TPB evaporation Maura Spanu, Università di Pavia, INFN Pavia WA-104 weekly meeting 24/02/2016.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

SSPC PA-2 “Measurement of Dry Coating Thickness with magnetic Gages”
Fishworx Training Reminders and Feedback. Daily Use of Fishworx Website enquiries to be zero Not Contacted to be zero Messages to be zero Reminders to.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
2008, July Nantes 1 APD Tests : Status and Protocol Giuseppe S. Pappalardo INFN Catania.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
SPSU Progress on coatings and grooves M.Taborelli -Progress on C based coatings -Progress on rough coatings -Progress on SEY instrument -Grooves.
Information Architecture Week 15. Information Architecture CALENDAR.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Solar Cell conductive grid and back contact
Identifying Problem Sources at Data Entry and Collection National Center for Immunization & Respiratory Diseases Influenza Division Nishan Ahmed Regional.
Chapter 20 Materials  Wednesday (Today)  Don’t miss the new WA that has been posted.  Today we work on Capacitors from Chapter 20  Look at the chapter.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 pH observed with Honeywell pH electrodes Current Plan for Calibration and Cleaning Gel replacement Checking with Buffers pH: SATURN-03; SATURN-04.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
1 Summer Project 2008: Calibration of interferometer end point measurement errors Week 2.
Target 18 Jun H. Kanda. To do list Aluminum cell (Type 2 and 3) –Mirapro: Invoices delivered, invoice for the shorter cell was requested PET pipe.
Emulsion Development Activity C.Sirignano Opera CM - Mizunami - 20/01/2009.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
Catania Integration site 5/11/15 Integration meeting 5 Nov 2015 Latest activities in Catania site 1.
WEEK 1 You have 10 seconds to name…
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Status of the Photocathode R&D for ATF RFgun N.Terunuma (KEK)
The ESS Linear Accelerator
Experience with 1 x 1m 2 and 2 x 1 m 2 MM assembly CERN/PH/DT Hans Danielsson, Francisco Perez Gomez, Philippe Lenoir, Pierre-Ange Giudici, Francois Garnier,
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Computer Simulations of Liquid Crystal Models using Condor C. Chiccoli (1, P. Pasini (1, F. Semeria (1, C. Zannoni (2 ( 1 INFN Sezione di Bologna,
EMC simulation: effects of geometry options on energy resolution PID + EMC joint meeting LAL 27/11/2009 C. Cecchi - S. Germani* Università di PerugiaI.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
About PMTs first series cold and warm tests G. Raselli (INFN and Universita di Pavia) F. Tortorici (INFN and Universita di Catania) M. Rossella (INFN and.
TPB coatings at TE-VSC-SCC Wil Vollenberg CERN TE-VSC-SCC ; WA 104 weekly meetingWil Vollenberg Co-workers: Pedro Costa.
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
1 Update from the Tent Thomas K Hemmick for the Tent People.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
Vienna, PANDA meeting, December 1 st, 2015 Universita’ di Pavia Italy Track efficiency and contamination in Road Finding Pattern Recognition when the interaction.
BIS 320 Week 3 Individual Assignment- Determining Databases and Data Communications Check this A+ tutorial guideline at
ACC 220 Week 9 Final Project Business Plan Check this A+ tutorial guideline at 220/ACC-220-Week-9-Final-Project-Business-
Plans for this week MWPC: wire stretching today
© 1997, Angus Rockett Section I Evaporation.
Diagnostics for XPR CNAO BD Group Pavia, 17 marzo
Final Results of Drift Cell Simulation and Parametrization
News about the WA104 Programme
Status of straw production straw module assembling
Final Grade Averages Weighted Averages.
Status of Cathode System in FZR
Which graph makes sense?
Undulator Tuning Status
Group Assignments Consult about Poster / Talk
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
EMC Simulation Studies SuperB Collaboration Workshop LNF 1/12/2009
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
Status of the Calibration
Presentation transcript:

TPB evaporation Maura Spanu, Università di Pavia, INFN Pavia WA-104 weekly meeting 24/02/2016

Evaporation status 2 Last week we had some problems with crucible 2 (probably due to the temperature gauge). This week the series production is ongoin but only with the crucible 1. For the C2 we must draft a new coating procedure (temperature steps).

Knudsen cell calibration 3 1.Do an open evaporation: Temperature VS Rate 2.Fix a rate value which corresponds to the shutter opening temperature (the rate depends on the distance from the quartz crystal) 3.Test your evaporation with the mockup: - Average Rate in stable condition (for C2) ≈ Time < 15:00 - Final thickness > 5,0 Å Last week we had some problems with crucible 2 (probably due to the temperature gauge). This week the series production is ongoin but only with the crucible 1. For the C2 we must draft a new coating procedure (temperature steps).

QE measurements 4 The last week, a QE test will be done in Pavia on 5 evaporated PMTs.

QE results 5

Conclusions PMT’s are now evaporated and stocked in B182 (other 18 PMTs are cleaned and ready to be evaporated).  7-> to be cleaned and redone (density < 0,19 mg/cm 2 )  5 -> to be checked  1 -> already checked, seems good At: 7: :subDocs you can find the updated evaporation database.