May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.

Slides:



Advertisements
Similar presentations
100[ch] 0.28[ps/ch] 200[ch] 0.54[ps/ch] TDC-calibration.
Advertisements

The MAD chip: 4 channel preamplifier + discriminator.
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Time over Threshold Electronics for Neutrino Telescopy George Bourlis + multiplicity.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
1 TPC online  offline calibration November 2002.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
S-2S memo WC Toshiyuki Gogami 24Apr2015.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
St4 Prop Tube Mapping 05/15/2011 Ming Liu This is a mapping diagram for St-4 prop tubes Facing a module/FEM: – ECL Channels counted from right (1) – to.
Testing of Latch-TDC Da-Shung Su Jia-Ye Chen, Hsi-Hung Yao, Su-Yin Wang, Ting-Hua Chang, Wen-Chen Chang 2011/07/13.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
1 P. Wilson DAQ Meeting 3/3/99 TDC Full Crate Test l Goal is to test TDCs in environment of full crate of cards äTests at Michigan limited to a few cards/crate.
PMT Readout and Floor Triggering Charge estimation using the times over the thresholds Event Building and Triggering + multiplicity George Bourlis.
MRPC Beam GSI Yongjie Sun University of Science and Technology of China.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Methods to reduce dead time and achieve higher trigger rate. Sparsification Event blocking Parallel DAQ systems SFI Sequencing.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
K0 meeting 2007/10/17 Taito Kawasaki. ~ 10/8 (Mon) : Prepare for experiment 10/9 (Tue) : Beam on (1.0 GeV mode) | 9 days, 18 shifts | Normal run : 31.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication/ Test –Gate Generator (Jimmy) à Synchronized.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
LKr status R. Fantechi.
LAV front-end and readout status
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Setup for Cosmic Ray Test of VPA panel, using MiniDAQ
EMU Slice Test Run Plan a working document.
Conceptual design of TOF and beam test results
Trigger issues for the CALICE beam test
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
Presentation transcript:

May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG from ACE HV: +2000~2200 V Last plane (H): bottom modules 5,6,7,8 – 4 ECL cables/one TDC card TDC with global pulser – cosmic trigger from ST4-Hodoscopes, 2H+1V – HV off TDC with cosmic trigger – Global pulser ON – HV on

May 15, 2011

Cosmic trigger

First full TDC readout with ST4- hodoscope cosmic trigger One TDC card (new one, w/ 2nS step) – 4x16 channels (4 cables) Global external pulser delay = 2 uS – External pulser connected to modul 8 Read out up to 8 samples per channel – 2nS step, 0xee1 = 3809 x 2nS = uS Cable-1 (mod 8; 1(top)-9(bottom)) – Some hits, but none close to “8uS” Cable-2(mod 7) – Most hits close to “8uS” Cable-3(mod 6) – No hits, bad FEM? Broken pulser input? Cable-4(mod 5) – Every channel has hit, and close to “8 uS”

State of the art DAQ and Control

Trigger and readout setup Cosmic trig. Delayed pulser data Com. stop 010 uS ΔT ~ 2uS Some after pulses (noise) TDCs (<=8 samples) TDC 8 uS! 8 uS start stop

Cosmic signal and trigger/com. stop

Cable-4 (mod. 5) TDC from external pulser (cosmic trigger), HV=off 8 uS! Noisy channel!

Second readout test Global pulser Delay 5uS Some DAQ problems – DAQ auto self rebooting … Pulser causing the problem? Some grounding issues? DAQ runs fine without pulser Data volume too large? Further test needed

Cosmic data! Com. Stop delayed 5 uS HV=2200 V Black: all samples Blue: the first sample only 5.0 uS

Module 4: TDCs (16 chan.)

Trigger, data, Com-Stop a lucky shot!

The challenge: what are they?!

Gifts from God

LV cables

Gas lines

LV and HV racks

To do list LV – Replace the cooling fans – location – LV cables from PS to chambers HV – How many channels do we need? 4? (2 modules) 4x9=36? (18 modules) – Location – Cables from PS to chambers Signal – Rack location – Cables 4x9 = 36 Calibration pulser driver – NIM able to drive all 9 modules per plane, -1V, XX mA? – Gate generator : voltage sagging ~ [-0.5, -0.8] Gas panels (4)

Trigger