Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.

Slides:



Advertisements
Similar presentations
Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
Advertisements

RES G series TRAining CEntre Maintenance. Remove blast tube to check: Correct electrodes position Air nozzle position Fuel nozzle condition.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
M. Steller Space Research Institute, Graz EDI Gun FM2 Performed Tests and Results 1IWF/ÖAW GRAZ.
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
UoA calibration system1 Modular calibration/monitor system for the GlueX BCAL +FCAL University of Athens * G.Voulgaris E.G.Anassontzis P.Ioannou E.Kappos.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
HPD Development Project is DONE! The Future is Quality assurance Database management Alignment Production of cookies and mounts Electronics interfacing.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
3/29/20121 PHENIX WEEKLY PLANNING 3/29/2012 Don Lynch.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
CLAS12 Drift Chamber Prototyping
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
LKr status R. Fantechi.
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Seyoung Han / Ewha Woman’s Univeristy
Presentation transcript:

Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1

Clamp Schedule clamps production 40 clamps Install 6/15 Humidity test bench Design Review 5/16 Basically OK, except for a few homework Humidity 1008 ProcurementBid Production Partial Delivery QA Install Delivered to BNL L 2

Octant-7 Clamp Status Octant pin type 1A 1B 3 The dry air cover installed to here 1B

Octant-8 Clamp Status Octant Conductive Rubber Type 4-pin type 1B 2A 2B 1A 1B 2A 4

DesignNumber of Clamps Rubber Type3 4-pins3 1-pin3 1-pin Old Design28 1-pin New Design8 5 Pre-installed Idendical

Clamps Install (north St-3, oct7&oct8) Octant Max 20 clamps /gap Octant To be installed during next maintenance day on June 15 to bottom region of Oct-7&8. Old Design x 10 Old Design x 11 Dry Air Cover x 8 Dry Air Cover x 8 Old Design x 10 New Design x 8 4pin x 3 1A 1B 2A 2B

Dry Air Cover Octant Manifold -> Requested to Carter 10 additional dry air covers to be installed 7 Flow rate 100ccm/clamp?

8 40 Clamps Install Man Power Sanghwa, Maintenance Day clamp Install Maintenance Day clamp Install Sanghwa Park (SNU) Yoshimitsu Imazu Yoshimitsu will stay in BNL until the end of Run11 just in case.

6/15 Access Day Install Work plan is discussed in DC (June 8). Itaru, Yoshimitu, Sangwha, and Hideyuki will work on install. (All confined space trained) Requested 8 hours access to CAD via Takao (RC). Work permit, confined space survey are arranged. (Don Lynch). Install as many as possible clamps up to 40 clamps. Need to monitor stable condition for 1~2 hours after completion of the installation until the hall close. Successful contact rate, drawing current w/ HV will be closely monitored during/after installation. A new AC readout clamp is to be tested w/ anode calibration pulse and a pulser input from the center cathode cable. 9

Installation Procedure (1) 1.Take HV current snapshot. 2.Remove Preinstalled Clamps from Gap-0. 3.Install new clamps to Gap Install clamps to Gap-0. Oct-8 Oct-7

Installation Procedure (2) 1.Inspect target anode pads and record damaged/missing pad channels. 2. Apply conformal coating. 3.Plug-in V-readout pins to a clamp. 4.Mount the clamp. 5.Record V-readouts. Try unscrew and screw if contact is fragile. 6.Remove V readout pins. 7.Ramp up HV every 2 clamps install and check drawing current. 8.(Mount dry air cover) 11

Recording Contacts 12 Damaged/missing pad Damaged/missing resister

Material Readiness QuantityStatus Pig Tail 2M Terminals40Mounted by default 2M Screws100Provided by F. Toldo GND Holder40 x 2Manufactured by F. Toldo Hex screw wrench Regular5Delivered Torque1To be delivered to RIKEN Dry Air Cover Manifold1Available Adupter10Ordered by Carter AC Readout New Board1Delivered Readout cable50 (long+short) Delivered Pocket pulser2Delivered to RBRC Cathode cable adupter 1Custom made by Yoshimitsu Oscilloscope1Available in 1008 Inspection Fiber Scope1In test bench 13 Conformal coating+brush

Preparation Assemble GND Holders Make/repair V readout boards – 2 boards w/ long pins ✔ – 1 board w/ short pins ✔ (for AC readout) 14 6/13 ~ 1008

AC Readout 15 HV side GND side HV side GND side DC Voltage Readout AC Voltage ReadoutOne AC readout clamp will be available for test on June 15 th.