Errors Detection and Reporting L0DU Hervé Chanal, Olivier Deschamps, Régis Lefèvre, Magali Magne, Pascal Perret LPC Clermont-Ferrand - Université Blaise.

Slides:



Advertisements
Similar presentations
R. CORNAT - LPC - LECC Colmar - septembre Level 0 trigger decision unit for the LHCb experiment Rémi CORNAT, Régis LEFEVRE, Jacques LECOQ, Pascal.
Advertisements

CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
20 July 2006 H. Chanal, R. Cornat, E. Delage, O. Deschamps, J. Laubser, M. Magne, P. Perret LPC Clermont Level 0 Decision Unit PRR.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
June 2006Juan A. Valls - FPA Project1 Producción y validación de los RODs Read-Out Driver (ROD)
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
1 Pulsar firmware status March 12th, 2004 Overall firmware status Pulsar Slink formatter Slink merger Muon Reces SVT L2toTS Transmitters How to keep firmware.
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Using PVSS for the control of the LHCb TELL1 detector emulator (OPG) P. Petrova, M. Laverne, M. Muecke, G. Haefeli, J. Christiansen CERN European Organization.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
RPC Readiness for Data-taking RPC Collaboration 1.
Trigger A front end chip for SLHC CMS strip tracker IN2P3 microelectronic Summer School Frejus, June 2011  Concept of Silicon strip Pt-module.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
11/01/2006Wilco Vink / Martin van Beuzekom / L. Wiggers L0 ECS Workshop Pile-Up System.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
Status of the CSC Track-Finder Darin Acosta University of Florida.
LHCb-week June 2005 OT 1 Dirk Wiedner 1 MHz Readout and Zero Suppression for the Outer Tracker Dirk Wiedner, Physikalisches Institut der Universität Heidelberg.
Report on the Commissioning Task Force activity Global and sub-detector views on ECS Histogram handling : – histogram handling and PVSS – the ALEPH and.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Wilco Vink 1 Outline Optical station Vertex processor board Output board Latency.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
Upgrade to the Read-Out Driver for ATLAS Silicon Detectors Atlas Wisconsin/LBNL Group John Joseph March 21 st 2007 ATLAS Pixel B-Layer Upgrade Workshop.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
- L0DU - Monitoring issues L0 workshop – LHCb 10 January 2006 Hervé Chanal, Rémi Cornat, Emmanuel Delage, Olivier Deschamps, Julien Laubser, Magali Magne,
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
The Software for the CERN Detector Safety System G. Morpurgo, R. B. Flockhart and S. Lüders, CERN IT/CO.
TELL1 command line tools Guido Haefeli EPFL, Lausanne Tutorial for TELL1 users : 25.February
18/09/2006Wilco Vink / Martin van Beuzekom / Leo Wiggers L0 Workshop Pile-Up System.
Integration and commissioning of the Pile-Up VETO.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
M.N Minard Trigger Validation Board Status Cyril Drancourt, Pierre-Yves David,Victor Coco, M.N Minard - Production status - TVB tests on Cryo side.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
L0DU software interface L0 workshop – LHCb 12 May 2005 Rémi Cornat, Emmanuel Delage, Olivier Deschamps, Julien Laubser, Pascal Perret LPC-Clermont.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Calibration & Monitoring M.N Minard Monitoring News Status of monitoring tools Histogramm and monitoring meeting 6/02/08 Calibration farm brainstorming.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans:
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
FPGA based signal processing for the LHCb Vertex detector and Silicon Tracker Guido Haefeli EPFL, Lausanne Vertex 2005 November 7-11, 2005 Chuzenji Lake,
GPL Board Pattern Generator for the Level-0 Decision Unit Hervé Chanal, Rémi Cornat, Emmanuel Delage, Olivier Deschamps, Julien Laubser, Jacques Lecoq,
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
LHCb Week 27/10/04 J.LAUBSER L.P.C/IN2P3 1 Level 0 Decision Unit: Debugging and Monitoring Remi Cornat, Emmanuel Delage, Julien.
Straw readout status Run 2016 Cover FW SRB FW.
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
CRU Weekly Meeting Discussion on Trigger
Remaining Online SW Tasks
Level 1 (Calo) Databases
DQM for the RPC subdetector
Muon Port Card Latency, October 2015
VELO Software Update TELL1 Algorithms Error analysis
Presentation transcript:

Errors Detection and Reporting L0DU Hervé Chanal, Olivier Deschamps, Régis Lefèvre, Magali Magne, Pascal Perret LPC Clermont-Ferrand - Université Blaise Pascal L0 Workshop June 9 th CERN

On board / PVSS  In place  Monitoring of the inputs  Synchronization of the inputs  Trigger rates Average and instantaneous rates Trending  To do  Summary panel Few additional counters to monitor –Overall number of TLK errors –Overall number of de-multiplexing errors Monitor communication with the board  Condition database TCK Enable inputs  Archiving Trigger rates  Alarms Régis Lefèvre - L0 Workshop - June 9th CERN2

Monitoring of the inputs Régis Lefèvre - L0 Workshop - June 9th CERN Spy memories BER Test States of the links Data 3

Synchronization of the inputs Régis Lefèvre - L0 Workshop - June 9th CERN Masks Latencies Monitoring Error counters 4

Trigger Rates Régis Lefèvre - L0 Workshop - June 9th CERN Trending plots L0 Algorithm Non-active trigger channels (monitoring only) 5

On board / PVSS  In place  Monitoring of the inputs  Synchronization of the inputs  Trigger rates Average and instantaneous rates Trending  To do  Summary panel Few additional counters to monitor –Overall number of TLK errors –Overall number of de-multiplexing errors Monitor communication with the board  Condition database TCK Enable inputs  Archiving Trigger rates  Alarms Régis Lefèvre - L0 Workshop - June 9th CERN6

Online monitoring / Presenter  In place  Monitoring of the L0DU bank  Check that TCK is known  Emulator Now from the L0DU bank only Possible: from sub-detector banks, from L0 sub-processor banks  BCID monitoring FPGA2 vs. FPGA3 / FPGA2 vs. ODIN  TLK / de-multiplexing / Tell1 errors  Error status  Summary Report  To do  Rates with trending By elementary condition By group of trigger channels  Test various TCK on zero bias data and inform shift crew when it is time to change the L0 algorithm because the instantaneous luminosity is lower  Alarms Régis Lefèvre - L0 Workshop - June 9th CERN7

Basic example: BCID for positive decisions Régis Lefèvre - L0 Workshop - June 9th CERN8 Run Run 50481

Emulator / BCID monitoring Régis Lefèvre - L0 Workshop - June 9th CERN9 Emulator check BCID check No muon in this run  FPGA3 BCID=0

Monitoring of error status Régis Lefèvre - L0 Workshop - June 9th CERN10 L0Calo status bit not defined in this run

Summary Report Régis Lefèvre - L0 Workshop - June 9th CERN11

Online monitoring / Presenter  In place  Monitoring of the L0DU bank  Check that TCK is known  Emulator Now from the L0DU bank only Possible: from sub-detector banks, from L0 sub-processor banks  BCID monitoring FPGA2 vs. FPGA3 / FPGA2 vs. ODIN  TLK / de-multiplexing / Tell1 errors  Error status  Summary Report  To do  Rates with trending By elementary condition By group of trigger channels  Test various TCK on zero bias data and inform shift crew when it is time to change the L0 algorithm because the instantaneous luminosity is lower  Alarms Régis Lefèvre - L0 Workshop - June 9th CERN12