1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.

Slides:



Advertisements
Similar presentations
ALICE TPC Ne/CO2 Gas System. Mixing Rack CO 2 -Removal & (O 2,H 2 O)- Cleaning Rack.
Advertisements

1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
A. Vascotto - 15 December 2003ALICE Technical Board1 ECS TDR highlights Activities Milestones Core team: Franco Carena Jean-Claude Marin Sandro Vascotto.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
André Augustinus 16 September 2002 Safety issues.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Status of HO Installation and Commissioning Shashikant Dugad (DHEP, TIFR) India-CMS Meeting BARC, July 2007.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
André Augustinus 9 October 2006 Interlocks update.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
1 Infrastructure and DCS Presentation of the Infrastructure Controls aspect in the ALICE DCS Based on U ser R equirements D ocument …you should still know.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
TC meeting P2 planning wks 3&4 A.Tauro
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
DCal-ALICE integration and installation plan and status A. Tauro.
ATLAS Plenary, Feb. 18th, 05Commissioning1 Report on the commissioning activities G. Mornacchi, P. Perrodo and Sub-Systems Collaborators.
(Alice COsmic Ray Detector) Status Report
TS2 preparatory meeting
Alice TPC DCS.
TPC Detector Control System
Presentation transcript:

1 DCS Status & Plans 22 June 2004 L.Jirdén

2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE GAS MON COO subsystems LSR HV LV FEE GAS MON HV LV FEE HV LV FEE GAS HV LV FEE GAS MON HV LV FEE MON HV LV FEE MON ROD VHVHV LV GAS MON HV LV FEE CCO HV LV MON HV FEE MON HV LV GAS MON HV LV FEE HV LV GAS MON HV LV FEE HV FEE HV LIQ GAS HV LV GAS MON GMS TSCOO MON PLS 1 st draft URD exists Discussion started Not started or unknown FEE CRT

3 Prototyping status DCS Detectors … TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE GAS MON COO subsystems LSR HV LV FEE GAS MON HV LV FEE HV LV FEE GAS HV LV FEE GAS MON HV LV FEE MON HV LV FEE MON ROD VHVHV LV GAS MON HV LV FEE MON HV LV MON HV FEE MON HV LV GAS MON HV LV FEE HV LV GAS MON HV LV FEE HV FEE HV LIQ GAS HV LV GAS MON ALI COO MON PLS 1st version implemented started not started but common solution exists Unknown or not started CRT

4 Plans for 2004 u Setting up a DCS lab u For development and test of u DCS infrastructure; powered racks, network (isolated), computers u ALICE DCS Back-end system u Common sub-system solutions u Available to detector DCS developers u For DCS reference systems u Systems to be installed u Test-beam support u TPC – May 04 u ITS – October 04 u Others? Where? When? What?

5 Plans for u Pre-installation at surface of P2 u TPC – start Dec 04 u HMPID – start Jan 05 u Others u Where? When? What? u Final installation at P2; detailed planning for each detector required u DCS Hardware infrastructure; u Common to all detectors; in two batches u Back-end system: common to all; operational versions; updates u Services: u power, safety common to all, u cooling & gas individual for each detector u Detector applications: individual for each detector

6 Pre-installation on surface Final installation in UX Commissioning Schedule & Milestones HW infrastructure Back-end + services Detector sub-systems Integration with DAQ/TRG/HLT M1 M2 HW infrastructure Back-end + services Detector sub-systems Integration with DAQ/TRG/HLT M3 M4 Individual detectors Groups of detectors Whole experiment M5M6M7M8