ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.

Slides:



Advertisements
Similar presentations
Chapter 18 Working Drawings.
Advertisements

An overview of the CERN CMMS
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
360 Panoramic Photographs Capture, Processing, Layout Database T. Birtwistle EN-MEF-DC.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Šenaj Lelic, Managing Director, oneAssist UG, and Visio MVP Visio 2010 in Real Business: Improving the Design Productivity of Your IT and Engineering Diagrams.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
1 User’s perspectives on the management of Elements Important for Safety (EIS) AMMW - CERN Anne Funken, Marc Tavlet / BE-ASR-SU.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
 SAP AG 2003 Customer Equipment Cards Service Contracts Service Calls Knowledge Base Solutions Contents: Service.
1 1. Some recent views ( ) 2 Linac tunnel
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
C. Parente (HL-LHC Technical Quality Officer) Date:
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Review of the processes released in the framework of the MMP Goran Perinić.
12.1 Plan Procurement: Introduction
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Project Codes/Coding Pierre Bonnal Project Codes/Coding — P. Bonnal2 Three to tango Agenda “as-is” “should-be” “to-be”
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
MMT Retreat Technical Services across ESS Peter Rådahl
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Test beam check list Michael JECKEL EN-EA-EC.
Preparation of functional/engineering specifications for HL-LHC
Vacuum Controls Quality Management
Interactive Factors in Manufacturing
Cryostat procurement, status and plan, QA/QC
Document Plan & Milestones WP7
Configuration Management and Layout Database ELENA Project
The ELENA Safety Documentation «time to prepare the safety clearance»
The MTF adjusted system to meet Vacuum Group needs
AMMS-WG BE-BI and PPE 9/12/2018.
How to explain positions, parts and assets to dummies?
Safety Readiness Review (SRR) Thomas Hansson, ESH
East Hall under construction
HL-LHC Quality management
Presentation transcript:

ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM

Contents Introduction Functional Positions (slots) Items Assets and Asset Management Document Templates Summary

Introduction 3 main aspects to consider when managing machine and facility data and documentation Functional Position (slots) – the location where a piece of equipment can be placed Item – the design of a particular piece of equipment (virtual) Asset – the physical equipment (real) Functional Positions Items Assets ITEMS vs. ASSETS DesignEquipment

Functional Positions (slots) The location where equipment is placed in a machine or facility Stores functional information The position on the beam line (‘s’ coordinate) etc. The logical layout of equipment is shown in the Layout Database The item and asset in each functional position (slot) can be displayed

Items The design of a particular piece of equipment (equipment type including variants) For example: Bending magnet - PXMBHEKCWP Electrostatic BPM type A – PXBPMEA001 Vacuum chamber – PXVCDCF001 Information related to the design of that specific type of equipment Engineering specifications, design drawings, procurement documentation etc. Test procedures, installation procedures, commissioning procedures etc.

Items Items can be created for each equipment type, and linked inside the Hardware Baseline in EDMS Hardware baseline should contain all long-term documentation (handled centrally by EN-ACE-CL) We can create items with input from equipment groups Define the correct access rights Groups can manage certain documentation in the items

Assets The physical equipment, handled in MTF/Infor EAM, and visible/editable in all interlinked applications (EAM Light, EDMS, TREC) – CMMS Support Information related to a specific (physical) piece of equipment Test reports, fabrication reports, non-conformity reports etc. Managed by the equipment group For example: Electrostatic deflector PXZDFA_001-CR Bending magnet PXMBHEKCWP-DA Serial number Manufacturer code Item code

Assets in EDMS Long term documentation (EN-ACE-CL) Design specific documents (incl. some hardware baseline documents also) Physical asset specific documents

Asset Documentation

Asset Details The CMMS team can assist with any workflows or asset management specificities

Asset Management Overview A CERN internal service with functionality spanning manufacturing, installation and reporting to financial analysis and radioactive measurements/waste

Functional Positions, Items and Assets ITEMS vs. ASSETS DesignEquipment Layout Database Link to Item Link to Asset in MTF Link to Layout Database MTF Link to the Asset Information

Document Templates Available at: Otherwise in MS Word – click ‘New’, ‘Shared’, ‘PS-Complex’, select the relevant ELENA template The Engineering Document template can be used for fabrication reports, test reports etc.

Summary Functional Positions Items Assets ITEMS vs. ASSETS DesignEquipment Asset Test Report Test Procedure - Engineering Specs - Design Drawings - Test Procedures - Commissioning Procedures - Procurement Documents - Test Reports - Non-conformity Reports - Functional Data - Beam Position

Summary EDMS and MTF/Infor EAM are used extensively to manage equipment and its documentation Contact us for help creating items and assets Thomas Birtwistle – items, functional positions, naming Tsvetelin Krastev – assets, MTF/Infor EAM Questions