Oncology Patient Enrollment Network OPEN Quality Assurance Lucille Patrichuk OPEN Implementation Manager OPEN Conference September 18, 2008.

Slides:



Advertisements
Similar presentations
Ways to Improve the Hazard Management Process
Advertisements

Tips to a Successful Monitoring Visit
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Data Quality Considerations
Checking & Corrective Action
Fiscal Monitoring Fiscal Monitoring. Agenda I. Fiscal Monitoring I. Fiscal Monitoring II. Follow-up II. Follow-up III. Correction Action Plan III. Correction.
EDRN’s Validation Study Information Management System Developed for EDRN by the DMCC Cancer Biomarkers Group Division of Cancer Prevention Jet Propulsion.
Future Compliance How do you maintain accuracy of eligible dependents as an ongoing process?
MONITORING DIFFERENT TYPES OF TRIALS. BY OGUNDOKUN OLUSEGUN BIOMEDICAL SCIENTIST / CLINICAL RESEARCH PROFESSIONAL BMLS (LAUTECH), PGD (Clin. Research.
Guideline for Monitoring of Clinical Trials for Cooperative Groups, CCOP Research Bases, and the Clinical Trials Support Unit (CTSU) Lore Lagrone Program.
Establish Verification Procedures (Task 11 / Principle 6)
EMS Auditing Definitions
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Tipologie di Audit e loro caratteristiche Riunione sottogruppo GCP-GIQAR 21 Marzo 2006 Francesca Bucchi.
PMI Inventory Tracker™
Clinical Pharmacy’s Role in Research Trials Sheree Miller Pharm.D. Investigational Drug Service University of Washington Medical Center.
Integrated Online Research Compliance System (iORC)
QA/QC FOR ENVIRONMENTAL MEASUREMENT
Privacy By Design Sample Use Case Privacy Controls Insurance Application- Vehicle Data.
E-rate Audits/Reviews Be prepared!! Prepared by Judy Jones, State Library of Iowa.
Today’s Lecture application controls audit methodology.
ACRIN 6698 Diffusion-weighted MRI Biomarkers for Assessment of Breast Cancer Response to Neoadjuvant Treatment: An I-SPY 2 Trial Substudy Presented by:
ArtClinica Address: 1175 Marlkress Rd, #2632, Cherry Hill, NJ 08034, USAPhone: Fax: ARTClinica.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Rural Health Network Development Data Submission Overview Jonathan Gardner.
November 27, 2007Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
Elements of Clinical Trial Quality Assurance Regulatory Coordinator –SCTR SUCCESS Center QA Monitor – NIDA Clinical Trials Network Stephanie Gentilin,
Role of the Oncology Research Team Carmen B. Jacobs, RN, OCN, CCRP.
MODULE I Close-Out Visit/Monitoring Reports Jane Fendl April 24, Versions: Final 24-Apr-2010.
Verification: Quality Assurance in Assessment Verification is the main quality assurance process associated with assessment systems and practice - whether.
Common Audit Findings UTHSC Institutional Review Board (IRB)
Joint Research & Enterprise Office Training The team, the procedures, the monitor and the Sponsor Lucy H H Parker Clinical Research Governance Manager.
Monitoring IRB Monitoring of Clinical Trials. Types of Monitoring Internally Internally Externally Externally.
CLINICAL TRIALS – PHASE III. What are phase III trials  Confirmatory phase (Therapeutic confirmatory trial)  Trials are done to obtain sufficient evidence.
Meet and Confer Rule 26(f) of the Federal Rules of Civil Procedure states that “parties must confer as soon as practicable - and in any event at least.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Data Quality Assessment
Building Clinical Infrastructure and Expert Support Michael Steinberg, MD, FACR ULAAC Disparity Project Centinela/Freeman Health System.
Data Validation OPEN Development Conference September 19, 2008 Sushmita De Systems Analyst.
System for Administration, Training, and Educational Resources for NASA External Training Requests for Users and Supervisors November 2009.
Arthi Ramakrishnan SHINE Site Manager Stroke Hyperglycemia Insulin Network Effort (SHINE) Stroke Hyperglycemia Insulin Network Effort (SHINE) Regulatory.
RandoNode IT Conference Sept 17, /17/08 RandoNode IT Conference 2 Development Environment Setup System Environment Windows OS –JAVA_HOME - where.
FINANCIAL SUCCESS ROUTINE Provided by the LAUSD Food Services Division
QUALITY MANAGEMENT STATEMENT
Oncology Patient Enrollment Network OPEN Support Services Lucille Patrichuk OPEN Implementation Manager OPEN Conference September 18, 2008.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
30/02/2008 Dept. of Pharmaceutics 1 Salient Features of Quality Assurance Dr. Basavaraj K. Nanjwade M.Pharm., Ph.D Associate Professor Department of Pharmaceutics.
18-Sept-2008OPEN Conference OPEN Implementation in the Protocol Lifecycle Martha Hering, RN CCRP CTSU Operations Manager CTSU OPEN Conference.
Project management Topic 3 Quality.
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
Lesson 3: Web Project Management Fundamentals. Objectives Document customer expectations and feedback Determine site project implementation factors Create.
CBER Common Problems on Source Plasma Inspections Judy Ellen Ciaraldi BS, MT(ASCP)SBB, CQA(ASQ) CBER, OBRR, DBA September 16, 2009.
RIHES-II: H ANDLING A UDITS AND I NSPECTIONS E FFECTIVE D ATE 25 D ECEMBER 2006 V ERSION : 3.0 บุญเหลือ พรึงลำภู 15 มกราคม 2557.
Changing Meta Data and WSDL OPEN Development Conference September 17-19, 2008 Ravi Rajaram IT Development Manager Max Lin Senior Systems Analyst.
Business Continuity Planning for OPEN OPEN Development Conference September 18, 2008 Ravi Rajaram IT Development Manager.
Registration and Eligibility Checklist Set Up in OPEN Diana Meyer OPEN Administrator.
Oncology Patient Enrollment Network OPEN OPEN Documentation Lucille Patrichuk OPEN Implementation Manager OPEN Conference September 18, 2008.
Changing Meta Data and WSDL OPEN Development Conference September 17-19, 2008 Ravi Rajaram IT Development Manager Phoebe Whitefield Senior Systems Analyst.
Medidata Rave Start-Up Information
Soarian Orders Update: ► Type and Screen ► Crossmatch ► Transfusions Implementation Date: Nov 6, 2012 Oct 2012.
Opening An ETCTN Study at Your Site August Scope of this Presentation  This presentation applies to all sites which will be participating on.
Research Documentation Betty Wilson, CIP, MS Senior Compliance Manager MU IRB Lori Wilcox, EdD Director of Academic Compliance, Corporate Compliance.
MANAGEMENT OF PATIENT DOCUMENTATION Robert Speak Royal Shrewsbury Hospital.
Session 2 IRB Training  What is the Principal Investigator’s role in Human Subject Research?  What is the role of the Investigator’s staff in Human Subject.
Software Verification and Validation
Absence Tracking Year End Processing
Lesson 5: BRITE Seminar: GMP II
Elements of an Organized Regulatory Binder
Welcome to eHEPQUAL.
Epic Tools for Clinical Research
Presentation transcript:

