2006 CDR Status Report Technical Advisory Committee May 4, 2006 Bill Bojorquez.

Slides:



Advertisements
Similar presentations
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
06/04/2009 TAC 2009 Long-term Demand and Energy Forecast (LTDEF) and Capacity, Demand and Reserves (CDR) Calculation Dan Woodfin Director, System Planning.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
ERCOT Emergency Load Response Sam Jones Paul Wattles Steve Krein PUC Demand Response Workshop Sept. 15, 2006.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
IMO 18-Month Outlook Presentation to the F&ASC June 25, 2003.
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
NERC LTRA Update / CDR Capacity Counting Issues
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Big Sandy Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August 16,
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
1 ERCOT 2007 Strategic Financial Plan & Budget Proposal _____________________ Board of Directors November 14, 2006.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
Generation Adequacy Task Force Update to WMS September 14, 2011.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Florida’s Electric Capacity and Fuel Needs Presentation by: James Dean Florida Public Service Commission to the: House Utilities and Telecommunications.
Resource Adequacy Technical Committee Meeting April 6, 2011.
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
Generation Adequacy Task Force Update to WMS November 18, 2009.
02/13/2009 RPG Wind Interconnection Survey Dan Woodfin Director, System Planning.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
1 TAC Report to the ERCOT Board February 16, 2005.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
System Operations Report To The Board Of Directors September 21, 2004 Sam Jones, COO.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
1 WMS Report TO TAC April 2007 (which is in March)
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
1 With the increase in solar and wind generation we would like to stream line the process Currently TDSPS are required to send ERCOT ESI ID Generation.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
LOLEv Methodology Details GATF April 5, Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Generation Adequacy Task Force Meeting April 10, 2014.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Distributed Renewable Generation Profiling Methodology ERCOT Load Profiling March 4, 2008.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
Status Report on 2007–2016 Long-Term Reliability Assessment Mark Lauby August 16, 2007.
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
RPG - 10/12/2007 Competitive Renewable Energy Zones (CREZ) Update Bill Bojorquez Vice President, System Planning.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
ERCOT Update on UFLS Annual Survey with TSP/DSP Gene Lowrie Reliability & Compliance Eng Sr. July 2016.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
ERCOT 2011 Five-Year Transmission Plan Update
Director, Transmission Services
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Generation Adequacy Task Force Update to WMS
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August.
Technical Committee Meeting March 18, 2016
Presentation transcript:

2006 CDR Status Report Technical Advisory Committee May 4, 2006 Bill Bojorquez

2 CDR Status Report to Technical Advisory Committee--May 4, 2006 Major Assumptions Checklist  Load Forecasts  LAARs  Existing Resources  Mothballed Units  Private Networks  New Generation (with concerns) In order to adequately prepare the CDR, ERCOT planners must compile the best information available with regards to forecasted load demands and available resources. To date, ERCOT planners have addressed: Load Forecasts Peak Demand -LARRs Resource Forecast Existing -Retired/Mothballed +Private +New Available Resources -Firm Load Reserves CDR Firm Load Available Resources

3 CDR Status Report to Technical Advisory Committee--May 4, 2006 New Generation Illustration The table below contains a partial list of the publicly announced new generation (fossil fuel only) projects compiled by ERCOT staff. Site NameStatusCountyRegionFuelIn Service Date MW into Grid Cobisa-GreenvillePublic LetterHuntNorthGasMay-081,750 Colorado Bend Energy Center Interconnect Agreement WhartonSouthGasDec Quail Run Energy Center Interconnect Agreement EctorWestGasDec Limestone Upgrade Interconnect Agreement LimestoneNorthCoalMay Big Spring Electricity Generating Facility Interconnect Agreement HowardWestWaste Heat Apr-0612 Sandow 5Public LetterMilamNorthCoalJul-080 Sandy CreekPublic LetterMcLennanNorthCoalJul J K Spruce 2Public LetterBexarSouthCoalAug Oak GrovePublic LetterRobertsonNorthCoalMar-091,660 Hugo PlantPublic LetterChoctaw, OKNorthCoalDec Twin Oaks 3Public LetterRobertsonNorthCoalJun Totals:6,762 As shown in the table, only 672 MW of publicly announced capacity has an executed Interconnection Agreement at this time.

4 CDR Status Report to Technical Advisory Committee--May 4, 2006 Treatment of New Generation in CDR (Example) Assuming a Firm Peak Demand forecast of 67,000 MW for summer 2011:  The total list of new fossil resources (6,762 MW) provided in the preceding table represents an incremental reserve margin of 10.1%.  However, current ERCOT practice is to include only those projects with an executed Interconnection Agreement (672 MW) in the CDR; which in this example represents an incremental reserve margin of only 1.0%.  Only projects with signed IAs are included in transmission base cases Use of these two methodologies results in extreme outcomes: 1.0% 10.1%.

5 CDR Status Report to Technical Advisory Committee--May 4, 2006 Next Step ERCOT System Planning is requesting that TAC assign the GATF to work with ERCOT staff in determining the most appropriate methodology for the treatment of new generation projects in the CDR calculation.

Questions?