L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.

Slides:



Advertisements
Similar presentations
Beam Monitors Info from John Musson on new cavity receivers Other monitor issues.
Advertisements

IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI.
ESS DTL beam commissioning
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Laser based Emittance Measurement for LINAC4 Project Overview & Current Status T. Hofmann, E. Bravin, U. Raich, F. Roncarolo, F.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
ORNL is managed by UT-Battelle for the US Department of Energy SNS Beam Diagnostics: Ten Years After Commissioning A. Aleksandrov Oak Ridge National Laboratory,
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Laser Stripping and H 0 monitor systems 10/18/2011B.Cheymol, E. Bravin, U. Raich, F. Roncarolo BE/BI1.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
J. TAN, M. SORDET, L. SØBY, F. GUILLOT-VIGNOT, D. GERARD, M. LUDWIG, D. STEYAERT BE/BI Linac4 Instrumentation Review 18th October 2011.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
BPM stripline acquisition in CLEX Sébastien Vilalte.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
PSB MD C. Bracco, G.P. Di Giovanni. Outline Aim MD1: – Matching – Trajectories – Transmission MD2 – Matching – Trajectories – Transmission Next steps.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Front End diagnostic
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Status of the BI Work Package in the LIU-PSB frame
Phase Feed-Forward Piotr Skowroński (CERN)
Experience with beam instrumentation at Linac4
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
CLEX* Status and Plans CTF3 complex CLEX
Injectors BLM system: PS Ring installation at EYETS
Ewald Effinger, Bernd Dehning
BE-BI Software for LINAC4
AWAKE proposals for BE/BI
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
The ELENA BPM System. Status and Plans.
Status of the BI Work Package in the LIU-PSB frame
LINAC 4 source & LEBT measurement results
HALF SECTOR TEST: a test for the future PSB injection
WPs concerned by L4 connection:
LHC BLM system: system overview
LINAC4 LEBT beam size and emittance diagnostics
Linac 4 Devices Controls and Monitoring Status
LINAC4 commissioning plans etc.
Proton Beam Diagnostics
Status of muon monitor R&D and construction
Linac Diagnostics Commissioning Experience
Breakout Session SC3 – Undulator
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
HL-LHC HEL BPM.
Status of the BI Work Package in the LIU-PSB frame
SPS Injection BIS - Draft requirements
Presentation transcript:

L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker

DESIGN  Completed for almost all instruments (most of TL devices == L4 monitors)  Basically all devices will be tested at 3 MeV test stand  Open issues –Number of devices and locations: need frozen layout Once done: details about interconnections –Profile monitor in dump line (see later slide) –BLM detector type (see later slide) –Equipment of TL with station for laser stripping R&D SCHEDULE / BUDGET  Present advancement/plans/budget for design, fabrication, cabling and installation under control  BI Linac 4 review (with reviewers panel) on October 18 th (tbc and announced in the next few days) F. Roncarolo, U. RaichL4 BCC - 01 Sep 20112

3F. Roncarolo, U. Raich 3 BTVs now replaced by 1 WS or SEM GRID (H+V) From Layout DB

L4 BCC - 01 Sep 20114F. Roncarolo, U. Raich  Copy of LEBT monitors –100 mm diameter –Up to 200 MHz sampling rate  Acquisition sync. with the distributor, to know how much beam current goes to each PSB ring –Electronics ready for such option –Need FPGA code update (likely not possible before LS1)  In general –Do we agree on the number of devices? –Foreseen by BI : 6, Layout DB: 7

 Shorted strip-line detectors –Same design for all L4 BPMs –Diameter for TL monitors: 100 mm, L = ~250mm –Electronics with down-mixing of 22 MHz  maximum sampling rate 4x22=88 MHz –50 ns pulse length beam position measurement foreseen by the design (noise levels to be investigated)  For TL: is # of monitors and location frozen ?  At the moment of installing TL BPMs: will it be possible to change the 17 old TL monitors (after BHZ20)? F. Roncarolo, U. RaichL4 BCC - 01 Sep J. Tan

 Same design as all L4 monitors – will require reduced pulse length (100us)  Mechanics ~ on schedule, 140 mm flange-to-flange (PIMs type)  New electronics under development, to be tested on 3 MeV test stand –200 kHz ADC band (5 us) –Wire polarization –New connectors and cables: 32 channels in 1 cable F. Roncarolo, U. RaichL4 BCC - 01 Sep Is this up to date? Once frozen: verify details of flange connections

 3 screens option abandoned  Additional monitor not included in BI plans –What are requirements? –SEM Grid or WS ?  Spare L4 SEM grid –single shot meas –24 wires fixed pitch  Spare L4 WS –multishot meas –40 um resolution (wire diam.)  SEM grid on stepping motor –Not foreseen by BI (can recuperate test bench device?) –Not single shot but can improve resolution with less shots than WS  new SEM with variable resolution (by variable rotation w.r.t. beam axis) –not foreseen  design new or try to recuperate L2 type device –When rotation != 90 deg: during single shot the sampling is done at different longitudinal locations F. Roncarolo, U. RaichL4 BCC - 01 Sep 20117

F. Roncarolo, U. RaichL4 BCC - 01 Sep W.Vigano, C. Zamantzas Auto-gain switching -Integrated detector signal sampled every 2 us -From pA to mA detector output current 2 us : sampling the integral  Electronics under development, in parallel to L4 linac and PSB new electronics  Special screened cables to minimize EM noise (problem in other world-wide linacs)  TL cable installation on stand-by while waiting for latest beam optics and BLM location s  Every second BLM location is equipped with a spare cable to host an additional monitor if needed  Choice of detector (Ionization chamber, chamber type, or possibly other detectors) under discussion Wide dynamic range expected !

 Aim at profile + emittance measurement  For Linac 4 –At least 1 station –Y dipole –Establish laser location and optical line path  If there will be no intermediate dump between 1st bend and BI line: –can test only laser stripping and profile meas (no emitt. meas) with a station after PIMS F. Roncarolo, U. RaichL4 BCC - 01 Sep LASER stripping H0 monitor Possible locations

 BCT – BPM –Low level completed or well on the way to completion –Need OP GUI development –All will be tested at 3 MeV test stand  SEM grids –Low level and OP GUI done, being used at test stand  BLM –Definition of the memory map CPU in readout simulation mode Start development of driver, RT software, etc. –First version of memory map (LINAC4) - end of September F. Roncarolo, U. RaichL4 BCC - 01 Sep

F. Roncarolo, U. RaichL4 BCC - 01 Sep

F. Roncarolo, U. RaichL4 BCC - 01 Sep

F. Roncarolo, U. RaichL4 BCC - 01 Sep