TEAM ADAPTIVE REC Members Advisors Dale Calnek Jerel Hutapea Chang-Won Park Casey Radtke Academic: Dr. Sung Yi Industry: Jennifer Armbruster Todd Bauch.

Slides:



Advertisements
Similar presentations
ASSISTIVE TECHNOLOGY An overview of AT services to support the teachers and students in Cobb County.
Advertisements

Corner Rounder Capstone Team Melissa Anders Andrew Dillon Joshua Schmidt Matt Kirtley Team Members: Faculty Advisor: Huafen Hu.
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
Computing & Software Systems
BUSINESS PROCESS IMPROVEMENT INITIATIVES Chad Cleveland June 18, 2014 BAAF Meeting.
1 Institutional Support Services Capital Project Process.
Walker Renovation. Team Keen: Walker Renovation ME 493: Final Presentation 2006 Team Members: Natashia Baer Chelsea Stogsdill Sara Jennings Adam Abshire.
A Sled System for Motor Vehicle Crash Simulation and Forensic Biomechanics Group Members: Joshua Booren Travis Deason Steve Savas Max Brunhart Customer:
Mission Statement Design a laboratory test chamber for the acquisition of thermal data as pertaining to the testing of computer-based electronic devices.
Visual Communication Program Curricular Changes 2008 / 2009 Prepared by the Visual Communication Faculty.
Quality Assurance and Development Unit College of Applied Medical Sciences Females 1.
Mini Baja-Dynamometer Final Presentation Group Members In Suk Kang Jong Min Park Academic Advisor Sung Yi Industry Advisor PSU Mini-Baja Date: May
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
PSU / Keen Mobility Expandable Wheelchair Final Report Sponsor: Industry Advisor: Facility Advisor: Team: Keen Mobility Rick Klein Faryar Etesami Meagan.
Academic Advisor: Dr. Dave Turcic Team Members: Ron Pahle Khoa T. Tran Duc M. Le Thanh Q. Nguyen Shafi Alhajri Sponsoring Company: Edwards Vacuum Ltd.
Sensation! Park Quality and Commitment. Our Mission To provide our guests with an experience in which family and friends can enjoy quality recreational.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
4/28/2004Optical Tape Measure Optical Tape Measure May Team Members: Faculty Advisors: Nick Freese (EE) Dr. Aleksander Dogandzic Bruce Fu (EE) Dr.
Lec#14.  Disable person needs equipment with the degree of impairment and desired degree of independence in area of personal care, mobility, leisure,
Adaptation of a Van with a Device to Lift a Non-foldable Wheelchair Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web.
Created by: Aaron Lange. What is FLASH? On campus employment opportunity for first year college students! Various positions in multiple program areas.
Proposal Training.  What is Budgeting by Priorities?  How do I participate?  How do I write my proposals? ◦ Narrative Requirements ◦ Mechanics.
Bamboo Bike Capstone Team Members Camrun Arkills Kyle Heitmeyer Fay Gibson Matt Brown Faculty Advisor Hormoz Zareh, PhD Associate Professor of Mechanical.
Universal Design Principles and The Built Environment Jean Salzer Accessibility Resources Center (formerly Student Accessibility Center)
Technology Access In Post-Secondary Education Ron Stewart Managing Consultant AltFormat Solutions LLC.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :
Optical Encoder for a Game Steering Wheel May Team members Sam DahlkeCpr E Peter FecteauCpr E Dan PatesEE Lorenzo SubidoEE Advisors Dr. James Davis.
Engineering System Design
ADVANCED DESIGN APPLICATIONS UNIT 4 - MANUFACTURING © 2015 International Technology and Engineering Educators Association, Learning Cycle Three – Looping.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
May05-36: Boone Cemetery Management Software Boone Cemetery Management Software May05-36 Greg Thede, Director, Boone Parks Department Dr. Kothari Joseph.
CYBERSIM Dec Client: Information Assurance Center Advisor: Dr. Doug Jacobson Group Members: Ryan ApplegateCprE Saddam KhattakCprE Dan NguyenCprE/JLMC.
Interactive Systems Research Center Mission statement and overview
Intel ® Robotic Tablet Charger Presenters Hung Nguyen Kevin Hughes Group Members Garrett Pauwels Justin Carey Nolan Igarashi Richard Mullenburg PSU Faculty.
Los Angeles Southwest College LACCD Trustee Accreditation Subcommittee Self-Study Overview December 14, 2005.
Community Meeting September 9, 2015 COMMUNITY CENTER IMPROVEMENT PROJECT BENNING PARK COMMUNITY CENTER.
Context of the Project Close-Out Document Project is coming to an end, but hasn’t ended yet.
MV Campus Strategic Planning Committee Subcommittee Structure And Priorities.
Cross-Country Sit Ski Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett Academic Advisor: Dr. Hormoz Zareh Industry Advisor:
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Defining Design Goals and Design Requirements © 2013 Project Lead The Way, Inc.Engineering Design and Development.
Smoke Notification System (SNS) Mid-Semester Presentation Senior Design 1 February 28, 2013.
Rec 3530 Program Planning in Recreation and Parks Chapter 12 Program Monitoring “Four steps to achievement: Plan purposefully. Prepare prayerfully. Proceed.
Cross-Country Sit Ski Progress Report Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett Academic Advisor: Dr. Hormoz Zareh.
Virtual Reality for Large Audience Participation Abstract Introduction Design Requirements Abstract Introduction Design Requirements End-Product Description.
Problem Statement The goal of this project is to complete the basic automated functions of the Dream Green putting surface. The objective is to produce.
Group 18 Chen Zhang Client: Professor Frank Yin Sept. 30, 2015 Smart Walker Project PRELIMINARY PRESENTATION.
LIGHTNING PROTECTION OF TRANSMISSION AND DISTRIBUTION LINES Team Members Eric Nelson, EE – Project LeaderDavid Dieterich, EE Tim Conrad, EE – Com. CoordinatorSam.
Cross-Country Sit Ski Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett.
Material Transfer Apparatus
Considering ASSISTIVE TECHNOLOGY in the IEP Process
Kart² Final Presentation
Expandable Wheelchair Final Report
Cross-Country Sit Ski Progress Report
الحد من المشاكل السلوكية في رياض الاطفال
Capstone Presentation Title (Template)
2007 PSU Human Powered Vehicle Team
Project Readiness Review P10029 – Air Muscle Artificial Limb
Ralph R. Alster, Architect
Design Brief in the design process.
Bioprocess Engineer NOS Functional Map v4
Final Status Update P09006 – Upper Extremity Exerciser
Final Project Plan P09004 – Eye Movement Tracking Device
Moonbuggy ME Capstone Design Project SP 2006
CITY OF INVER GROVE HEIGHTS Playground Safety
Chapter 10 EIN 6392, Fall 2009 Industrial Design
Engineering Design Process
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

