ACES Mar 2007Geoff Hall1 System level requirements for upgraded tracker.

Slides:



Advertisements
Similar presentations
The ATLAS Pixel Detector
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
09 September 2010 Erik Huemer (HEPHY Vienna) Upgrade of the CMS Tracker for High Luminosity Operation OEPG Jahrestagung 2010.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Developments on power transfer at CERN (DC-DC converters) Philippe Farthouat CERN.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
LHCb VErtex LOcator & Displaced Vertex Trigger
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
ATLAS FP TRACKER PLANS Steve Watts School of Physics and Astronomy University of Manchester Well defined design in the FP420 Design Report Based on the.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
Summary of Opening Session Emmanuel Tsesmelis / CERN CARE-HHH-APD Workshop Arcidosso 2 September 2005.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Trends and synergies in solid state tracking R&D Executive Summary of the session Frank Hartmann.
SCIPP Santa Cruz Institute for Particle Physics
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Leonardo Rossi INFN Genova - UTOPIA #12 0 What we have learned from UTOPIA so far? Defined a set of gauge histos to compare layouts Exercised on barrel-part.
09 September 2010 Erik Huemer (HEPHY Vienna) Upgrade of the CMS Tracker for High Luminosity Operation OEPG Jahrestagung 2010.
ATLAS LAr Forward Calorimeters C. Zeitnitz (Universität Wuppertal) for the ATLAS LAr Community.
SUMMARY AND DISCUSSION SAVERIO D’AURIA. SUMMARY Expertise from various experiments and from people with different background We tried to factorize what.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Simulation Plan Discussion What are the priorities? – Higgs Factory? – 3-6 TeV energy frontier machine? What detector variants? – Basic detector would.
Ideas on MAPS design for ATLAS ITk. HV-MAPS challenges Fast signal Good signal over noise ratio (S/N). Radiation tolerance (various fluences) Resolution.
Straw man layout for ATLAS ID for SLHC
Detector building Notes of our discussion
Tracking detectors/2 F.Riggi.
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Hybrid Pixel R&D and Interconnect Technologies
Upgrade Tracker Simulation Studies
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Status report of the ATLAS SCT optical links
Compilation of Dis-/Advantages of DC-DC Conversion Schemes
Motives and design of future CMS tracker
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

ACES Mar 2007Geoff Hall1 System level requirements for upgraded tracker

ACES Mar 2007Geoff Hall2 Potential upgrades to CMS CMS was designed for 10 years operation at L = cm -2.s -1 ~20 events per beam 40MHz To operate at L = cm -2.s -1 ~400 events/10,000 particles per beam 20MHz Rebuild tracking system - requirements and challenges Greater radiation tolerance Higher granularity - more pixels, and shorter strips New electronic readout system Take further advantage of DSM CMOS & higher speed optical links Contain power budget and unit costs Increase mass production and automation Improve cooling performance Reduce unnecessary mass

ACES Mar 2007Geoff Hall3 Requirements and challenges Physics requirements Not yet better defined than LHC and may be influenced by discoveries Momentum measurement & spatial resolution precision, tracking efficiency not expected to reduce Electron and muon track reconstruction will still be important More energetic jets with more particles and higher track density Rarer channels likely to be studied Worse performance than LHC is not allowed, despite nature’s challenge! Higher granularity & less material will evidently help Operational lifetime Not yet well defined and will depend on machine performance, budgetary constraints, difficulties of operating experiment in very new conditions - but may be longer than originally expected Even if not true, inaccessibility for maintenance requires… High reliability and quality of manufacture are essential

ACES Mar 2007Geoff Hall4 New electronic readout system Potential targets for beneficial features Power reduction per channel if possible better than scaled with input load Increased testability, redundancy Improved immunity to any radiation effects, especially SEU Maintain data quality, under more challenging conditions increased digital activity, lower noise targets for thin sensors,.. Qualification has been successful but it’s always possible to improve Much relies on users and small features always show up late Design for low power everywhere possible Don’t wait to be asked! Some elegance in system design may need to be sacrificed…

