T. Fleck, GSI, Darmstadt, Germany ICALEPCS 2007 16.10.2007 Status of the Control System for HICAT at an advanced stage of Commissioning Functions, Restrictions.

Slides:



Advertisements
Similar presentations
Heavy Ion Cancer Therapy
Advertisements

Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
Ribbon Electron Beam Profile Monitor For Bunched Beam Tomography Muons, Inc. Innovation in research.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
Radiotherapy Quality Assurance
PAMELA Contact Author: CONFORM is an RCUK-funded Basic Technology Programme PAMELA: Concepts Particle Accelerator for MEdicaL Applications K.Peach(JAI,
Heavy Ion Tumor Therapy
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
4.0 Accelerator Physics & Pre-operations (1.10) Phil Martin, Stan Ecklund, Rick Baartman & Peter Limon 4.1Accelerator Physics Findings The hot spare.
MedAustron Beam Intercepting Devices BID Workpackage Review 15 March R. Folch EN/STI - BID Workpackage Review - March 2012 Speakers: Ramon.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
ProShell Procedure Framework Status MedAustron Control System Week 3 December 8 th, 2010 Roland Moser PR a-RMO, December 8 th, 2010 Roland Moser.
FAIR Accelerator Controls Strategy
The Virtual Accelerator Allocator Status PR a-CTM, December 8 th, 2010 Cesar Torcato de Matos 1 R. Gutleber.
Michael GalonskaWAO ´12, August Five years of operation at HIT Daily Performance Check & Beam Time Statistics M. Galonska, S. Scheloske, R. Cee,
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Center for Devices and Radiological Health U. S. Department of Health and Human Services Paul L. Jones Senior Systems/Software Engineer Division of Electrical.
FFAG F ixed F ield A lternating G radient Synchrotrons A new type of particle accelerator - with a wide variety of applications Cancer Therapy and UK Activities.
Physics of carbon ions and principles of beam scanning G. Kraft Biophysik, GSI, Darmstadt, Germany PTCOG43 Educational Satellite Meeting: Principles of.
TPS & Simulations within PARTNER D. Bertrand, D. Prieels Valencia, SPAIN 19 JUNE 2009.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
How can remote operations become more resilient? Siri Andersen - DNV Energy Stig Ole Johnsen - SINTEF.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
ProShell Procedure Framework Status MedAustron Control System Week 2 October 7 th, 2010 Roland Moser PR a-RMO, October 7 th, 2010 Roland Moser 1.
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Information And Communication in Operation At GSI Uwe Scheeler operation department GSI Helmholtzzentrum Darmstadt Germany.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
On behalf of the whole MedAustron Therapy Accelerator Division
Development of a superconducting rotating-gantry for carbon therapy
Hartmut Eickhoff, GSI 1 Developments in Hadrontherapy -the role of Basic Research Institutes H. Eickhoff GSI/Darmstadt.
The Australian Hadron Therapy and Research Facility.
Current Status of Web Application for RIBF Accelerator
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
O. Kester, NuSTAR annual meeting, 27/02/2013
Michael GalonskaWAO ´14, October Data supply of accelerator devices Data management of device process data at a medical accelerator from an operator´s.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
Research and Practical Conference “Accelerators and Radiation technologies for the Futures of Russia” September 2012, Saint-Petersburg Proton Radiation.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
April 17, Dejan TrbojevicFFAG07 -Non-Scaling FFAG gantries1 Non-Scaling FFAG Gantries Introduction: Motives: The most challenging problem in the carbon/proton.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Preparation Phase of the FAIR Project
Precision Tests of Fundamental Interactions with Ion Trap Experiments
NICA injection complex status
CESR Vacuum System Monitoring and Component Quality Assurance
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
Linac Commissioning Overview
How to run ions in the future?
Design of a PET-isotope-based hadron therapy facility
The EPICS running envirionments in the five accelerator projects
European Spallation Neutron Source ESNS
Timing System GSI R. Bär / U. Krause 15. Feb. 2008
(Beam) Commissioning Plan
Charge and Agenda of the 18th TAC meeting
Presentation transcript:

T. Fleck, GSI, Darmstadt, Germany ICALEPCS Status of the Control System for HICAT at an advanced stage of Commissioning Functions, Restrictions and Experiences T. Fleck GSI 16. October 2007

T. Fleck, GSI, Darmstadt, Germany ICALEPCS CONTENT 1.DESCRIPTION OF THE FACILITY 2.DESCRIPTION OF THE ACCELERATOR 3.STATUS OF COMMISSIONING 4.FUNCTIONS 5.RESTRICTIONS 6.EXPERIENCES

