C1 Sys. on Sys. off C1 A Sys. on Sys. ok Temp. Control PT1000 HP. err LP. err LP HP Hygro. Extern Compres. Control Comp. C2 Pump Pump on/off Service v.

Slides:



Advertisements
Similar presentations
Wall Mounted J series Troubleshooting.
Advertisements

Air and Water Chiller Basic Class
TIS Climate Control Course 20 Minutes Test 10 Minutes TIS Training Program 2012, Rev 1.1
MEGA FUSE Junction Block Positive Battery Cable Pre 07
Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
TROUBLESHOOTING. 5WSS TROUBLESHOOTING ERROR CODEFAULTY INDICATION E1ROOM SENSOR CONTACT LOOSE E2INDOOR COIL SENSOR CONTACT LOOSE E3WATER OUTLET SENSOR.
Panasonic Expérience Leadership in Japon : CO2 Models Most famous manufacturer of compressor in the world(high technology of inverter) High experience.
 1) The front coach lights are controlled by the photo switch.  2) Water heater breaker is labeled.
Filter manifold Holding tank Iron- manganese filter Aeration tank Control unit Pre- filter To storage tanks Backwash overflow SO2 vent Bypass Cutoff valve.
TECHNICAL TRAINING 2008.
Solar Charge Controller With Dump Load Circuit Built By Matt Smyrski.
Hydraulic Power Units Eric Bornemann Fall Power Unit Basics Uses Uses Open and closed center systems Open and closed center systems Parts Parts-Pump.
Air Cooled Inverter Chiller
Engine Compartment Left Side. Oil-to-Fuel Heat Exchanger.
R. Rucinski, Fermilab Feb. 9, 2005 Project Status 2 cassette VLPC Cryostat Russ Rucinski - Fermilab This presentation will probably involve audience discussion,
Air conditioning – Refreshes your life Mini-Chiller Applied Systems Sales1 EWA(Y)Q-AAV3P Residential Mini-Chiller Heating EWAQ - AA3VP EWYQ - AAV3P Cooling.
Amp air conditioning limited tel: fax: AMP – MHI SAF Heater Kits DescriptionPart NumberList Price SAF Heater.
39M-49M BOOM CAB INSTALL NEW 39M-49M BOOM CAB INSTALL PRE 2008 NOTE: Remove panel from MACK truck to modify as shown. Find # Parts switch.
Alan Hinton March, 2006 Slide 1 NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS.
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
Hydraulic Kit (pump and tank) Pictures from prototype.
TECHNICAL TRAINING 2008.
Chiller Panel Controller. Objectives What is the Features of Chiller Panel Controller What is the Features of Chiller Panel Controller How to use Chiller.
Description of various components/sub-assemblies.
FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
PLC Based sequential batch process CONTROL system
Keeps heat indoors in winter and outdoors in summer – means lower heating and cooling bills Rated by it’s R-value. The greater the R- value the better.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
CUE – Make Any Pump an E-Pump
the compact air control solution
BasicRefrigerationSystem 4 Component Flow Diagram.
60kW Thermosiphon control system
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Ref: P.ppt (06/03/2016) 1 EUROTHERM CONTROLS 2704 Vacuum Block.
Liquid xenon cryogenic system at KEK. LXe cryogenic system at KEK Xe cylinder Recovery Bottle(3.75L) SAES Getter Monotor 0.75m 3 Tank Circulation Pump.
Cryogenic refrigeration for the XFEL facility. Current status of the commissioning. Wilhelm Hanspeter Grenoble, June 4th, 2015.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Spare Parts Catalog 2013 Published February 7 th 2013 Crosspoint Solutions, 5511 W. 79 th St. Indianapolis, IN
Planning The Electrical System  Safe means for the entrance of electrical supply into a building  Means of disconnecting all electrical power in a building.
Standard Electric No Hot Water. PART#: ELECTRICAL TEST KIT.
Overall Main Components [Electric Power Path] : AC : DC
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Service Section Technical Training. Sequential Controller SQ 1.0.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
E3 HVACR Controls and Devices
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
delivered with the compressor
E1 – Electrical Fundamentals
IT-4189 Supply and installation of a cryogenic distribution system
Electrical and Controls
FIGURE 9-1 The main parts of a vehicle’s heating system are the heater core, blower, heater hoses, and, in some cases, heater valve. (Courtesy of Everco.
E3 HVACR Controls and Devices
LP Feedwater Heater Tube Failure Point Beach Nuclear Plant
Types of heaters: Electric
352MHz Klystron Control for the 3MeV Linac test stand
10TR Nominal Glycol Chiller
One Line Diagram Example
Cryogenic Plant Controls – Safety Switches

MEGA Abrasive Cutter motor and pump wiring

!'!!. = pt >pt > \ ___,..___,..
Cryogenics – The Basics
Panel Detailed Design 12” L R Bottom (21.75 x 16.5) A1 platform
For More Details:
Topic 8: Charges and Circuits Electric Power, Costs and More
(or external generator)
Presentation transcript:

C1 Sys. on Sys. off C1 A Sys. on Sys. ok Temp. Control PT1000 HP. err LP. err LP HP Hygro. Extern Compres. Control Comp. C2 Pump Pump on/off Service v. on/off Drain valve Coolsystem SCT production site Gnd Gnd-0-R-S-T Gnd Gnd Trafo Br Blu Y/gre Br Blu Y/gre L1-L2-L3 T1-T2-T3 L1-L2-L3 T1-T2-T3 A1 A2 A1 A2 Heater Copeland Compressor DLLP40X EWL 380V – 9,5 Amp Speck pump NP10/ V - 0,55Kw Control Box See detail Control Box detail To 8 To L N PTC Fuse 1 Amp Control Box detail SCT Cooling Compressor PdG coolsys2pdg

Cable clamps & Temp controller Gnd 0 Main R S T U Compressor V W U Pump V W LP Pressostaat LP HP Pressostaat HP Hygro Valve Compr. Interlock Pwr Hygro Compr. Interlock SCT Cooling Compressor PdG Temp. Control PT1000 Heater Trafo 24V NTC 220V coolsys2pdg

Front panel Temp Control. On Off W. pump Valve SCT Cooling Compressor PdG coolsys2pdg