction: facilities in a plan vs facilities “selected for cost allocation”.

Cost Allocation Each regional transmission planning process must have a cost allocation method that satisfies 6 regional cost allocation principles; Neighouring transmission planning regions must also have a common interregional cost allocation method; Participant funding is permitted but not as cost allocation method; If region cannot decide on cost allocation method, FERC will decide for it!

Clarification/Rehearing Requests Many entities concerned about Rule and have filed clarification/rehearing requests: –FERC exceeding authority –Allocation of costs to beneficiaries outside region –States’ rights and role –Cannot impose requirements on non-jurisdictionals Requests for rehearing or clarification were filed by several PNW entities including: –Northern Tier Transmission Group –Bonneville Power Administration –Iberdrola