T. Fleck, GSI, Darmstadt, Germany ICALEPCS HICAT FACILITY General Conditions Part of the clinic in Heidelberg 1300 patients/year High reliability and stability Term of 25 years Only two operators First combined proton / heavy ion therapy device in Europe operated by a hospital Two horizontal treatment rooms Target room for medical research Rotatable gantry structure

T. Fleck, GSI, Darmstadt, Germany ICALEPCS HICAT FACILITY Patient Treatment Only device using intensity-controlled raster scan method Different ions, energies up to 430MeV/u 250 energies, 6 foci, 15 intensities (EFI)  LIBC (List of Ion Beam Characteristics) Key Aspects Control System Part of a medical product (MDD) 500 components µs timing Pulse-to-pulse variation Modes for commissioning / QA / therapy Interface to therapy CS

T. Fleck, GSI, Darmstadt, Germany ICALEPCS ACCELERATOR Ion Sources Linac Synchrotron horizontal treatment rooms Gantry treatment room QA / medical research MEBT LEBT HEBT Gantry

T. Fleck, GSI, Darmstadt, Germany ICALEPCS CONTROL SYSTEM Design and functional specifications from GSI Realization by an industrial partner (could decide about implementation) Commissioning by GSI Handing over to operation company (HIT) by GSI CS briefing by industrial partner Implementation: OS Windows XP / RTX Oracle Database TCP/IP based communication Real-time bus for µs-timing Special device control units C++ and Delphi (GUIs)

T. Fleck, GSI, Darmstadt, Germany ICALEPCS CONTROL SYSTEM Device Control Units designed as standard for all beam guiding devices 64 MB RAM / 32 MB flash FPGA for real-time control (100 MHz) 7 device classes / interchangeable Special timing master DCU Special DCUs with interface to the therapy control system for e.g. fast beam cutoff Beam Diagnostic Devices NI PXI systems Trigger pulses provided by special DCUs Further Systems Ion sources rf generators Vacuum CS Personal safety system

T. Fleck, GSI, Darmstadt, Germany ICALEPCS STATUS OF COMMISSIONING Commissioning for horizontal treatment rooms almost finished: Verified device settings for protons / carbon ions Beam properties meet therapy requirements for most EFI-combinations Beam requests by therapy control system Integration of all devices finished First ion beam in gantry within next few weeks Commissioning shifts: GSI / SAG (24/6), HIT-support

T. Fleck, GSI, Darmstadt, Germany ICALEPCS FUNCTIONS Virtual Accelerators Device settings and/or control of all necessary elements  Experimental VAccs  Therapy VAccs including all EFI parameters Device Settings for Therapy VAccs EFI dependencies have to be considered Interpolation of whole EFI parameter space necessary Persistent storage of device settings

T. Fleck, GSI, Darmstadt, Germany ICALEPCS FUNCTIONS Beam Requests / Operation Modes (10 Hz Stability cycles) 5 Hz Linac mode Pulse to pulse variation of - Beam parameters (EFI) - Source-target combination Procedures for QA Therapy control system (safe patient mode) Measurement / Verification Online Data visualization during cycle (magnets / beam diagnostic) Snapshot data of all components Storage of snapshot data

T. Fleck, GSI, Darmstadt, Germany ICALEPCS FUNCTIONS Device Control Program and Therapy Protocol Function

T. Fleck, GSI, Darmstadt, Germany ICALEPCS FUNCTIONS Calculation of Device Settings and Verification

T. Fleck, GSI, Darmstadt, Germany ICALEPCS FUNCTIONS Online Data and Logged History Data

T. Fleck, GSI, Darmstadt, Germany ICALEPCS RESTRICTIONS Present Restrictions No read values outside accelerator cycles Standby mode has to be implemented Control of dipoles zero magnetic field Integration of e.g. cooling water temperature monitoring No real parallel operation of ion sources Common look and feel (Application programs still prototypes)

T. Fleck, GSI, Darmstadt, Germany ICALEPCS EXPERIENCES Major problems during commissioning: Time schedule (6 months delay of CS functionality) Lacking time for extended CS tests Bottleneck for beam diagnostic data Performance and stability Complexity of EFI dependencies Implementation of automated procedures / therapy protocols Only few CS experts Additional requirements came up On-site CS support by industrial partner necessary Remote login and experts on call important User aspects need high priority Industrial partner: high flexibility / short reaction time / good cooperation

T. Fleck, GSI, Darmstadt, Germany ICALEPCS Heidelberger-Ionenstrahlen- Therapie-HIT html Thanks for your attention Further details / discussion: poster presentations TBBP39 and RPPB29