Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.

Slides:



Advertisements
Similar presentations
Daniel Schoerling TE-MSC-MNC 1 Review of AD-ELENA TL dipole Daniel Schoerling on behalf of WP 2.2 ELENA IIC meeting 27 th February 2014.
Advertisements

September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
BRC Food Safety Quality Management System Training Guide
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Daniel Schoerling TE-MSC-MNC 1 Magnets Daniel Schoerling on behalf of WP 2.2 and WP 2.16 ELENA Project Review 14 th – 15 th October IT.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
1 1. Some recent views ( ) 2 Linac tunnel
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
Consolidation of the Booster Injection Quadrupole Magnets (part 2) A. Aloev 14 th February 2013.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Correctors magnets V. Zubko, IHEP, Protvino SIS 300 Pre-consortium Meeting Thursday 19 March 2009, Protvino.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
Linac4 Tech. Design Committee 10 th October 2006 Thomas Zickler AT/MEL/MI/tz 1 Magnets for Linac4 Th. Zickler CERN 6 th Linac4 Technical Design Committee.
Linac4 MAC 29 th January 2008 Thomas Zickler AT/MCS/MNC/tz 1 Magnets for Linac4 Th. Zickler CERN Linac4 Machine Advisory Committee 28 th - 30 th January.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
ELENA installation progress F. Butin / ELENA collaboration.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
One plane dipole corrector for the CLIC MBQ TYPE 1
World Health Organization
Transportation of Class 7 materials: Compliance & Regulatory issues
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Procurement, Measurement and Installation of 2 Octupoles for ATF
Equipment simplified model SMR UR safety
Magnet Power Supply System Overview
Configuration Management and Layout Database ELENA Project
(Procurement, testing of magnets)
EFREMOV INSTITUTE SAINT PETERSBURG RUSSIA
Arc magnet designs Attilio Milanese 13 Oct. 2016
Main magnets for PERLE Test Facility
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Compact and Low Consumption Magnet Design The DESY Experience
Potential Use of PEP-II Magnets by Project X
ELENA Magnet Installation Planning
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Status of the PANDA Solenoid Magnet Production in BINP
Workshop commissioning Installation Coordination at ESS
PSS verification and validation
Presentation transcript:

Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December 2013

Philip Schwarz TE-MSC-MNC 2 Overview I.Introduction and scope II.Contents III.Status

Philip Schwarz TE-MSC-MNC 3 I Introduction & Scope Design phase Procurement & Installation Contract Follow-Up Magnetic Measurements at CERN Installation Functional Specification Design Report Engineering Specification Technical Specification Tendering & Contract Award Incoming Inspection & Certification ES is issued after the approval of the design report Part of the design phase because it defines interfaces with other WP ES is an CERN internal document only Shows the intended design and interfaces of the magnets

Philip Schwarz TE-MSC-MNC 4 I Introduction & Scope Engineering SpecificationTechnical Specification Level of detailBasic description of the designVery detailed description of design Manufacturing methods Described in basicsDescribed with high detail and acceptance criteria defined TestsNot describedDescribed for each production step InterfacesDescribed in detail to clarify responsibilities within CERN Only shown in drawings as to be followed UsageInternal communicationTendering and part of the contract, legal document

Philip Schwarz TE-MSC-MNC 5 II Contents Chapter 1: Introduction The introduction contains general information about the ELENA project and the designation for the magnet Further the number of elements and the basic cooling principle are shown This chapter is intended as a general overview for the contents of the document ParameterValueRemark TypeDipole CoolingWater-cooled Drawing codeAD_MBHEK Design and equipment codePXMBHEKCWP Number86 (ring) + 1 (B-Train) + 1 (spare) Example: Main bending magnet (MBR)

Philip Schwarz TE-MSC-MNC 6 II Contents (continuation) Chapter 2: Magnet design This chapter depicts the parameters resulting from the mechanical and the electromagnetic design. The individual components yoke, coil, support and alignment are described. Main performance relevant parameters of magnet are mentioned throughout the subchapters, i.e. information about the required power converter, the required cabling, the weight and dimensions, etc.

Philip Schwarz TE-MSC-MNC 7 II Contents (continuation) Chapter 3: Interfaces of WP 2.2 to other work packages This chapter defines the interfaces between the magnets and other work packages The responsibilities and names of the work packages are according to the management document EDMS no The corresponding section should be checked by each WPL to ensure the integration of the magnets into ELENA

Philip Schwarz TE-MSC-MNC 8 II Contents (continuation) Chapter 4: Safety Aspects This chapter shows all the different security aspects to be considered when operating and handling the magnet: Electricity risks: IP2X, Grounding according to EDMS (protection of equipment only). Magnetic field risks: Magnetic fields below 1 T. Water risk: Spraying of water to other equipment cannot be excluded. Overheating and fire risks: thermo-switches, flow-switches (water cooling only), all materials conforming with IS41. Radiation hazards: at least 1 MGy radiation resistant

Philip Schwarz TE-MSC-MNC 9 III Status Main bending dipole (MBR) Approval deadline was and should be released soon Normal quadrupole (MQR) Released on Skew quadrupole (MQS) Some minor comments open from approval Sextupole (MXR) Mechanical design open; design report not approved yet, should be sent out for engineering check until the end of the year Corrector (MCR) Electromagnetic and mechanical design to be re-visited after review Transfer line dipole (MBL) Some minor comments to be implemented after the engineering check

Philip Schwarz TE-MSC-MNC 10 III Status (continuation) Design- Status Element type Label Short label Total number of magnets Aperture in mm Good- field region in mm Integrated field homogeneity Magnetic length in m Mechanica l length in m Maximum field strength Minimum field strength Instrumentation Bending Magnet, Horizontal PXMBHEKCWPMBR (H) x 48 (V) ±2  T0.05 TNone Quadrupole, Normal PXMQNLGNAPMQR13  124  54±5  T/m0.02 T/mBPMs Sextupole, Normal PXMXNADNAPMXR5  89  40±2  T/m T/m 2 None Quadrupole, Skew PXMQSABNAPMQS3  124  46±1  T/m0.023 T/mNone Corrector H+V PXMCCAYWAPMCR9 (+2)  124  44±1   Tm (integrated) -BPMs SolenoidPXMLNAFNACMLR3TBD -None Design- Status Element type Label Short label Total number of magnets Aperture in mm Good- field region in mm Integrated field homogeneity Magnetic length in m Mechanical length in m Maximum field strength Instrumentation Bending Magnet, Horizontal PXMBHCBCWPMBL (H) x 48 (V) ±1  TNone Quadrupole, Normal PXMQNLGNAPMQR3  124  54±5  T/mNone Quadrupole, Normal PXMQNAFNWPQPMA1  60  20±2  T/mNone Corrector H+V PXMCCAYWAPMCR4  124  44±1   Tm (integrated) None ELENA RING TL AD to ELENA Fixed parameters, further changes require a formal Engineering Change Request (ECR) for green and yellow items!