LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
POWER GRID CORPORATION OF INDIA LTD
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Hon’able Members of Standing Committee on Energy WELCOMES POWER GRID CORP. OF INDIA LTD.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
W E L C O M E Power Grid Corporation of India Limited.
WELCOME TO K. SWAMINATHAN, CHAIRMAN K. SREERAMA MURTHY, MEMBER
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
1 POWER GRID CORPORATION OF INDIA LIMITED BANGALORE.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 139 TH SREB MEETING 19 TH DECEMBER 2005 HYDERABAD GRID EVENTS AND ISSUES.
POWERGRID Welcomes Hon’able Members of “Standing Committee on Energy”
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
RAMAGUNDAM- HYDERABAD-KURNOOL- GOOTY LINE HOW EARLY COMMISSIONING WOULD HELP.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
POWER GRID CORPORATION OF INDIA LTD.
Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
Overall National Grid Development: Constraints & Options
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
1 PRESENTATION ON FREQUENCY CONTROL AND FREE GOVERNOR OPERATION TO THE OFFICERS OF CENTRAL ELECTRICITY AUTHORITY On 4 th April, 2005 by V.K. Agrawal SRLDC,
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
BANGALORE TRANSMISSION PLANNING
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
ENERGY CONSERVATION IN SR - A CASE STUDY
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
REGIONAL GRIDS IN INDIA – QUICK FACTS
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
KADAMPARAI PUMP OPERATION
FREE GOVERNOR MODE OF OPERATION
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
An operational analysis of Kadamparai Pumped Storage Hydro Plant located in Tamil Nadu Sanyasi Naidu.
Presentation transcript:

LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS

MAJOR ACHIEVEMENT IN KARANATAKA QUANTUM IMPROVEMENT IN SYSTEM PARAMETERS QUANTUM IMPROVEMENT IN SYSTEM PARAMETERS GRID FREQUENCY GRID FREQUENCY GRID FREQUENCY GRID FREQUENCY VOLTAGE PROFILE VOLTAGE PROFILE VOLTAGE PROFILE VOLTAGE PROFILE OPTIMAL UTILISATION OF RESERVOIRS OPTIMAL UTILISATION OF RESERVOIRS OPTIMAL UTILISATION OF RESERVOIRS OPTIMAL UTILISATION OF RESERVOIRS METICULOUS LOAD FORECASTING & MERIT ORDER DESPATCH. METICULOUS LOAD FORECASTING & MERIT ORDER DESPATCH. BENEFITED FROM TALCHER – KOLAR LINK (9770MUs/1600MW MAX) BENEFITED FROM TALCHER – KOLAR LINK (9770MUs/1600MW MAX) NO MAJOR GRID DISTURBANCES. NO MAJOR GRID DISTURBANCES. BEST UTILISATION OF UI MECHANISM BEST UTILISATION OF UI MECHANISM 2061MUs 172 Ps/U(80 Crores Saved) 2061MUs 172 Ps/U(80 Crores Saved) COSTLY GENERATION REDUCED. COSTLY GENERATION REDUCED. HYDRO GENERATION OPTIMISED. HYDRO GENERATION OPTIMISED.

MAJOR ACHIEVEMENT IN KARANATAKA BENEFITED BY PARRALLELING INTER-STATE LINES BENEFITED BY PARRALLELING INTER-STATE LINES YERANDAHALLI – HOSUR YERANDAHALLI – HOSUR VOLTAGE IMPROVED AROUND 4 BNG & 9 Y’HALLI VOLTAGE IMPROVED AROUND 4 BNG & 9 Y’HALLI LOSS REDUCTION OF 4 – 5 MW LOSS REDUCTION OF 4 – 5 MW 10 CRORES SAVINGS IN A YEAR 10 CRORES SAVINGS IN A YEAR KADAKOLA – KANIYAMPETA KADAKOLA – KANIYAMPETA VOLTAGE IMPROVED AROUND 2-3 KADAKOLA, T.K.HALLI & MYSORE AREA VOLTAGE IMPROVED AROUND 2-3 KADAKOLA, T.K.HALLI & MYSORE AREA LOSS REDUCTION OF 2 MW LOSS REDUCTION OF 2 MW 4 CRORES SAVINGS IN A YEAR 4 CRORES SAVINGS IN A YEAR BANGALORE CITY RING MAIN IN PLACE BANGALORE CITY RING MAIN IN PLACE BANGALORE CITY RING MAIN IN PLACE BANGALORE CITY RING MAIN IN PLACE TRANSMISSION LOSSES REDUCED FROM 6.5 % TO 4.8 % TRANSMISSION LOSSES REDUCED FROM 6.5 % TO 4.8 % 130 CRORES SAVING IN A YEAR 130 CRORES SAVING IN A YEAR 47 NEW S/S & 1236 CKM T/L ADDED DURING NEW S/S & 1236 CKM T/L ADDED DURING

