Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.

Slides:



Advertisements
Similar presentations
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Advertisements

P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
Report from the Lecce’s Offline Group Rome 6-Feb-2006 The Achievements The People Future Plans.
Xenon Detector Xenon Detector Group. 1 Contents Cryostat Construction Detector Preparation Schedule.
Xenon Detector Status Liquid Xenon Detector Group.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
Liquid Xenon Photon Detector Feb MEG Review Meeting Liquid Xenon Detector Part I CEX beam test at piE1 Oct-Dec/03 –Hardware operation status –Analysis.
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
Peter-Raymond Kettle MEG Review February MEG Commissioning & Engineering Run 2007.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Status of the COBRA Magnet Wataru OOTANI MEG review meeting Feb. 3, 2003 PSI Switzerland.
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
PSI - February 3, 20031F. Sergiampietri MEG – PMT cryogenic test: PURPOSES -SYSTEMATIC TEST OF THE PMT’s FOR MEG IN OPERATING CONDITIONS -BUILD AN EVOLUTIVE.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
The MEG Experiment T. Mori for the MEG Collaboration.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Overview of the experiment Collaboration (about 30 physicists at this meeting) Budget Realistic schedule and general status (few words) of each sub-detector.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Xenon Detector Installation schedule Satoshi MIHARA.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Preparations for Run 6 Don Lynch February 13, 2006.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
9 Feb, MEG Software Status -for the coming review committee- Question from A.Blondel Our answer Schedule and Man power MEG Software Group.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, MEG Collaboration meeting Feb. 10th, 2004.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
g beam test of the Liquid Xe calorimeter for the MEG experiment
Installation of the T600 at Fermilab
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Technical Design for the Mu3e Detector
ATLAS M&O General Comments
Liquid Xenon Detector for the MEG Experiment
CMS Goal of the experiment
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
Preparation of the CLAS12 First Experiment Status and Time-Line
Status of the experiment in Italy
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
New Results from the MEG Experiment
Presentation transcript:

Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation

PSI Budget ’03 – ’05 kCHF Granted Left R & D annual basis Xenon DC Beamline ) Electronics Infrastructure ) OK ~OK OK 1) External design, BTS power supply 2) He transfer lines

Running costs estimate kCHF / year Beam Electr. Power: 240 LN2 / LH2 Central computing Chamber gas: 5 Data storage: 38 *) (tapes) Repairs, extensions… PSI General Budget Laboratory Budget ~100 *) 200 GB LTO tape for 75 CHF

Manpower summary [FTE incl. students and some engineers] Item Cobra 11 Beamline + Target Drift Chamber Timing Counter Photon Detector Trigger DAQ MC Offline Calibration & Mon. 444 

COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device Final field mapping during shutdown DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device Final field mapping during shutdown

Beam Test Milestone AssemblyDesignManufactoring Solenoid BTS Triplet I + II Target Part 1 New Separator Beam Line Commissioning Sep+BTS+COBRACOBRA+Target GottaPrak. Pi beam Solenoid BTS Triplet I + II Target Part 1 New Separator GottaPrak. Pi beam Gotta

Test Milestone AssemblyDesignManufacturing Drift Chamber outsideinside Full Prototype Foil Full Detector (18 DC) Full Size Prototype outside inside Full Prototype Foil Full Detector (18 DC) Full Size Prototype

COBRA Test Timing Counter Test Milestone AssemblyDesignManufactoring Beam Test Design PMT EvaluationPMT procur. Procur & Manuf. APD EvaluationTestAPD procur. Mechanical matching BG test Full installation APD procur. New APDs Frascati COBRA TestBeam Test Design PMT EvaluationPMT procur. Procur & Manuf. APD EvaluationTestAPD procur. Mechanical matching BG test Full installation APD procur. Frascati

Photon Detector

Test Milestone AssemblyDesignManufacturing Large PrototypeBeam Test Cryostat Vessel PMT Refrigerator Liq. Purification Assembly Test Engineering runs Neutron Measurements Large PrototypBeam Test Cryostat Vessel PMT Refrigerator Liq. Purification Assembly Test Engineering runs Neutron Shield Tests

Test Milestone AssemblyDesignManufactoring Trigger Prototype Board Final Prototype partial installation full install. Full system 1st lot of components ordered 2nd lot of components 2006 Prototype Board Final Prototype partial installation Full system

DRS (DAQ) Test Milestone AssemblyDesignManufactoring DRS2 DRS2 test board DRS3 VME boards Full System DRS2 production 1600 chn 2006 DRS2 DRS2 test board DRS3 VME boards 4000 chn Full System DRS2 production 4000 chn Replacement

Test Milestone AssemblyDesignManufactoring Offline Framework Prototype Minifarm Computing Model Data Challenge Farm Framework Prototype ½ Minifarm Computing Model LPT Analysis Reconstr. Module

2004 JFMAMJJASOND Beam Time MEG Prac MEGGotta COBRA Calibration (Wed) Beam Line Commiss. Part 1 Platf. Drift Chamber Proto type Timing Counter Test Mechan. Matching LPT Neutr. BG PM + Src Inst Pi- Beam Test Liq. Purif. Full Calorimeter Trigger DAQ Test

2005 JFMAMJJASOND Beam Time ShutdownMEGGottaMEG COBRA Tests Platf. Beam Line BTS Tests Comm. Drift Chamber Proto Inst Test? Timing Counter Test? LPT PMT Test and Calibration Full Calorimeter Cryogenics Installation Trigger DAQ DC Electr. TC Tst

2006 JFMAMJJASOND Beam Time Shutdown ?MEG COBRA Field Map Beam Line Comm. Drift Chamber Full Installation Timing Counter Full Installation LPT Full Calorimeter Installation Trigger Inst DAQ Inst