ATF2 Magnets ATF2 Magnets KNU,Korea ATF2 mtgSpencer & Lam SLAC Lessons learned 1 Lessons learned from designing, fabricating & installing ATF2 magnets.

Slides:



Advertisements
Similar presentations
Lab Outreach Connectivity System. Fast & Secure Access To Results Wherever You Have Internet Access Save time calling for results through instant access.
Advertisements

Kit Building Class Lesson 4Page 1 R and X in Series Inductors and capacitors resist the flow of AC. This property is called reactance. Resistance also.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
Chapter 14: Troubleshooting and Problem Resolution.
Conventional Magnets Technology Discussion Summary At the LCFOA meeting, 1May at SLAC Cherrill Spencer, ILC at SLAC 2nd May 2006.
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
ATF2 Power Supply Availability Comparison February 5, ATF2 Power Supply Availability C0mparison Paul Bellomo and Briant lam.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
Electromagnetism
Brainstorming & Project Management
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer HOMEWORK PROBLEM for Lecture # 2 of.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
PV System Components Advanced Engineering The Technology Landstown High School.
19-21 Dec 20075th ATF2 Project Meeting1 Power Supply Progress and Magnetic Field Stability Summary By: Masayuki Kumada (NIRS) and Briant Lam* (SLAC)
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
© CCI Learning Solutions Inc. 1 Lesson 5: Basic Troubleshooting Techniques Computer performance Care of the computer Working with hardware Basic maintenance.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Suggestion Directive from Magnet Systems Group for how to name ILC magnet types Cherrill Spencer, ILC 2 nd May 2006.
Operations, Test facilities, CF&S Tom Himel SLAC.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
The Transistor Switch.  Computers work with Boolean algebra – two logic states – TRUE or FALSE  These states can be easily represented electronically.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
Lesson 9. * Testing Your browser * Using different browser tools * Using conditional comments with * Dealing with future compatibility problems.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
PHYSICS – Dangers of electricity. LEARNING OBJECTIVES Core State the hazards of: – damaged insulation – overheating of cables – damp conditions State.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
Risk Management Prepared For PMI Mid-Missouri Charles “Chick” Keller March 15, 2012.
KEK ATF2 High Availability DC Magnet Power Supplies Phase 2 Progress and Specifications 31 May 2006 Paul Bellomo, Antonio de Lira, Briant Lam and Dave.
I N T E R D I S C I P L I N A R Y HARDWARE DESIGN LABORATORY BEN-GURION UNIVERSITY OF THE NEGEV Department of Electrical and Computer Engineering Eugene.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
III ALTERNATING CURRENT Electricity is generated, transmitted, and used in the form of three-phase alternating current (AC). The current strength of AC.
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Idea for the low field dipoles near to IP in 2mrad crossing
CAD SITUATION ILD Meeting - March 6th, Sendai – Marc ANDUZE
SLAC Accelerators Power Electronic System Operation for Reliability
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
The ILC Control Work Packages
ATF2 Magnet Power Supplies
EDR HLRF Work Packages Draft Summary
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Brief Status Report on Fabrication of ATF2 Quads
Engineering Design Process
PHYSICS – Dangers of electricity. LEARNING OBJECTIVES Core State the hazards of: – damaged insulation – overheating of cables – damp conditions State.
Presentation transcript:

ATF2 Magnets ATF2 Magnets KNU,Korea ATF2 mtgSpencer & Lam SLAC Lessons learned 1 Lessons learned from designing, fabricating & installing ATF2 magnets and their power supplies that should be remembered for same tasks for the ILC’s BDS Cherrill Spencer, SLAC. Member of ATF2 Magnet Team Briant Lam, SLAC. ATF2 Power Supply Engineer

ATF2 Magnets ATF2 Magnets KNU,Korea ATF2 mtgSpencer & Lam SLAC Lessons learned 2 Lessons learned and comments on ATF2 magnet engineering, fabrication & installation Integration of magnets with rest of beamline apparatus needs attention of fulltime integration engineer from early-on in project Beamline installation drawings showing all beamline devices and their supports and their precise locations must be made before installation starts BDS will have magnets with tight harmonic & stability tolerances, avoid using old magnet designs or actual old magnets as they will rarely match the ILC requirements, quality will be compromised & money won’t be saved in the end Different countries have different standards and rules regarding magnet fabrication & integration. ILC-wide magnet group must develop, promulgate and enforce design + fabrication standards; integration rules (e.g. can a beampipe touch a magnet’s poletips?) If choose to have magnet vendors “build to spec” rather than “build to print” then must carefully review vendor drawings before they start fabrication & have on-going visits by ILC magnet engineer to their factory (later is best practice even if building to ILC-provided drawings) Have regular engineering meetings just on magnet issues via webex

ATF2 Magnets ATF2 Magnets KNU,Korea ATF2 mtgSpencer & Lam SLAC Lessons learned 3 Lessons learned and comments on ATF2 power supply engineering, fabrication & installation Understand the AC power grid of the lab where magnet PSs to be installed. –Neutral line on 3 phase power at KEK not available [used in a ground current detection circuit], SLAC sent bulk PS needing neutral Do not daisy chain extension cords; do not put too many devices on one circuit –Japan uses 100V AC at 50Hz, USA uses 120V AC at 60 Hz. Most 120V devices can deal with 100V, but daisy chaining etc causes ATF2 line voltage to drop to 80 V- then equipment misbehaves or fails. Keep Memoranda of Understanding up-to-date, have clear agreements on property transferrals –Donating the 44 brand new redundant PSs was impossible because not enough time to get all approvals and do paperwork Allow remote data acquisition so distant engineers can monitor the performance of the power supplies they designed and built and troubleshoot operating problems more effectively –A remotely accessible electronic logbook would help distant magnet & PS engineers monitor repeating problems and track reliability