12-1 Introduction to Product Costing Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 12.

Slides:



Advertisements
Similar presentations
Cost Management Chapter 10 Static and Flexible Budgets
Advertisements

Chapter 14 Measuring and Assigning Costs for Income Statements
Chapter 2 Job Order Cost Systems.
Basic Management Accounting Concepts Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson.
© John Wiley & Sons, 2005 Chapter 14: Measuring and Assigning Costs for Income Statements Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Cost Management.
14-1 Process Costing and the Cost Accounting Cycle Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 14.
Cost Management Session 7. Overview Theory Exercise: 10.33, 10.37, 10.56,
November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
16-1 Copyright  Houghton Mifflin Company. All rights reserved. Chapter 16 Operating Costs and Cost Allocation, Including Activity-Based Costing Belverd.
Contemporary Engineering Economics, 4 th edition, © 2007 Estimating Profit from Production Lecture No. 31 Chapter 8 Contemporary Engineering Economics.
Variable Costing Chapter 21 Exercises.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
ACC3200 Chapter 2: Job Order Costing Job Order Costing.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
1 Copyright  2010 & 2007 McGraw-Hill Australia Pty Ltd PPTs t/a Accounting: What the Numbers Mean 2e (revised) by Marshall, McCartney & Van Rhyn PowerPoint.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 13 Job Costing Systems.
8 - 1 StandardStandard/Budget AdvantageAdvantage of Standard Costs StandardStandard Setting Direct Materials- Direct Labor Var Manufacturing Manufacturing.
Accounting Systems for Manufacturing Businesses Chapter 10.
13-1 CHAPTER 13 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Accounting and Reporting Systems.
Needles Powers Crosson Principles of Accounting 12e Costing Systems: Job Order Costing 18 C H A P T E R ©human/iStockphoto.
Chapter Two Manufacturing Costs and Job-Order Costing Systems.
Cost Allocation and Activity Based Costing
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Cost Concepts and Cost Allocation
Variable and Full Costing Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 3.
1. Describe and illustrate income reporting under variable costing and absorption costing. 2. Describe and illustrate income analysis under variable costing.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
Chapter 23 Flexible Budgets and Standard Cost Systems
Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.
IE 475 Advanced Manufacturing Costing Techniques
Lecture 32 An overview of Topics. Chapter 01 Businesses, Multinational Corporations and Basics Concepts of Accounting.
5 -1 Job-Order Costing CHAPTER Describe the differences between job-order costing and process costing, and identify the types of firms that would.
Basic Management Accounting Concepts Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson.
Job-Order Costing for Manufacturing & Service Companies
22.1PPS t/a Carnegie et al; Accounting: Financial and Organisational Decision Making © 1999 McGraw-Hill Book Co. Aust. ACCOUNTING Financial and Organisational.
Factory Overhead Planned, Applied & Actual
Budgetary Planning and Control
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
Fixed Overhead Variance Spoilage, Rework and Scrap
C H A P T E R 5 Operational Budgets. Learning Objective 1 Describe the importance of personal budgeting.
Product and Service Costing: Job-Order System
Cost Management ACCOUNTING AND CONTROL
Chapter Two Manufacturing Costs and Job-Order Costing Systems.
Cost Concepts and Behavior
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
4-1 Product and Service Costing: Overhead Application and Job-Order System Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine.
C 8 hapter Inventory Valuation Approaches and Just-in-Time Inventory Management Prepared by Douglas Cloud Pepperdine University
CHAPTER NINE Absorption Cost Systems. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 9-2 Outline of Chapter 9 Absorption.
Profit Planning Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson Learning. All rights.
CHAPTER 13 COST ACCOUNTING AND REPORTING SYSTEMS McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Job-Order Costing Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson Learning. All rights.
1 3 Standard Costing, Variable Costing, and Throughput Costing
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
Product Costing in Service and Manufacturing Entities Chapter 11.
6-1 Product Costing and the Manufacturing Environment C hapter 6 Prepared by Douglas Cloud Pepperdine University.
Chapter 22. Prepare a flexible budget for the income statement.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
Cost & Management Accounting
Chapter 22 Master Budgets
Financial & Managerial Accounting 2002e
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Cost Accounting and Reporting Systems
Overhead and Marketing Variances
Budgeting for Planning and Control
AMIS 3300 Chapter 9.
Presentation transcript:

