LINAC3 UPGRADE Strategy for the hardware modification of the GTS-LHC 18/3/2015 Ville Toivanen.

Slides:



Advertisements
Similar presentations
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
Advertisements

JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
Applications of Vacuum Technology in the NIF Laser System
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
1 Losses in the Cooling Channel Malcolm Ellis PID Meeting 1 st March 2005.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
BSRT Optics Design BI Days 24 th November 2011 Aurélie Rabiller BE-BI-PM.
Compressor status AWAKE Technical Board meeting 19 May 2015.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Electron Cooling Expected Performance & Construction.
Carbon Injector for FFAG
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
Lab Course: Ion Sources Larry Lamm Research Professor Technical Director of the NSL Winter 2008.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
LBNL 88'' cyclotron operations Status of the 88-Inch Cyclotron High-Voltage upgrade project December 14, 2009 Ken Yoshiki Franzen.
Calculation of the beam dynamics of RIKEN AVF Cyclotron E.E. Perepelkin JINR, Dubna 4 March 2008.
Lesson learned in Linac Commissioning Here I introduce 3 kinds of beam loss generated by following issues 1.Intra beam stripping (IBSt) in ACS 2.Dark.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
experiences of Ion Source commissioning at CEA Saclay
OVEN TEST STAND 17/9/2014 Ville Toivanen. Introduction Test stand for the development of Linac3 GTS-LHC ion source micro oven (used for Pb beam production)
RF source, volume and caesiated extraction simulations (e-dump)
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber.
WU2 - Proton Source Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
Developments of the FETS Ion Source Scott Lawrie.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
Beam Measurements After the Sources at the Ion Source Test Stand Including H 2, N 2 and Kr Gas Injection R Scrivens, Linac 4 10/04/2014 Lots of input from.
Stripline Beam Position Monitors for the High Luminosity LHC D. Draskovic, T Lefevre CERN, BE-BI-QP.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
NATIONAL INSTITUTE OF NUCLEAR PHYSICS Legnaro National Laboratories Numerical simulation strategy for the SPES FEBIAD ion source INFN – CISAS collaboration.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
RAON LEBT Design Yonghwan Kim Institute for Basic Science Yonghwan Kim Institute for Basic Science.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
The 12th Symposium on Accelerator Physics, Yuzhong, Gansu, China1 Study of Beam Properties at SECRAL and The Solenoid Pre-focusing LEBT Youjin.
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
MICE Spectrometer Solenoids Step IV running
MICE Step IV Lattice Design Based on Genetic Algorithm Optimizations
Study of Beam Properties at SECRAL and The Solenoid Pre-focusing LEBT
A. Martynov on behalf of accelerator division.
Possible causes for SPS ZS2 misalignment
LINAC 4 source & LEBT measurement results
How to run ions in the future?
PANDA Collaboration Meeting
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Magnetized Bunched Electron Beam from DC High Voltage Photogun
R. Suleiman and M. Poelker September 29, 2016
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Summary & Concluding remarks
Physics Design on Injector I
Ion Source and LEBT control system topology, Interlock strategy
ISRC and LEBT Vacuum System Design
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Presentation transcript:

LINAC3 UPGRADE Strategy for the hardware modification of the GTS-LHC 18/3/2015 Ville Toivanen

Motivation for GTS-LHC modifications Strongly divergent beams is an inherent property of the current GTS-LHC extraction system when operated in afterglow mode – leads to significant initial beam losses Pb beam SOLENOID Pb 29+ simulated transmission ~ 38%

The proposed hardware modifications A new pumping chamber to allow the modifications Increased downstream branch bore Redesign of the upstream branch (einzel support) New port for einzel lens HV input A new beam pipe with increased bore size through the first beam line solenoid From 65 mm to 100 mm Solenoid bore is 110 mm Mitigates beam losses before the first solenoid Allows more flexible operation of the GTS-LHC extraction system A new focusing element in the extraction system An electrostatic einzel lens and support structures Downstream from the existing electrodes Mitigates beam losses by decreasing the beam divergence and size Normal beam delivery not critically dependent on modifications HIGH potential and LOW risk upgrade

Ions schedule

Proposed schedule Based on technical meeting held on 11/3/2015 Present: Didier Steyaert, Pierre Moyret, Alice Michet, Detlef Küchler, Ville Toivanen Time requirements set for mechanical design and manufacturing Adjusted to allow installation in the first quarter of 2016 First deadline: Optical design, end of May 2015 Einzel lens geometry definition with extraction simulations Simulation study to define LEBT transmission and beam matching to the RFQ with the modifications

ADDITIONAL SLIDES

GTS-LHC extraction system Intermediate electrode Plasma electrode Ground electrode Plasma chamber Ref.: LICNFIEA0001 Extraction pumping chamber

Extraction electrodes Beam Plasma Plasma electrode (+V) Intermediate electrode (-V) Ground electrode (GND)

Bigger beam pipes: pumping chamber Ref.: LICNFIEA0001 New pumping chamber with larger bore (100 mm instead of 65 mm) outlet branch for beam Modified for lens support

Bigger beam pipes: LEBT GTS-LHC (pumping chamber) 1 st diagnostics chamber Spectrometer Ref.: LICLM___ SOL1 Larger bore (100 mm) beam pipe through SOL1 100

New einzel lens inside pumping chamber Beam Plasma GTS extraction system An example: GTS extraction system with iThemba LABS einzel lens

New einzel lens inside pumping chamber Intermediate electrode Plasma electrode Ground electrode Plasma chamber Ref.: LICNFIEA0001 iThemba einzel

New einzel lens inside pumping chamber Intermediate electrode Plasma electrode Ground electrode Plasma chamber Ref.: LICNFIEA0001 New einzel lens design better optimized for GTS-LHC (ongoing)