© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015.

Slides:



Advertisements
Similar presentations
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
The State Route 246 Central Avenue Ext. and Purisima Road Traffic Study May 2008.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
Traffic & Congestion In Connecticut State of Connecticut Department of Transportation April 2010.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
4-1 Model Input Dollar Value  Dollar value of time  Accident costs  Fuel costs  Emission costs.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
Connector Ahead Capital SouthEast Connector Project Sheldon/Wilton Community Workshop #3
Traffic Flow Parameters Surface Street Application.
STA Safety Project PID #76439 December 12, 2006.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
RECONSTRUCTION OF County Route 1, Golden Shores Pkwy & Oatman Highway Public Information Meeting Golden Shores Senior Center Tuesday, June 3, 2015.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 5 August 26, 2015.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, January 21, 2016.
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Planning and Environmental Linkages MPO/COG Conference February 24, 2016.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Council Presentation January 2014 Lauzon Parkway Improvements Class Environmental Assessment Study County of Essex.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
The I-465 West Leg Reconstruction Project
Downtown Valdosta Truck Traffic Mitigation Study
Project Management Team Meeting #3
TVTC Impact Fee Update Nexus Study January 30, 2008
General Tab Project, Cost Schedule, and Work Limits Roadway Character
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
FM 518 By-pass Traffic Review
Ventura County Traffic Model (VCTM) VCTC Update
Downtown Valdosta Truck Traffic Mitigation Study
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.
I-85 Corridor Light Rail Transit Feasibility Study
Utility Relocation: 11th/Mill
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015

 Welcome and Introduction  Bypass Short List Screening o Physical Description of Bypasses o Traffic Forecasts o Environmental Considerations o Benefit-Cost Analysis  Route 11 Improvements Workshop o Full Length Widening o Spot Improvements  Next Steps Agenda

ROUTE 11 BYPASS SHORTLIST

Route 11 Bypass Alternatives

Operational and Design Features Alternatives Screening Criteria US 11 Baseline Bypass Alternatives CantonPotsdamFull 2 Lanes 4 Lanes 2 Lanes 4 Lanes 2 Lanes 4 Lanes Length (miles) Design Speed (mph)varies Number of Interchanges Number of Bridges Capital Cost (millions) $75$113$64$96$179$272 O&M Cost (thousands)$1,022$620$931$531$797$1,531$2,323

BYPASS SHORTLIST SCREENING : TRAFFIC FORECASTS

Preliminary Do Nothing Alternative Average Daily Traffic Volume Potsdam Gouverneur Canton Ogdensburg US11 NY11B NY56 NY345 CR35 CR66 NY310 NY68 CR25 NY58/812 NY56 CR14 US11 NY72 US11 NY68 CR6 NY37 CR10 NY812 NY58 CR24 NY310 CR14 CR27

Preliminary Canton Bypass (4-lane) Average Daily Traffic Diversion Potsdam Gouverneur Canton Ogdensburg US11 NY11B NY56 NY345 CR35 CR66 NY310 NY68 CR25 NY58/812 NY56 CR14 US11 NY72 US11 NY68 CR6 NY37 CR10 NY812 NY58 CR24 NY310 CR14 CR27

Preliminary Potsdam Bypass (4-lane) Average Daily Traffic Diversion Potsdam Gouverneur Canton Ogdensburg US11 NY11B NY56 NY345 CR35 CR66 NY310 NY68 CR25 NY58/812 NY56 CR14 US11 NY72 US11 NY68 CR6 NY37 CR10 NY812 NY58 CR24 NY310 CR14 CR27

Preliminary Full Bypass (4-lane) Average Daily Traffic Diversion Potsdam Gouverneur Canton Ogdensburg US11 NY11B NY56 NY345 CR35 CR66 NY310 NY68 CR25 NY58/812 NY56 CR14 US11 NY72 US11 NY68 CR6 NY37 CR10 NY812 NY58 CR24 NY310 CR14 CR27

Preliminary Traffic Volumes Alternatives Screening Criteria US 11 Baseline Bypass Alternatives CantonPotsdamFull 2 lanes 4 lanes 2 lanes 4 lanes 2 lanes 4 lanes Average AM Peak Hour volumes* on US 11 (veh) Average PM Peak Hour volumes* on US 11 (veh) Average AM Peak Hour volumes* on Bypass (veh) Average PM Peak Hour volumes* on Bypass (veh) * Reported volumes are the average volume in either direction