12-1 Introduction to Product Costing Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 12

12-2  Describe the flow of costs for manufacturers and service providers.  Describe three types of manufacturing processing and their related costing requirements.  Describe and illustrate job-order costing.  Determine product costs using actual and normal costing systems. ObjectivesObjectives After reading this chapter, you should be able to: ContinuedContinued

12-3  Analyze misapplied overhead into budget and volume variances.  Develop ABC overhead rates and apply them to job-order costing companies.  Discuss the role of overhead application in pursuing strategies. ObjectivesObjectives

12-4 Absorption Costing Sometimes called full costing Includes fixed overhead costs in per-unit inventory calculations Must use for financial reporting and income tax purposes Can give misleading results for short-term decisions

12-5 Product versus Period Costs Product costs are manufacturing costs that are expensed (cost of goods sold) when the product is sold.

12-6 Period costs are the selling and administrative costs which are expensed in the period incurred. Product versus Period Costs

12-7 Three Types of Inventory in a Manufacturing Firm Materials and purchased parts/components—consisting of the various materials and components that go into a finished product, but have not been put into production.

12-8 Three Types of Inventory in a Manufacturing Firm Work in process inventory, consisting of semifinished units, that is, product on which some, but not all, work has been done.

12-9 Three Types of Inventory in a Manufacturing Firm Finished goods inventory, consisting of units ready for sale. This inventory is equivalent to a merchandiser’s inventory.

12-10 Flow of Costs in a Manufacturer Materials Inventory Purchase materials Direct Labor Pay direct laborers Manufacturing Overhead Incur overhead costs Cost Collected Action Initially Cost Flow To and Through Work in Process Inventory Finished Goods Inventory Cost of Goods Sold

12-11 Cost per Unit of Product Cost per unit of product Total production costs Total units processed = Example: 10,000 units were produced at a total production cost of $150,000.

12-12 Job-Order Costing Job-order costing keeps track of the cost of materials and labor used on each job and then applies, absorbs, or assigns some amount of manufacturing overhead to each job.

12-13 Under actual costing, the overhead incurred during a period is applied to all jobs that were in process during the period. To assign all of the overhead costs to jobs, we calculate the overhead rate by dividing total actual overhead by the total amount of the relevant input factor. Actual Costing

12-14 Overhead rate = Total manufacturing overhead Total manufacturing activity Overhead rate = $105,000 10,500 Overhead rate = $10 per machine hour Actual Costing

12-15 Overhead$30,000$50,000$25,000 Direct materials20,00015,00010,000 Direct labor 10,000 20,000 15,000 Total cost of job$60,000$85,000$50,000 Job Number J-1 J-2 J-3 Actual Costing

12-16 May December Total overhead costs: $50,000 + (10,000 x $4)$90,000 $55,000 + (5,000 x $4)$75,000 Machine hours10,0005,000 Overhead rate per machine hour$9$15 ZyCo Actual Costing

12-17 Actual Costing ZyCo ZyCo does two similar jobs in May and December, each requiring 100 machine hours, $500 in direct labor, and $300 in materials. Actual costs are-- May December Materials$ 300$ 300 Direct labor Overhead, 100 hours at $9 and $ ,500 Totals$1,700$2,300

12-18 Normal Costing Predetermined overhead rate Budgeted manufacturing overhead for year Budgeted production activity for year Overhead rate = $1,080, ,000 Overhead rate = $9 per machine hour =

12-19 Normal Costing Budget allowance Fixed costs = + Variable cost per unit of activity x Amount of activity Predetermined overhead rate = $600,000 + $4 x 120, ,000 = $9

12-20 Normal Costing Overhead$27,000$45,000$22,500 Direct materials20,00015,00010,000 Direct labor 10,000 20,000 15,000 Total cost of job$57,000$80,000$47,500 Job Number J-1 J-2 J-3

