TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.

Slides:



Advertisements
Similar presentations
New HV test specification for the LHC N. Catalan for the EI section.
Advertisements

Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
Herman ten Kate and Alexey Dudarev MCS 600A sextupole circuits (update on study performed in May 2010) Content: References General observations Electrical.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Overview of the recommendation on LHC Splices Consolidation Frederick Bordry, head of the CERN Technology Department, has called for a series of three.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
LMC 30 LPC A. Verweij, TE-MPE. 30 Sept 2009, LMC meeting 1.9 K, 0 T, 7.5 kA run Heat pulse.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Stephen Pemberton, TE/MPE-EI RB Earth Spark Investigation Initial Report. S. Pemberton, G. D’Angelo.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
TE-MPE LS1 review 02/06/2015, Mateusz Bednarek, TE/MPE-EE ELQA during LS1 – the “unexpected” activities New developments Exceptional NCs Other tests.
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
CSCM type test: Diode Leads and Diodes Gerard Willering & Vincent Roger TE-MSC With thanks to Bernhard Auchmann, Zinour Charifoulline, Scott Rowan, Arjan.
TE/MPE/EE Short ‘Halfway’ Update ELQA – LS1 Activities MPE/The Electrical Engineering section Knud, on behalf of TE/MPE/EE – 20 September LSC Reminder:
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
CSCM Project Status and Prospects Andrzej Siemko on behalf of the CSCM project core team: Mike Koratzinos, Jens Steckert, Hugues Thiessen and Arjan Verweij.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Nuria Catalan Lasheras, TE/MPE-EI REVIEW OF ELECTRICAL DRAWINGS FOR THE LHC SUPERCONDUCTING CIRCUITS.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Faster ramp rates in main LHC magnets Attilio Milanese 7 Oct Thanks to M. Bajko, L. Bottura, P. Fessia, M. Modena, E. Todesco, D. Tommasini, A. Verweij,
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
MP3- MIC-C S1-2 A22R1- 19/08/2009 G.D’Angelo on behalf of Elqa team MP3 MIC-C test campaign in S1-2 Special guest: A22R1 (MB2413)  MIC-C in the ARC results.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
SC Undulators protection and commissioning W. Venturini Delsolaro Acknowledgements: R. Denz, R. Maccaferri.
Electrical Quality Assurance and Voltage Withstand Levels F. Rodriguez-Mateos on behalf of the High Voltage Withstand Levels Working Group.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
Click here to add footer 1 Ludovic Grand-Clément & Hervé Prin 08/12/2014.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
First LHC Splice Review Introduction
Electrical insulation of magnet circuits in sector 7-8
Minimum Hardware Commissioning – Disclaimer
Giorgio on behalf of ELQA team
LHC Hardware Commissionning
ELQA How to define test voltages
Circuit-protection aspects of different preliminary magnet-design options
Consequences of warming-up a sector above 80 K
Keeping LHC cold during LS periods Preliminary proposal
Powering the LHC Magnets
MPE main activities planned for LS2
Status of ELQA equipment and related software
Recommissioning of sector 12 after a short warm-up during eYETS 2016/17 QBT, MP3 – May 2017 S. Le Naour.
Dipole diode lead resistance measurement
Consolidation of the dipole diode insulation Technical aspects
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
3 issues identified in review
Andrzej Siemko (CERN) and Marco Zanetti (MIT)
Other arguments to train two sectors to 7 TeV
ECR on pole order of the HL-LHC IT circuit and resulting implications
Electrical measurements and diagnostics
Presentation transcript:

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard Mompo 1

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo In brief: Why do we need to update this procedure? We introduced a new test (MIC) that involves a HVQ of the quench heaters. o We believe that we need to review the test parameters used in We revised the different scenarios. o Written down the rules that apply during Xmas breaks, shutdowns, partial warm-up of a sector based on past experiences. But the most important... The voltage parameters for HVQ test derived from EDMS from 2004 (LHC-PM-ES-0001 rev. 2.0) are not taking into account the physical configuration of the machine (presence of EE switches opening simultaneously, vicinity of different circuits) and as a consequence the test voltages should be increased significantly!EDMS o c.f Nuria’s presentation during MPE-TM meeting of 11 Oct. 2010MPE-TM meeting of 11 Oct o C.f H. Ten Kate presentation to Splice Task Force (Oct. 2010): Test voltage too low to guarantee insulation: Pointed out for the MCS then extended to other circuits C.f H. Ten Kate presentation to Splice Task Force The plan is to use those new test parameters for the ELQA campaign taking place at the end of this run to find all limitations... and to have time to take corrective actions during LS1, before the run at 7 TeV. 2

