1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.

Slides:



Advertisements
Similar presentations
Houston Region Import Capacity Project Planning for Reliable Power.
Advertisements

Key Performance Indicators for the Junior Resource Sector: Q Update Prepared by Mike Doggett August 27, 2014.
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
1 Frank & Bernanke 4 th edition, 2009 Ch. 10: Short-Term Economic Fluctuations.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
1 Introduction to Macroeconomics Chapter 20 © 2006 Thomson/South-Western.
NERC LTRA Update / CDR Capacity Counting Issues
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Voltage Collapse Animation (AC) Created by Peter W. Sauer Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
1 American Electric Power Company Transmission Formula Rate AEP Appalachian Transmission Co., Inc. AEP Indiana Michigan Transmission Co., Inc. AEP Kentucky.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
FINANCIAL UPDATE May 16, Financial Update will Cover Four Main Topics 1.Review of local economic indicators 2.Review of financial results for year.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
RTWG Report to TAC August 5, 2010 Howard Daniels.
VisTaTech Center Schoolcraft College September 14, 2006 Partners in Business Meeting 2007 Attachment O.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Generator Interconnection Status Update Tom Lanigan Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
September 24, 2007Paying for Load Growth and New Large Loads APPA September 2007.ppt 1 Paying for Load Growth and New Large Loads David Daer Principal.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
AFC METHODOLOGY EMS USER GROUP SEP 12, 2004 AFC – New Developments EMS USER GROUP Sep
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Chapter 4: Trends in Hospital Financing. Trends in Hospital Financing Chartbook 2000 Overall Financial Performance The aggregate hospital total margin.
Network Transmission and Rollover Rights July 22, 2015 BPA.
Growth Initiatives Mailing Services MTAC February 18, 2010.
1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
1 New Orleans, LA July 31, 2007 Randy Helmick Vice President, Transmission Business Entergy Transmission Planning Summit.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
1 Entergy Transmission Planning Summit Transmission Planning & Budget Process Doug Powell New Orleans, LA July 10, 2003.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
1 Westar Energy’s 2012 Annual Transmission Revenue Requirement Meeting October 25, 2011.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
Public Hearing: Fiscal Year 2017 Recommended Operating Budget City Council Meeting, May 9, 2016 Item 7.
Frank & Bernanke 3rd edition, 2007
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Presentation to the Enron Corp. Finance Committee
SunZia Project Description
Appendix: 2017 RTEP Report Key Graphics and Information
Second Interim March 14, 2017.
2017 Annual Attachment O Stakeholder Meeting Ameren Missouri
Presentation transcript:

1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States

2

3 SERC Generation Development Survey Fifth annual survey Survey request sent in late January Information requested from Transmission Providers All results received by early March Leading the Industry!!!

4 Collects 10 years of planned generation development Categorizes facilities by interconnection status –Interconnection service requested –Interconnection agreement signed Sub-categories indicate the amount of generation designated as a network resource Reports aggregate, not plant specific, generation plant capabilities Final results reported on Regional and subregional basis SERC Generation Development Survey

5 Current Status of Generation Plant Development * In-Service Year of Added Generation (MW) ) Interconnection Service Requested, Only > Designated as Network Resource or has obtained Firm PTP Transmission service ) Interconnection Agreement Signed/Filed > Designated as Network Resource or has obtained Firm PTP Transmission service SERC Generation Development Survey

Survey Projected Interconnected Generating Plant Capability in Commercial Operation Prior to June 1, 2002: (Summer Net Plant Capability in MW) 202,388 MW Total Actual Interconnected Generating Plant Capability in Commercial Operation Prior to December 31, 2002: (Summer Net Plant Capability in MW) 200,744 MW Total Merchant Generating Plant Capability in Commercial Operation Prior to December 31, 2002 : (Summer Net Plant Capability in MW) 26,399 MW SERC Generation Development Survey

7 Projected Capacity Additions - Cumulative, by Category -

8 Projected Capacity Additions - Annual, by Subregion -

9 Projected Capacity Additions - Annual, by Category -

10 Projected Capacity Additions - Cumulative Additions, Only Year Megawatts 2001 Total2002 Total2003 Total

11 Total Projected Generating Plant Capability Additions by July 1, 2010: (Summer Net Plant Capability in MW) 205,837 MW Total Projected Generating Plant Capability Additions by July 1, 2010: (Summer Net Plant Capability in MW) 243,669 MW 2002 Survey Results 2001 Survey Results Total Projected Generating Plant Capability Additions by July 1, 2010: (Summer Net Plant Capability in MW) 72,897 MW 2003 Survey Results Survey Result Comparisons - Cumulative Additions, Only -

12 Projected Total Capacity - Existing Capacity plus Cumulative Additions Year Megawatts 2001 Total2002 Total2003 Total

13 Survey Result Comparisons - Existing Capacity plus Cumulative Additions - Total Projected Generating Plant Capability in July 1, 2010: (Summer Net Plant Capability in MW) 373,010 MW Total Projected Generating Plant Capability in July 1, 2010: (Summer Net Plant Capability in MW) 422,988 MW 2002 Survey Results 2001 Survey Results Total Projected Generating Plant Capability in July 1, 2010: (Summer Net Plant Capability in MW) 274,011 MW 2003 Survey Results

14 Load Trend vs. Projected Total Capacity

15

16 Total projected generation capacity for Summer ’03 (222,960 MW) exceeds projected Summer ’03 load (157,941 MW) by 65,000 MW Total connected generation capacity at the end of last year exceeds projections for SERC Regional load in 2012 –Projected capacity additions indicate sufficient generating resources over the long-term planning horizon SERC Generation Development Survey

17 SERC Generation Development survey accurately projects actual generation development for the following year Survey reflects recent decline in proposed generation capacity additions –Survey projects generation capacity additions of 73,000 MW over the next 10 years –Projected capacity additions for the same period have declined by 61% in the past year Network resource additions continue to be a small percentage of the projected capacity additions in the Region SERC Generation Development Survey

18 SERC Transmission Development Survey Second annual survey Survey request sent in late January Information requested from Transmission Providers All results received by early March Leading the Industry!!!

19 Requests total planned transmission expenditures –5 years of cost data –100 kV and above Requests aggregate data for transmission projects, only –New lines –New substations –Line rebuilds –Substation rebuilds –Line reconductoring projects Excludes distribution station costs Results available on a Regional and subregional basis SERC Transmission Development Survey

20 Transmission Development Expenditures - Projected 2002 versus Actual

21 Transmission Development Expenditures - Projected 2002 versus Projected

22 Survey Result Comparisons - Total Projected Expenditures - Total Projected Transmission Expenditures Over the Subsequent Five Years : $6.932 Billion $6.265 Billion 2003 Survey Results 2002 Survey Results Total Projected Transmission Expenditures Over the Subsequent Five Years :

23 Survey Result Comparisons - Cumulative Annual Expenditures -

24 Total Projected Transmission Expenditures Over the Subsequent Five Years : $6,265 Million $191 Million 2003 Survey Results Of the Total Projected Expenditures Over the Subsequent Five Years, Amount Attributed to Direct Interconnection of Generation : SERC Transmission Development Survey

27 Actual spending in 2002 fell short of projected spending acquired from last year’s survey –Cancellation of generation may have contributed to a portion of the decline –Shortfall was minimal, indicating real spending has been occurring on the SERC transmission systems Projected spending for next five years (beginning in 2003) is slightly below five-year projected spending from survey projected spending correlates well with 2002 actual spending SERC Transmission Development Survey