Material Requirements Planning Chapter 2. MRP in MPC.

Slides:



Advertisements
Similar presentations
Material Requirements Planning
Advertisements

1 Unit 4B - Logics and Calculation of Material Requirement Planning.
SuttonDirect Sutton Planner Version 2.0. Sutton Planner Primarily designed for make to order / engineer to order environments Benefits ANY environment.
6. Material Requirements Planning (MRP)
Principles of Operations Management
Material Requirements Planning (MRP)
Materials Requirements Planning (MRP) Chapter 16 in Schroeder.
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Material Requirements Planning
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Session 12 System Transactions
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Materials Requirements Planning
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
Production Activity Control
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Chapter 16 Inventory Systems for Dependent Demand
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Material Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Lecture 9 Materials Requirements Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
P RODUCTION PLANNING What do we need to produce? Process Machinery & Equipment Labor Skills Material 1.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Material Requirements Planning (MRP)
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
Material Requirements Planning
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
LESSON 5 Introduction to Materials Requirements Planning (MRP)
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Facility Inventory Old Facilities Modern Facilities Classroom Size
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 Materials Requirements Planning
MRP and ERP.
CHAPTER 14 MRP and ERP.
14 MRP and ERP.
Set Up For Success : Reviewing Manufacturing Best Practices
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Material Requirements Planning Chapter 2

MRP in MPC

MRP and in MPC An MRP system translates the MPS’s into the detailed individual steps necessary to accomplish those plans. It also provides information to develop capacity plans. An MRP II system has a “what if” capability and involves other functions (e.g., sales, finance, human resources, accounting, etc.)

MRP Record Processing

MRP Terms Time bucket: period, e.g., 1 week. Planning horizon: number of periods. Lead time offset: offsets a planned order release from a required replenishment. Net requirement: difference between the gross requirements and the available inventory (including scheduled receipts).

Gross to Net Explosion and Lead Time Offsetting Explosion : process of translating an item’s requirements into component requirements, taking existing inventories and scheduled receipts into account. Basis for the concept of dependent demand. Precedent relationships: [from the BOM] indicate the order in which assembly must be done. MRP achieves the benefits of the backward scheduling and performs the gross to net explosion

Technical Issues Processing frequency – cost versus timeliness and accuracy Regeneration Net change Bucketless systems Lot sizing – setup cost versus carrying cost, cascading effect Safety stock, safety lead time Low-level coding

Technical Issues Pegging Firm planned orders Service parts Planning horizon Cumulative lead time Scheduled receipts vs. planned order releases

Using the MRP System MRP Planner- Primary actions [see list, p. 36] Order launching - process of releasing orders to the shop or to vendors; done when planned order release is in the action bucket. Allocation and availability checking - step prior to order launching that involves an availability check for the necessary component(s). Exception codes Bottom-up replanning - using pegging data to solve material shortage problems.

System Dynamics Transactions during a period. Rescheduling. Complex transaction processing. Procedural inadequacies – data auditing and reconciliation.

MRP Data Base Item master file - individual part data that is static. Subordinate item master file - information on part status. Bill of materials file - usually set up on a single-level basis; i.e., part number is linked only to part numbers of immediate components required to produce it.

MRP Data Base Location file - physical storage locations. Calendar file. Open order file - files of scheduled receipts (purchase orders and shop orders). Other file linkages: forecasting, capacity planning, production scheduling, cost accounting, budgeting, order entry, shop- floor control, distribution, invoicing, payroll, job standards, and engineering.

Concluding Principles Effective use of an MRP system allows development of a forward-looking (planning) approach to managing material flows. The MRP system permits decentralized decision making on individual part numbers. All decisions made to solve problems must be done within the system, and transactions must be processed to reflect the changes.

Concluding Principles Effective use of exception messages allows focusing attention on the “vital few,” not the “trivial many.” System records must be accurate and reflect the factory’s physical reality. Procedural inaccuracies in processing MRP transactions must be identified and corrected to ensure that material plans are accurate.

Homework Assignments Problems 2.6 and 2.14 Due Thursday, October 3 Use spreadsheets for the assignments