Sub-basin Management Plans for the Freshwater Pearl Mussel Dr E. Sides, J Ryan, Dr A O’Connor, Dr Colin Byrne Department of Environment, Heritage and Local.

Slides:



Advertisements
Similar presentations
NGO work with the implementation of the Water Framework Directive in Finland Hannele Ahponen Water project coordinator Finnish Association for Nature Conservation.
Advertisements

Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 2: Water Framework Directive.
Marine Strategy Framework Directive: Goals and Challenges
Wrap up and next steps. Remit of Water Forum To enable stakeholders to engage & influence statutory authorities in implementation of WFD To help ensure.
1 What happens next? November Contents WFD timetable & consultations The River Basin Management Planning Process Applying classification Making.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 1: Roles, Responsibility and Legislation Muckno Mill Lough.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Draft River Basin Management Plan Workshop Freshwater Pearl Mussel December 2008.
PP 7.1 THE ROLE OF BASIN PLANNERS. The Roles of Basin planners Basin planners have three main roles:  Bringing together knowledge  Identifying stakeholders;
Wet Woodlands and the Water Framework Directive Ben Bunting, South West River Basin Programme Manager.
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
Water.europa.eu Assessment of the River Basin Management Plans – preliminary findings Conference on River Basin Management Planning Ankara, 28 February.
Characterization Report Module 2: Water Budget, Pressures and Impacts, Significant Water Management Issues, Monitoring, Characterization Report Characterization.
Final Conference June Maastricht, The Netherlands 1 Case Study: Kłodnica catchment, (Odra river basin) Poland Janusz Krupanek Institut for Ecology.
EU Water Policy Sustainable water management for generations to come.
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
CSC 6 February 2008 The Don Catchment as an Opportunity Facilitating Answers to ICM Dr. Jonathan Hillman.
Hydropower and the Water Environment Peter Gammeltoft European Commission DG Environment, D.1 Water 2nd Workshop on Water Management, WFD & Hydropower.
18-Nov-15 / 1 Strategic planning for hydropower in the Danube Sergiy Moroz WWF European Hydropower Summit, Bucharest 28 February 2012 Water and energy.
European Commission, DG Environment, Nature Unit
EXPERIENCE IN PREPARING THE FLOOD RISK MANAGEMENT PLAN IN AUSTRIA CLEMENS NEUHOLD FEDERAL MINISTRY OF AGRICULTURE, FORESTRY, ENVIRONMENT AND WATER MANAGEMENT.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
Water Framework Directive Implementation and Risk Analysis John Sadlier Water Quality Section.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Management of the coastal and marine environment: The legal framework of the European Union from the first EEC Directives to the Water Framework Directive.
Lessons learned from public consultation under WFD and proposed recommendations for the future Dr Claire Cockerill WWF Northern Ireland.
Stela Barova, senior expert, “Marine environmental protection and Monitoring” Department, “Plans and Permits” Directorate State of play of MSFD implementation.
1 Nature conservation policy Workshop: Biodiversity and Water - Links between EU nature and water legislation June 2010 Stefan Leiner Acting Head.
Connectivity between protected areas as an adaptation strategy for biodiversity conservation An Cliquet - Ghent University Kris Decleer – Research Institute.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
WHY IS INTEGRATED RIVER BASIN PLANNING IMPORTANT? Module 1 pp 1.1.
Framework for Water Management – challenges at national/local and trans-boundary scale Water Framework Directive implementation Gordana Kozhuharova, REC,
The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator June 2017.
Environmental Services Training Group
STATUS OF LAKE VICTORIA ENVIRONMENTAL MANAGEMENT PROJECT II
Áine O Connor National Parks and Wildlife Service Ireland
Environmental Services Training Group
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
EU Water framework The best practice in Germany
National Environment Policy Presentation
The Natura 2000 Biogeographical Process
Workshop with the 8 PAF related Proposals & the Habitats Committee
The EU WATER POLICY.
The Habitats Directive and the Water Framework Directive
A new financial instrument
Water and Marine Directors meeting Spa, 2-3 December 2010
Swedish Environmental Protection Agency
1. Implementation of the Water Framework Directive: notifications & infringements, RBMP assessments for the agricultural sector Expert Group on WFD & agriculture.
River Basin Planning & Flood Risk Management in Scotland
DG Environment, Nature Protection Unit (D3)
Preparing a River Basin Management Plan WFD Characterisation Manager
The Common Agricultural Policy and the Water Framework Directive
22nd WG D Meeting, 15/4/2012 Jacques Delsalle, European Commission
Natural water Retention Measures
LIFE and the implementation of the Water Framework Directive
A Blueprint to safeguard Europe’s waters
Meeting of the Water Directors - Athens, 17/18 June 2003
LIFE and the implementation of the Water Framework Directive
Strong needs for coordination at EU level
Meeting of the WFD Strategic Co-ordination Group 11 March 2009
Towards integrated environmental policy for the marine environment
DG Environment, Unit D.2 Marine Environment and Water Industry
Natural Water Retention Measures
Frequently asked questions Part II: Coordination of monitoring under WFD and BHD Workshop: Biodiversity and Water - Links between EU nature and water.
NGOs expectations for next WFD cycle
Frequently asked questions Part I: Objectives and differences in scope of the WFD and BHD Workshop: Biodiversity and Water - Links between EU nature and.
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