FREQUENCY PROFILE

REALITY BITE: FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!. EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED! COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY

WATER SUPPLY TO BANGALORE LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED 400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID

OPTIMAL RESERVOIR UTILISATION LINGANAMAKKI IN KARNATAKA ENERGY STORAGE IN MU (THIS YEAR) :- 1480MILLION UNITS ENERGY STORAGE IN MU (LAST YEAR) :- 834MILLION UNITS MORE THAN 400 MILLION UNITS OF ENERGY SAVED DUE TO IMPROVED OPERATIONAL EFFICIENCY AND OPTIMISATION MINIMUM /MAXIMUM HYDRO GENERATION BY KPTCL ON: 36mu on 26-jun mu on 16-May-04

HYDRO GENERATION KARNATAKA

PROJECTS IN THE PIPELINE IN KARNATAKA

PROJECTS IN KARNATAKA 400 KV NELAMANGALA-MYSORE LINE WITH 400 KV SUBSTATION AT MYSORE 400 KV NELAMANGALA-MYSORE LINE WITH 400 KV SUBSTATION AT MYSORE 400 KV KAIGA-NARENDRA LINK 400 KV KAIGA-NARENDRA LINK 400 KV SUB STATION AT NARENDRA 400 KV SUB STATION AT NARENDRA 400 KV RING MAIN AROUND BANGALORE 400 KV RING MAIN AROUND BANGALORE 400 KV 2 nd GOOTY-BANGALORE LINK 400 KV 2 nd GOOTY-BANGALORE LINK 400 KV RAICHUR-GOOTY D/C QUAD LINE 400 KV RAICHUR-GOOTY D/C QUAD LINE 400 KV STATION AT HASSAN :- LILO OF EXISTING TALAGUPPA-NELAMANGALA LINE AT HASSAN OR 400 KV HASSAN-GUTTUR LINE 400 KV STATION AT HASSAN :- LILO OF EXISTING TALAGUPPA-NELAMANGALA LINE AT HASSAN OR 400 KV HASSAN-GUTTUR LINE

FREE GOVERNOR MODE OF OPERATION

HIGHLIGHTS 20,500MW (70% of I/C) ON FGMO. 20,500MW (70% of I/C) ON FGMO. FREQUENCY FLUCTUATIONS – SMOOTHER NOW FREQUENCY FLUCTUATIONS – SMOOTHER NOW MERIT ORDER DESPATCH – PRICE SIGNAL VISIBLE MERIT ORDER DESPATCH – PRICE SIGNAL VISIBLE NO UFR (< 48.5HZ) OPERATION SINCE JULY-03 INSPITE OF CONTINGENCIES. NO UFR (< 48.5HZ) OPERATION SINCE JULY-03 INSPITE OF CONTINGENCIES. UFR STG 1 OPERATED TWICE IN 500 DAYS UFR STG 1 OPERATED TWICE IN 500 DAYS CERTIFICATION OF FGMO BY STATION IN- CHARGE – THREE TIER MONITORING CERTIFICATION OF FGMO BY STATION IN- CHARGE – THREE TIER MONITORING STATION-INCHARGE STATION-INCHARGE SLDC SLDC RLDC RLDC CONSTITUENTS INTERACTING WITH MANU- FACTURERS. CONSTITUENTS INTERACTING WITH MANU- FACTURERS.

STATUS OF FGMO IN SR (ABSTRACT) STATE CAPACITY ON FGMO ( MW ) HYDRO > 50 MW THERMAL/ GAS > 200 MW TOTAL ANDHRA PRADESH3,1803,7556,935 KARNATAKA2,5091,2603,769 KERALA1, ,010 TAMIL NADU8002,5203,320 ISGS---2,940 TOTAL7,49910,47517,974 DEMAND VS FREQ GRAPHS FGM GRAPHS KTS ALL UNITS TRIP- SCADA SNAPS

BANGALORE 400 KV RING MAIN 400 KV RING MAIN SOMANAHALLI NELAMANGALA KOLAR HOODY FROM GOOTY

BANGALORE 400 KV RING MAIN 400 KV RING MAIN SOMANAHALLI NELAMANGALA KOLAR HOODY FROM GOOTY