Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

WAREHOUSING MANAGEMENT
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
CMS - PAVIA1 Engineering Design Review RPC - BAKELITE.
SAMPLING PROCEDURES.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Compressor status AWAKE Technical Board meeting 19 August 2015.
The RPC Closed loop Gas System Slides from Bianco and Guida.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
India CERN Meeting, BARC, 28/02/11
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL for the Up-Scope of the RE in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Packing.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
RPC Barrel EDR Chapter 3 3. Production and control of Bakelite 3.1 Definition and standards Standard bakelite electrodes are composed by a bulk made of.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
New Bakelite production or Phase 2 Salvatore Buontempo (INFN, Naples & CERN) on behalf of CMS Central TC Group Atlas & CMS meeting RPC Phase 2, November.
Updated Resistivity measurement on Mm-Batch-4 Bakelite & RPC Bakelite sample measurements Liang Guan TGRPC R&D Biweekly meeting
QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
GT expedition to check on PU contamination as reported by KODEL Paolo Vitulo Ian Crotty 23/4 February 2012.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Cables for the RE4 Upscope in CMS
University of Wisconsin
CHAPTER XII SHIPPING DOCUMENTS
Quick Response Manufacture (QRM)
Schedule CM SPS G.Vandoni.
Production ad Quality control of RPCs for the CMS muon barrel system
Pierre-Alexandre Thonet
HPL DG d=1.4mm/e= mm.
Status of the PANDA Solenoid Magnet Production in BINP
STAR TOF MRPC Mass Production & Q.C. (USTC)
Unit 31- LA B Production Planning for Engineering
Status of the PANDA Solenoid Magnet Production in BINP
The Bunker Project Overview Zvonko Lazic
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Bunker Project Schedule/Budget
Presentation transcript:

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Cutting, Packing & Transport Production Rate Scheduling Conclusion

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 CMS End-cap RPC Bakelite High Pressure Laminate (HPL) Specification was taken from the Barrel RPCs 1-6 x10^10 20°C. Average roughness (Ra) = <0.2micrometre, 2mm thick Melamine surface paper with Phenolic Bulk Sheet dimensions according to cutting plan Temperature coefficient w.r.t resistivity is given by the raw material and obtained for normalisation during QC It would be good to go back and check that we are still getting this value for the roughness

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 Contingency, Past & Present for RE4 Chambers An Estimate of 10% for Chamber spares gives; 72 chambers/ station/ endcap + 10% = 160 Total. Spares in ISR today = 11. RE2, RE3 and RE4 = 432 chambers requiring 45 – 11 = 34 Rounding this up gives puts our needs at 200. HPL From previous experience we have found an increase in contingency of delivered HPL quantities from 43% to 50% was necessary. This value should be retained. Using the original 1.3m x 3.2m dimensions we will therefore need 600 sheets. Surface area ~ 3000m 2 and weight is approx 5 tons. Financial resources necessary range from 70 kEuro to 90 kEuro dependant on the manufacturer.

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL and Gap Supply Chain HPL Manufacturer Production and Initial QA & QC Cutting to form (Riva in Milano ?) GT (Roma) Surface treatment with MEK Korean Gap Assembly Shipping by Air and/or Maritime Order from CERN To HPL source Final QA and QC (in Pavia ?) Assembly Site or Sites Assembly Site or Sites Assembly Site or Sites

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 PurchasingPurchasing First step is the budget. If CERN managed then tax free As the amount 70kEuro is > 100kchf then a divisional request is needed. No call for tender and time for suppliers to reply. Justification for “single source” order. All this takes some time, we should move ahead asap

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 Resistivity QC inhouse This device could be used to do the pre-selection before shipping for final QC Also used to Calibrate the Resistivity table

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 The Phenix QC experience July 08 Colleagues from the US have successfully used the Resistivity table that was in the Pavia University. Nine pneumatically actuated conductive rubber pads acting as electrodes applying 1kV

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 A production run from 2003 This a good run as few sheets are out side the acceptance limits of 2- 6 x Ω.cm. Yield is 77% Rejection rates can vary from 5 to 95% !

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 Yield for Phenix There are now two levels of selection each of which will expect a certain loss. In the case of Phenix during July 2008; 1;Factory tests Produced410 Selected317Yield = 77% 2;Pavia University Jig Received 317 Selected262Yield =83% Overall Yield= 64% Production rates 24 – 48 sheets per day. Only sheets that are within our spec are paid for. Phoenix and CMS use the same panel size 1.6 x 3.2m

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 Riva Milano Cutting to Form CNC tooling Cycle time 5mins/sheet HPL QC on dimensions. Tolerance +0mm and -0.5mm Checking cutting head and stability of panel retention

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 Packing for International Transport Fork lift damage A simplified version The Load is not attached to the base and has slipped Looks fine but is heavy and expensive

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 Production or Throughput Rates The production rate capability of PanPla was large. However the HPL has to stabilised in the Air-conditioned hall for QC were its humidity and temperature can be controlled to some degree. This limits the quantity per production batch to some 300 sheets, weighing in at approx 2.5 tonnes, it takes a few days to stabilise. This quantity was sufficient on occasions, if the yield was ~70%, for the 216 sheets required to build half a full station, with 30% contingency. Riva will take 2-5 days to cut this material and repack but will not want to work continuously as the main machine is occupied as is the floor space and personnel. This results in 2 boxes of some 600kg to ship to Korea where space is also limited.

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 Installations possible in September 09 and February 10 First HPL to Kodel in Early December 08 Four Gap production periods REplus 2 RE minus 2

Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 ConclusionsConclusions The consequences of shipping around the world,firstly within Italy then to Korea and on to the production site(s) and back to CERN are; Many people involved, costs, errors and delays Damage during transit Loss of control of environmental conditions. Very high lead time The initial outlay is high for the HPL contract High transport costs especially by air freight. Different QC stages require people and time. Insurance should cover any losses but not the delay We managed for the Baseline and we can do it again but with better organisation for the Up-scope