WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.

Slides:



Advertisements
Similar presentations
Barhale Procedure for Site Establishment
Advertisements

UNIVERSITY of NORTHERN COLORADO HOT WORK PROGRAM.
Emergency Preparedness and Response
Biodiesel & Fire Permits Presented by the Seattle Fire Department for the Department of Ecology Biodiesel Permitting Workshop Seattle, Washington February.
Utility Management Providence Health System - Oregon Environment of Care.
SERVICE STANDARDS Missouri Medicaid Audit and Compliance Provider Certification Review Materials.
 Violations of the following regulations WILL result in a loss of lab points.
Prerequisite Programme Training Guide
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
SERVICE STANDARDS Missouri Medicaid Audit and Compliance Provider Certification Review Materials.
WELCOME New Safety Coordinators! New Safety Coordinator Spring Orientation January 24, 2012.
YEAR 10 WORK EXPERIENCE 7 th to 11 th July Phase 1  Students should start looking now for their own work placement.  If you receive a positive.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
RCRA 101 Michael Gage New Jersey Department of Environmental Protection County Environmental and Waste Enforcement Special Investigations and Oversight.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Construction HSE Guideline _ 2005
John Robert Etheridge, TS/HDO, Health and Safety Coordinator for the installation of the LHC and its Experiments Enviromental Health and Safety – managing.
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
EN/CV/DC Fluid analyses and Radiation Protection monitoring Presentation done by Elena Perez Rodriguez For further information contact
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
I st Workshop on issues and trends from the European IRRS missions, 22 – 23 January 2014, Brussels Authorization Improvements: Establish within the regulatory.
Hot Work Procedures Fire Control. Cutting and Welding Where practicable all combustibles shall be relocated at least 35 feet from the work site Where.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Energy, Environment and National Security Directorate (EENS) Best Management Practices in the Experimental Safety Review Program Robert Doty Experimental.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
COMMUNITY VISITOR TRAINING Quality Lifestyle Support Enhancing the Lives of Individuals.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Solvent machine cleaning - Risk analysis 1/22 L.Bardo - PH-CMX 04 December 2015.
Health and Safety Coordination at CERN Environmental Health and Safety managing risks today for a safer tomorrow John Robert Etheridge, Emmanuel Paulat,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
YEAR 10 WORK EXPERIENCE 8 th to 12 th July  Phase 1  Students should start looking now for their own work placement.  If you receive a positive.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Hot Work Permit Osan AB Fire Emergency Services.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Final Rule for Sanitary Transportation. Background Proposed Rule: February 5, 2014 Public Comments: More than 200 Final Rule: On Display April 5, 2016.
12/07/2006 Rev B1 T-1160 Work Permits This work has been produced by DGL (Aust) Pty Ltd This Learner’s Tool is about the skills and knowledge required.
Crab Cavity Technical Coordination meeting:
Some arrangements for personnel safety 1- Procedures for access
East Area Renovation Project Team meeting # 2 – EDMS News
Safety in the Neutrino Platform Hall
Equipment simplified model SMR UR safety
1.3-GHz Cavity Vacuum Furnace at IB4
Safety Documentation EHN1
Safety rules for works supervisors
EP Experiments safety validation process Safety Permits
Chemical Purchasing.
Onsite Control of Visitors & Contractors
Installation Binder / IRR – an example
Warranty process.
12 Safe Maintenance Rules
Food Safety T-1150 This work has been produced by DGL (Aust) Pty Ltd
5th Review Committee October 4th, 2004 Facilities and Schedule C
Radiation Protection Handbook
Buildings Entrance Tunnel. 5th Review Committee October 4th, 2004 Buildings, Facilities and Schedule C. Sanelli.
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
This work has been produced by DGL (Aust) Pty Ltd
FARID Abdelmounim National Centre for Radiation Protection Morocco
Hot Work Procedures Fire Control.
Presentation transcript:

WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello

Facility Responsible : Claudio Silverio Montanari Safety Responsible : Erwan Bertrand Access in clean room : All installation/commissioning/repair activities to be done in clean room whether they concern infrastructure or the detector have to be documented and agreed upon in advance by the facility and safety responsible. Each activity has to be integrated into the general planning to avoid any conflict. (where is the planning set up and accessible ? Web page ? ) A work declaration and the authorization request shall be done by the activity technical responsible to the safety responsible in advance (at least 2 weeks before the beginning of activity)

Depending on the risks associated to the activity, a work package analysis will be performed. The need of a work package analysis is under the appreciation of the safety and facility responsible. The WP analysis meeting is composed of: Activity responsible Erwan + Claudio + all required expert During WPA meeting, all the crucial technical and safety issues are analyzed and agreed. A PPSPS (Special Safety and Health Protection Plan) and the activity procedure shall be submitted in advance.

It should pay particular attention to the description of all the special risks associated to the work to be performed and their counter measures. The following can be considered as “special risks”: Working at heights Hot work (welding etc.) Working with flammable gases Working with chemicals and solvents Working near high voltage installations Transport and use of radioactive sources or materials Cryogenics work …

The PPSPS shall contain : A short description of the work to be done. The list of material/equipment to be installed or removed from the clean room The list of people working in clean room, including the WP responsible person, contact person on the site. The list of the attended specialized training (ex : working at height, scissor lifts,…) followed by each person of the WP and which is required for the WP activity should be indicated in the document. A detailed schedule of operations, including deliveries and specific access conditions linked to them or the work to be performed. A safety assessment according to the documents with the detailed installation method and specific safety measures.

Detailed request for transport, power, water, compressed air supply, telephone or network connections, waste, … Detailed request for storage Lists of radioactive material (sources for calibration, etc) The necessity to issue an IS37 or a fire permit request is determined during the work package analysis. Erwan will be in charge of those operation and coordination safety measure with experts If required, a joint safety inspection is required before authorizing the activity.

My Questions : Access only if WP analysis done and PPSPS approved (put on EDMS) Access rights via EDH – who sign ? Claudio and Erwan ? Ask a new access right to Greg Smith Connect the door to EDH - When ? Working outside normal working hours ? 8:00 – 18:00 and after ?