Oncology Patient Enrollment Network OPEN Quality Assurance Lucille Patrichuk OPEN Implementation Manager OPEN Conference September 18, 2008

9/18/2008 OPEN Conference 2 Objective To ensure the accuracy of patient enrollment data within the OPEN System and the Regulatory Support System. To ensure the accuracy of patient enrollment data received by the lead organization via the OPEN portal.

9/18/2008 OPEN Conference 3 QA Process First protocol activated in OPEN for each Lead Group : – Initial enrollments will be processed by the CTSU registrars for a 4-6 week period before OPEN is available to all sites. –The first 10 enrollments in OPEN will undergo a quality control review. –Key data fields from the OPEN summary screen will be verified against the hard copies of the enrollment documents received from the site. –Key fields from the OPEN Summary Screen will be verified with Pre-Enrollment Certification Screen in RSS.

9/18/2008 OPEN Conference 4 OPEN Summary Screen

9/18/2008 OPEN Conference 5 EC Summary

9/18/2008 OPEN Conference 6 QA Process Contd. –The Credited Group will be verified in RSS according to the CTSU business rules. –Any discrepancies identified will be reviewed and clarified with the Site and/or the Lead organization involved if necessary. –Administrative changes made in RSS will be noted in the comments box and maintained in an audit trail. –No EC changes will be made in OPEN. All discrepancies impacting the Lead Group’s randomization system will be communicated to the Lead Group.

9/18/2008 OPEN Conference 7 Patient Enrollment Certification Screen Credited Group

9/18/2008 OPEN Conference 8 QA Process Contd. For subsequent protocols and updated ECs involving changes to metadata: –The first five enrollments will be reviewed. –The credited Group will be verified according the CTSU/Group business rules –The investigator will be checked against Group roster data –Key data fields from the summary screen will be reviewed to ensure data is valid. –A QC checklist will be completed for all enrollments reviewed.

9/18/2008 OPEN Conference 9 QA Process Contd. An OPEN Quality Control Log will be maintained to track enrollments that are reviewed. The QC Log will record the Protocol, PID, Date of Enrollment, and the result of the QA review. The OPEN Administrator will monitor and maintain the QC Log. Groups can verify the communication process between OPEN and their randonode through a review of OPEN summary data and Group treatment arm data.

9/18/2008 OPEN Conference 10 QA Process Contd. Reports of accrual data and treatment arm data from OPEN will be available to the Lead Organization for verification with their randomization data. Accrual data is available via CEWS and RSS.