Preliminary Traffic Speeds Alternatives Screening Criteria US 11 Baseline Bypass Alternatives CantonPotsdamFull 2 lanes 4 lanes 2 lanes 4 lanes 2 lanes 4 lanes AM Peak Hour US 11 Within Potsdam29 30 AM Peak Hour US 11 Canton - Potsdam AM Peak Hour US 11 Within Canton AM Peak Hour Bypass PM Peak Hour US 11 Within Potsdam PM Peak Hour US 11 Canton - Potsdam PM Peak Hour US 11 Within Canton PM Peak Hour Bypass

Preliminary Vehicle Miles of Travel and Vehicle Hours of Travel Alternatives Screening Criteria US 11 Baseline Bypass Alternatives CantonPotsdamFull 2 lanes 4 lanes 2 lanes 4 lanes 2 lanes 4 lanes Daily Auto Traffic on US 11 (VMT 000s) Daily Auto Traffic on Bypass (VMT 000s) Daily Truck Traffic on US 11 (VMT 000s) Daily Truck Traffic on Bypass (VMT 000s) Daily Vehicle Miles of Travel in St. Lawrence County (000s) 3,2583,2603,2613,258 3,2613,265 Daily Vehicle Hours of Travel in St. Lawrence County (000s) 6968

BYPASS SHORTLIST SCREENING : ENVIRONMENTAL CONSIDERATIONS

Land Use

Parks

Agricultural District

Wetlands

Environmental Justice Areas

Environmental and Socioeconomic Considerations Alternatives Screening Criteria US 11 Baseline Bypass Alternatives CantonPotsdamFull 2 lanes4 lanes2 lanes4 lanes2 lanes4 lanes Wetlands Use of wetlands Affected Acreage Mitigation Cost (millions)$1.79$3.09$0.67$1.16$3.82$6.58 Agriculture Affected land within designated Agricultural District (acres) Land Use Local Land Use PlansWould not advance, but also not conflict with, local land use plans Socioeconomic Conditions Environmental JusticePotential for moderate environmental impacts in EJ areas Displacement of Residential UnitsNo dispalcement of residential units Displacement Business EstablishmentsNo displacement or disruption of businesses Noise Increased Noise Levels At Sensitive Locations within 200 feet of Existing ROW No increase in traffic volume near village centers Parks Potential Adverse Effect on Parks: Increased proximity of roadway alignment to parkland Increased proximityNo effectIncreased proximity

BYPASS SHORTLIST SCREENING : BENEFIT-COST ANALYSIS

Preliminary Benefit-Cost Ratios Alternatives Screening Criteria Bypass Alternatives CantonPotsdamFull 2 lanes4 lanes2 lanes4 lanes2 lanes4 lanes 7% Discount Rate (USDOT base rate for Tiger grants) Present Value Benefits ($M)$41.9$61.8$49.3$79.5$104.5$197.5 Present Value Costs ($M)$67.2$101.0$57.4$86.2$160.8$244.1 Net Present Value ($M)($25.3)($39.2)($8.1)($6.6)($56.3)($46.6) Benefit-Cost Ratio % Discount Rate (USDOT sensitivity rate for Tiger grants) Present Value Benefits ($M)$139.9$206.3$166.1$266.9$352.0$664.9 Present Value Costs ($M)$87.4$131.3$74.6$112.0$209.6$318.1 Net Present Value ($M)$52.5$75.0$91.5$154.9$142.4$346.8 Benefit-Cost Ratio

US ROUTE 11 IMPROVEMENTS CANTON-POTSDAM

Spot Improvements – Maintain Two Lanes for Route 11  Left Turn Lanes at Cowan Road  Windy Hill Climbing Lane  Left Turn Lanes at Dayton Road  Morley Potsdam Road Realignment  Improvements to the Intersections with County Road 35 o Left Turn Lanes o Offset Roundabouts

Widening – Widen Route 11 to 4 lanes  Left Turn Lanes at Cowan Road  Windy Hill Climbing Lane  Left Turn Lanes at Dayton Road  Morley Potsdam Road Realignment  Improvements to the Intersections with County Road 35

ROUTE 11 CORRIDOR IMPROVEMENTS WORKSHOP

NEXT STEPS  SAC Meeting No. 9  Public Meeting  Selection of preferred alternatives  Final Report

Open Discussion

© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.