ACES Mar 2007Geoff Hall5 Requirements from sensor issues CMS Silicon microstrip tracker ~210 m 2 of silicon, 10M channels, FE chips, optical links Present silicon sensors - main parameters Substrate:, n-type float-zone, phosphorus doped p-side readout, AC coupled, with poly-Si bias resistors For LHC only one type of - well understood - sensor material and readout polarity For SLHC not yet known if single material or sensor type will be used Large scale manufacture requires substantial, experienced companies Less mature technology feasible for limited innermost region? Front end electronic design can’t - as usual - be decoupled from sensors May need multiple FE chip variants (for a time..?) Sensor specifications are a required input to electronic definition

ACES Mar 2007Geoff Hall6 Greater radiation tolerance Electronics Little doubt that advanced CMOS (0.13µm,…) will meet our requirements What are the arguments for considering other processes? Total dose qualification is time consuming 10 Mrad with x-ray machine ~1 day Rate effects are difficult to study Effort in design required to mitigate Single Event effects Access to suitable sources required (heavy ions - vacuum, ~50MeV protons, …) Expect issues at module level or with components Handling issues, special tooling, time, etc..

ACES Mar 2007Geoff Hall7 Power budget & provision Space & cooling in control room & cavern is also limited Increase in volume of off-detector electronics should be compensated by density total power constraints will also not relax much Effort on power provision is mandatory before commitments are final Tracker (& CMS) performance is adversely affected by material Space for services is limited Routes are complicated Reduction in currents would help Increasing power budget will not make life easier

ACES Mar 2007Geoff Hall8 Costs 0.13µm CMOS ASIC prototyping of full size chips is significantly more expensive Access is also possible via commercial MPW Convenient & affordable for small chips MPW sharing of single technology has advantages Foundry access, shared experience, circuits/components,… But drawbacks of less predictable schedules Production costs almost unchanged => lower in future real terms Potential cost conflict between trying new ideas and containing number of iterations of large chips However, optical link procurement was the major CMS cost driver ATLAS & CMS approaches were different last time In-house/commercial large number of links (analogue)/small number (binary) Clarification of link options and implications of common project

ACES Mar 2007Geoff Hall9 Mass production and automation CMS pioneered automated module assembly Eventually very successful in ~2 years But Significant development time Main hold-ups due to subtle component issues Many crucial, detailed, labour intensive tasks Testing and tooling requires development  Ease of task depends on number of variants  System assembly, installation and commissioning much less adaptable to automation  Desirable to reduce number of module types

ACES Mar 2007Geoff Hall10 Cooling performance Increased cooling could be required for Lower temperature operation for radiation mitigation/thermal runaway Removing increased heat load Mainly driven by sensors, and perhaps system requirements If either of these is required, more cooling power is necessary But cooling is a significant contributor to material budget So either reduce heat load, or improve engineering of cooling system Appraisal of required cooling and its impact Desirable to compare performance of ATLAS (evaporative) vs CMS (conventional liquid) cooling schemes

ACES Mar 2007Geoff Hall11 Reduce unnecessary mass No non-essential material in tracker but perhaps we could still do better in future

ACES Mar 2007Geoff Hall12 Installation issues May require to replace inner layers during lifetime Never too soon to think about power provision Ability to work in irradiated zone not yet clarified Specialist tools and techniques to be developed

ACES Mar 2007Geoff Hall13 New challenges  Leave this for other speakers, as unique to CMS (I think)  Tracker input to L1 trigger Muon L1 Trigger rate at L = cm -2.s -1 Note limited rejection power (slope) without tracker information But (for CMS) tracking trigger should not degrade tracking performance…

ACES Mar 2007Geoff Hall14 Conclusions General requirements are clear. More details require iteration Higher granularity & less material will evidently help High reliability and quality of manufacture are essential Qualification has been successful but it’s always possible to improve Design for low power everywhere possible Sensor specifications are a required input to electronic definition Effort in design required to mitigate Single Event effects Effort on power provision is mandatory before commitments are final Potential cost conflict between trying new ideas and containing number of iterations of large chips Clarification of link options and implications of common project Appraisal of required cooling and its impact