12-21 Normal Costing Overhead assigned to job = Actual hours worked on job Total actual overhead Total actual hours x Under actual costing Overhead assigned to job = Actual hours worked on job Total budgeted overhead Total budgeted hours x Under normal costing

12-22 Misapplied Overhead Job J-1$ 30,000$27,000 Job J-250,00045,000 Job J-3 25,000 22,500 Total$105,000$94,500 Overhead Applied to Jobs Using Actual Costing Normal Costing

12-23 Overhead Variances The budget formula for annual overhead cost is $600,000 fixed costs ($50,000 per month) plus $4 per machine hour variable. July’s flexible budget based on 10,500 hours is as follows: ZyCo’s July Results Actual costs, fixed and variable$105,000 Budgeted costs [$50,000 + ($4 x 10,500 hours) 92,000 Budget variance, unfavorable$ 13,000

12-24 Overhead Variances ZyCo’s July Results ZyCo planned 120,000 machine hours for the year (monthly average, 10,000 hours). ZyCo worked 10,500 hours of machine time in July. Budgeted overhead (from Slide 12-23)$92,000 Applied overhead ($9 x 10,500 hours) 94,500 Volume variance, favorable$ 2,500

12-25 Overhead Variances ZyCo’s July Results Variable Portion Fixed Portion Budgeted cost (10,500 x $4)$42,000$50,000 Applied cost: 10,500 x $442,000 10,500 x $5 52,500 Volume variance (500 hours x $5)----$ 2,500

12-26 Overhead Variances Volume variance = Total budgeted manufacturing overhead – Total applied manufacturing overhead Volume variance = Total budgeted fixed manufacturing overhead – Total applied fixed manufacturing overhead Volume variance = Predetermined overhead rate for fixed costs x Budgeted production activity Actual production activity –

,000 U Budget variance Volume variance $2,500 F $10,500 U Total underapplied overhead Actual Overhead Budgeted Overhead Applied Overhead $105,000 $92,000 $94,500 $50,000 + ($4 x 10,500) $9 x 10,500 Overhead Variances

12-28 Income Statements, Actual and Normal Costing Sales$110,000$110,000 Normal cost of sales$57,000 Plus underapplied overhead 10,500 Cost of sales 67,500 60,000 Gross profit$ 42,500$ 50,000 Selling and administrative 30,000 30,000 Profit$ 12,500$ 20,000 Normal Costing Actual Costing ZyCo Income Statements for July

12-29 Activity-Based Overhead Rates Cool pools might consist of costs of departments or costs related to such activities as material use, number of setups, cycle time, or engineering changes.

12-30 Income Statements, Actual and Normal Costing Sales$110,000 Normal cost of sales 57,000 Normal gross profit$ 53,000 Variances: Unfavorable budget variance$13,000 Favorable volume variance 2,500 10,500 Gross profit$ 42,500 Selling and administrative expenses 30,000 Profit$ 12,500 ZyCo Normal Costing Income Statements for July

12-31 Activity-Based Costing Example Direct LaborSetups Total Budgeted overhead costs$800,000$400,000$1,200,000 Budgeted direct labor hours100,000 Budgeted number of setups2,000 Rates $8.00$ per dlhper setup If only direct labor hours are used to allocate overhead, the rate is $12. Tricomm Company

12-32 Calculated Price for Two Jobs Using One Rate Job AJob B Direct labor hours Materials hours$10,000$10,000 Direct labor cost ($10) 8,0002,000 OH applied ($12) 9,600 2,400 Total cost$27,600$14,400 x 1.5 x 1.5 Price$41,400$21,600 Tricomm Company

12-33 Calculated Price for Two Jobs Using Activity-Based Rates Job AJob B Direct labor hours Materials hours$10,000$10,000 Direct labor cost ($10) 8,0002,000 Overhead: Labor-related ($8)6,4001,600 Setup-related ($200) 400 5,000 Total cost$24,800$18,600 x 1.5 x 1.5 Price$37,200$27,900

12-34 The End Chapter 12

12-35