TEAM ADAPTIVE REC Members Advisors Dale Calnek Jerel Hutapea Chang-Won Park Casey Radtke Academic: Dr. Sung Yi Industry: Jennifer Armbruster Todd Bauch Jennifer Sharp Jeff Stein Jesse Belter Sponsoring Company PSU Student Recreation Center -Adaptive Recreation and Community Services

Mission Statement Our team will design, fabricate, and install a lift that will allow a paraplegic person unassisted access to the spa in the student recreation center. This spa lift will provide simple push button control for the user, will address any aesthetic issues requested by the Inclusive Recreation Department, and their intended customers.

PDS: Adaptive Rec Requirements Major Minor Safety ‐ 300#/450# Portability - Tub Aesthetics Documentation Aesthetics Budget

Spa Environment Curb Width = 16” Curb Height = 19” Depth to Spa Seat = 26”

PDS: Adaptive Rec Requirements Major Minor Safety ‐ 300#/450# Portability - Tub Aesthetics Documentation Aesthetics Budget

PDS: Spa Lift Team Requirements Major Minor Engineering Simplicity - Design - Product Acquisition Cost Power

Design Selection Selection TopicExcavatorMan on a ClockZ-Rotator Safety 549 Maintenance 12 9 Mobility 8119 Budget 848 Engineering Simplicity 7410 Totals

Final Design Model

Tipping

FEA

Final Design Simulation

Final Design Evaluation of PDS requirement RequirementsGoal met Clearance of Spa Curb Maintenance Plan Documentation Spa Lift Mobility Unassisted Operation Must Fit Current Visual Aesthetics

Team Adaptive Rec Helping paraplegic Students and Faculty ADA Compliance in the Student Recreation Center “We are proud to provide equipment and programming that creates an inclusive environment and makes every effort to be accessible to all abilities. ” –Inclusive Rec