CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

Status of CMS CSC upgrade in LS1 Present CSC Status ME 4/2 project ME 1/1 project 5/20/2015 Petr Levchenko NEC 2013, Varna 1.
Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Martin von der Mey, EMU at CMU, October ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production.
Endcap Muon meeting: FNAL, Oct , 2004 J. Hauser UCLA 1 TMB and RAT Status Report Jay Hauser University of California Los Angeles.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
C-Card and MMFE using the BNL Peak Finding ASIC (VMM1) Ken Johns, Joel Steinberg, Jason Veatch, Venkat Kaushik (U. Arizona)
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Status of the CSC Track-Finder Darin Acosta University of Florida.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
CSC Hardware Upgrade Status
University of Wisconsin
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
University of California Los Angeles
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
CSC Trigger Muon Port Card & Sector Processor in production
University of California Los Angeles
University of California Los Angeles
TMB and RAT Status Report
Effect of an ALCT SEU Much-overlooked good stuff
University of California Los Angeles
Plans for the 2004 CSC Beam Test
Presentation transcript:

CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.

CSC Ops/DPG meeting, 05-Oct-2011 Hauser2 ME4/2 electronics boards on-chamber Peripheral Crates FED Crates Need for ME4/2 Already have

CSC Ops/DPG meeting, 05-Oct-2011 Hauser3 CSC system layout CSC CFEB ALCT 1 of 24 CFEB 1 of 2 LVDB LV Distribution Board FED Crate in USC55 1 of 5 Anode Front-end Board Cathode Front-end Board Anode LCT Board MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB CONTROLLERCONTROLLER Peripheral Crate on iron disk Slow Control Trigger-Timing-Control Muon Sector Receiver Lev-1 Trigger Trig Motherboard DAQ Motherboard Clock Control Board DDU Board Readout Data

CSC Ops/DPG meeting, 05-Oct-2011 Hauser4 ALCTs for ME4/2 - general plan One 384-channel board per chamber, so 80 needed Build new boards (Now have 29 spares, ~15 working) Tailwind: funding that expires Dec. 31, 2011(!) 3-month extension “likely”, but not guaranteed

CSC Ops/DPG meeting, 05-Oct-2011 Hauser5 ALCT384 board design Analog section: test pulse generator, AFEB power, ADCs, DACs (other side) Input signal connectors Delay/ buffer ASICs, 2:1 bus multiplexors (other side) 80 MHz SCSI outputs (to Trigger Motherboard (to Trigger Motherboard) Power, computer connectors Spartan XL Mezzanine card Trigger, DAQ logic Base board

CSC Ops/DPG meeting, 05-Oct-2011 Hauser6 New base boards Have original design files Schematic design Layout for board fabrication and assembly Plan to keep the same design Clock distribution is non-optimal, but acceptable Existing board works reliably

CSC Ops/DPG meeting, 05-Oct-2011 Hauser7 Base board progress Parts: All electronics and mechanical parts have been ordered, expect to receive all by mid-October Was non-trivial (some not in production, lead-free substitutions…) Delay ASICs will have to use “bin 4” ns, versus existing ALCT384 “bin 7 and 8” ns Timing changes by about 1-7ns (as delay code 0,1,2,..,15) Can adjust resistor values to reduce the difference Board fabrication By original vendor (Cirtech) All boards have been ordered, due Oct. 4-11

CSC Ops/DPG meeting, 05-Oct-2011 Hauser8 New ALCT384 mezzanine board Original design files in hand FPGA choices: Original Virtex-E (ca. 2001) Spartan-6

CSC Ops/DPG meeting, 05-Oct-2011 Hauser9 Spartan-6 comparison to Virtex-E XC6SLX150/fg900 package vs. XCV600E/fg680 Both 3.3v I/O, sufficient # pins (576 vs. 516) Price $230 vs. $735 Performance/capability: 92K vs. 9.6K look-up tables Speed x, maybe Power only ~0.2W quiescent, W active  Configuration from EPROM takes 212ms vs. 25ms vs. present 101ms for TMB, new ME1/1 TMBs 385 ms (8-bit)  Needs separate firmware files  Core voltage needs on-board conversion 1.8  1.2v Also need +2.5v for VCCaux

CSC Ops/DPG meeting, 05-Oct-2011 Hauser10 Performance of Spartan-6 10x logic capacity, ~2x speed Improvements needing study: More patterns point better to IP reduce n’s, halo, albedo etc. at trigger primitive level More patterns give better eta precision for CSC-TF Better trigger timing through use of trailing edges Could use in TMB ghost suppression Generally: high-luminosity “insurance”

CSC Ops/DPG meeting, 05-Oct-2011 Hauser11 Opportunity with Spartan-6 Cost per board ~$500 versus ~$1000 Virtex-E  Could build for ME4/2 and for ME1/1 Cost is $80K for ME4/2 for Virtex-E Cost is $80K for ME4/2 and ME1/1 for Spartan-6 Expected technical challenges greatest for ME1/1 (high rate) NB make ME1/1 replacement only in 2013 Concern: a new chip, what about SEU rate? Tests on Spartan-6 and Virtex-6 by Los Alamos, Xilinx engineers “Per-bit” error rate /100 About 10x more bits  0.1 the rate/chip as for Virtex-E

CSC Ops/DPG meeting, 05-Oct-2011 Hauser12 Spartan-6 mezzanine progress Firmware already ported, no issues Design: Fully compatible design Uses rad-hard regulators for 2.5v, 1.8v, 1.2v Added an ADC to read these voltages, also 3.3v (main) First pass schematics done Layout: First pass done

CSC Ops/DPG meeting, 05-Oct-2011 Hauser13 Near-term plans Finish Spartan-6 design and layout Expect by mid-Oct. Assemble ~5 pre-production boards Need to “requalify” assembly company Ask for quick turnaround Base boards ~mid-Nov? Spartan-6 boards ~early-Dec? Bring up the ALCT test setup in UCLA Last used ~2 years ago (by Farrell and u.g.’s) Move to full production after the pre- production cycle

CSC Ops/DPG meeting, 05-Oct-2011 Hauser14 Backup

CSC Ops/DPG meeting, 05-Oct-2011 Hauser15 CSC Muon Trigger Scheme

CSC Ops/DPG meeting, 05-Oct-2011 Hauser16 ALCT Testing Board

CSC Ops/DPG meeting, 05-Oct-2011 Hauser17 ALCT Production Testing Using 3 stationsUsing 3 stations 2 for testing2 for testing 1 for fixing1 for fixing Crew of 4 students testingCrew of 4 students testing 2 students helping Valeri Iatsura with fixing.2 students helping Valeri Iatsura with fixing. (from 2002)

CSC Ops/DPG meeting, 05-Oct-2011 Hauser18 ALCT Test Procedures Six main tests: 1.Slow control test suite (done for all versions) various DAC, ADC, current, voltage, temperature tests 2.Internal pattern test (test firmware done for –384 and -672) Set trigger data in delay ASIC, then clock to FPGA at full speed, check trigger decision 3.TMB and AFEB pulse tests (done for –384 and -672) check SCSI I/O at full speed using test board and check test pulsing with oscilloscope. 4.Single cable input test (done for –384 and -672) clock data out SCSI and then into AFEB input at full speed using special cable. 5.Semi-automatic delay ASIC test (done for –384, flaky for others) loop over various delay values and check progression of signal at delay ASIC outputs using oscilloscope 6.(6/2002 listed as “desirable”) Fully-automatic delay ASIC test load data into Test Board FIFOs, then run into FPGA using various delay ASIC settings, analyze data to derive timing. (from 2002)