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Samy Chemli circulated a revised version of our test procedure. 40 persons were notified and we got very few comments!!! Important comment: o Juan Casas-Cubillos estimated the cost for the repair/replacement of broken cards consecutive to ELQA tests at higher voltages to some 1.6 MCHF. No strong reaction from the magnet group (except H. Prin who found a minor inconsistency between 2 tables)? No reaction within our group (except Arjan & Reiner)? We want to make sure that everybody understand the risks involved by those modifications! 3

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Table n°6 (p. 23): New proposed test voltages for TP4 and DOC tests 4 Legend: V EE = Ultimate Current * EE res V quench from EDMS 90327EDMS V EEq = V EE + V quench V 2q = Ʃ V quench for nested magnets V GPA is a voltage developped during a Global Power Abort = Max. Voltage seen by a circuit = his own voltage + Max. Voltage on the same cryo. line Proposed HV test voltages (TP4) We make the assumption that a quench does not propagate to the busbars!

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Table n°10 (p. 27): New proposed test voltages for MIC tests 5 Reminder: MIC test involves a HVQ test of each QH vs “Coil+GND”. We revised the test voltage values. The calculation is as follows: U = 1.2 x (V DQHDS + V quench ) = 1.2 x (900 + V quench ) Major HW modification would be needed to be able to test above 2000 V. It is foreseen to produce specific HDSs for Separator Dipoles with lower voltages Proposed HV test voltages (MIC)Proposed HV test voltages QHs actually see 450 V but in case of an internal failure of the HDS, they may see 900 V.

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Conclusions Some components may not wistand those test voltages (ex: cryo. cards). o A stock of spares need to be prepared… Several circuits have never been tested to those voltages (but, in some case, in SM18, single magnets were tested at higher voltages). o We want to identify weaknesses before the warm-up. In some cases, we don’t have any spares (ex: Inner Tripplets). Breakdowns propagating along a circuit may damage other components such as: QPS controllers, TT sensors... Redesign HVQ crates to reach 2600 V ? Is it planned to modify the extraction resistance of RQD and RQF circuit during LS1? Do we need to put our American and Japanese colleagues in the approval list? … Some other limitation/implication, that we are not aware of, may exist? 6

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Thank you for your attention! 7

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Spares slides 8

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Exceptions: The proposed voltage is in most cases taken close to 1.2 times V max. However, we have made exceptions in some cases: *The case of the dipole line is special, as the maximum voltage assumed already on [9] is due to a possible fault on a pole of a power converter. No safety margin is taken however in this case. The safety margin is also reduced for the MCO circuit. **For the MQ circuit, we recommend to test them at the 1.2 times VEEq to qualify the circuit under the worse conditions seen by the coil. The required voltage difference between bus-bars in line M1/M2 will be seen during the test of the spools and correctors done this time at a higher value. This means that partial test only on the MQ lines is not allowed. All HVQ tests have to be done in all the circuits of the same line, namely M1/M2. For MCDO, the highest constraint comes from energy extraction of the MCD circuit. There are no values of voltage developed during a quench for this magnet but we assume the voltage is very low given the low nominal current. Values in red are higher than the withstand voltage currently applied. 9

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Test parameters for dipole magnets tested in SM18 10

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Test parameters for SSS magnets tested in SM18 11

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Test parameters for SSS magnets (500 series) tested in SM18 (1/2) 12

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Test parameters for SSS magnets (500 series) tested in SM18 (2/2) 13

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Test parameters for S4 magnets tested in SM18 (1/3) 14

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Test parameters for S4 magnets tested in SM18 (2/3) 15

TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Test parameters for S4 magnets tested in SM18 (3/3) 16