Sub-basin Management Plans for the Freshwater Pearl Mussel Dr E. Sides, J Ryan, Dr A O’Connor, Dr Colin Byrne Department of Environment, Heritage and Local Government, Ireland

Links Between WFD and HD WFD Directive ( Art 4, 6 & Annex IV) provide a direct link between Directives Irish legislation* requires: – that a water body can only achieve Moderate WFD status if FCS of a protected habitat or species is not met due to water quality / quantity –sub-basin plans for the Freshwater Pearl Mussel *Statutory Instrument 272 of 2009 Statutory Instrument 296 of 2009

Freshwater Pearl Mussel

The Freshwater Pearl Mussel Very long lived – years Have a complex life cycle: –Juveniles spend about 9 months on the gills of Salmonid fish before dropping off into the sediment –Juveniles live buried in the sediment for 5+ years before emerging to join the adult population Juveniles require clean sand / gravel In Unfavourable / Bad Conservation Status

Freshwater pearl mussel SAC catchments

Ownagappul catchment

Aerial photographs of two SAC catchments Bundorragha Derreen

Owenriff

Kerry Blackwater

Munster Blackwater

Synergies To reach favourable conservation status –many HD water dependant habitats and species require a minimum of water at Good Status under WFD e.g. Naturally eutrophic lakes –But some require greater than Good Status e.g. the Freshwater Pearl Mussel Oligotrophic lakes

Synergies RBD Plans ensure that general environmental water conditions are maintained / improved HD Sub basin plans refine / focus / extend RBD plans to achieve HD specific requirements for Habitats / Species Identification and Integration of HD requirements helped to focus prioritisation of RBD POMs e.g. –19 waste water treatment plant (WWTP) upgrades

Synergies RBD Plans require all stakeholders involvement to; –Develop the plans –Implement the plans For SACs no mechanism existed to involve stakeholders at a catchment level The RBD structure facilitated stakeholder input into the FPM sub basin plans

Synergies Monitoring the FPM conservation status for the sub- basin plan has: – encouraged use / adaptation of standard WFD monitoring tools for HD purposes –led to close co-operation in the co-ordination and rationalisation of monitoring for each Directive

The Problems The lack of policy integration HD requirements into sectoral activities –e.g. in agriculture, forestry, planning Convincing sectors to look at activities at a catchment level Stakeholder concern about potential future restrictive measures –e.g. forestry and agriculture The availability of resources and ensuring that they are used most effectively

The two most important FAQs 5.2 How can River Basin Management Plans (WFD) and conservation measures / management plans of Birds /Habitats Directives be linked? 3.3 What is the relationship of good ecological status of WFD and favourable conservation status of BHD?

Further policy and guidance needs Policy –Improved integration across Government Departments/Sections of WFD /HD requirements into e.g. agriculture/forestry and planning –for controlling activities outside planning laws e.g. small scale land clearance, farm drains etc Guidance required. e.g. –best practice for the reduction of impacts e.g. agriculture, water discharges and abstractions (This should also be viewed as a synergy) Stakeholder awareness

Conclusions Protection of the freshwater pearl mussel requires a catchment perspective which is only possible through the WFD The identification of catchment wide measures required for FPM has integrated the HD into main stream land use planning The sub basin plans have highlighted the practical difficulties of saving small populations in catchments with high intensity land use and –this helps to optimise the use of resources to achieve the objectives of the HD

Acknowledgements –My co authors –Colleagues in other sections of my Department –National Conservation Working Group –RPS consultants and associates Thank You