2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
September 7, 2006EPOC Winter Workshop, 2006Slide 1 On Spring Washers, Constrained Dispatch, and Dispatch Model Sensitivity Andy Philpott Duncan Ashwell.
SCED Power Balance Penalty Curve
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Critique of Proposal to Designate SAPS-Shrew as CRE Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) June 4, 2009.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
Discussion: Use of RAPs in system operations Kris Dixit 1.
Congestion Pricing: Competitive Locational Prices of Power Stoft (2002)
February 2012 CMWG Constraints Competitiveness Tests (CCT)
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Bill Hellinghausen EDF Trading North America
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
1 CRR Credit Policy Task Force Update WMS April 16, 2008.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Slack Bus Change and Impact to Market Market Analysis, ERCOT QMWG Sep. 4, 2015.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
Congestion Management Working Group WMS update 11/7/2012.
2% Shift Factor rule and associated price discrepancies Kris Dixit 1.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Lead from the front Texas Nodal 1 Resource Node Locations WMS Subgroup Meeting.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
DAM and Nodal Collateral Requirements Concerns and Solutions December 7, 2009.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
WMS – Nodal Credit Integration Start Up May 19,
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
CRR Deration and NPRR821 WMS 09/06/2017.
Nodal Program Update to Cops
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
A Midsummer Night’s DREAM
Interpreting DREAM NPRR 777.
Benefits of ICAP Reliability Economics
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Presentation transcript:

2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1

Goals Discuss the merits of the 2% shift factor dispatchable rule and conceptually understand its impact on convergence Discuss 2% rule and possible options that will meet the original intent while maintaining convergence between the three markets 2

With no CRR counter-flow bids, there is technically no generation on D in the auction. Within this model, Gen D is offline The fact that Gen D is offline, allows for line to congest and create a shadow price, thus causing a price difference between A and B in the CRR auction Example – 1: CRR Market A B 3 D Gen D has a -10% SF on this constraint but there are no counter flow offers on this node. This is the only generator with a –ve shift factor on the constraint G Bus B has a load that is being driven by its LDF due to Load Zone (sink) bids Line is overloading due to flow that is being driven by sink bids on the load zone in the CRR auction.

With no offers on bus D (TPO or energy), generator D is offline in the DAM. This generator may have no offers because it may intend to come online as merchant or has sold capacity bilaterally. The fact that Gen D is offline, allows for line to congest and create a shadow price, thus causing a price difference between A and B in the DAM Issue 2 Example – 2: DAM Market A B 4 D Gen D has a -10% SF on this constraint but there are no energy offers on this node G Bus B has a load that is being driven by its LDF due to Load Zone (sink) bids Line is overloading due to flow that is being driven by sink bids on the load zone in the DAM.

Generator D is offline. Due to loads on B line A-B starts to congest ERCOT operations would use the 2% rule to identify all generators with > 2% shift factor on the constraint that are dispatchable. In this case there are no dispatchable generators with greater than 2% shift factor and the constraint is deactivated Example – 3: RT Market A B 5 D Gen D has a -10% SF on this constraint. Gen D is offline. This is the only generator with a -ve shift factor on the constraint X Bus B has a load that is being driven by its demand Line is overloading due to real time flow

Identical situation occur in DAM, CRR and RT markets. However, congestion only occurs in DAM and CRR markets and not in RT Nearly impossible for ERCOT’s DAM and CRR Team to account for these constraints since they are being driven by information on dispatchable generators that is not available in advance The 2% dispatchable rule creates a fundamental disconnect between the CRR, DAM and RT markets, that cannot be accounted for in the CRR and DAM markets This leads to divergence between the three markets Summary 6

The 2% rule The 2% rule has been discussed in detail at CMWG and WMS The intent of the 2% rule was to make sure that the market did not show price signals for smaller lines that may have no locational benefit once generation is built However the 2% rule does not remain consistent through generation development cycles (see slides 10,11,12) The 2% rule cannot be seamlessly transitioned to the CRR and the DAM markets, since the minimum shift factor used is in those markets 7

Our Proposal Eliminate 2% dispatchable rule. Reapply the 2% rule differently by deactivating constraints on lines lower than a specific MVA threshold For example: if we deactivated all transmission lines with capacities less than 50MVA Such a rule can be seamlessly used across all three markets and could remain consistent through development cycles Creates certainty for market participants that are trying to understand market exposures 8

Appendix 9

In this specific example the line A to B is overloading and there is no generator that has > 2% shift factor on this constraint. If there was a generator at bus C, it would have a +10% shift factor on the constraint If activated this constraint would create a negative price on bus C, consistent with the reliability state. Based on the 2% rule, this constraint is deactivated and SCED does not produce a price signal at bus C consistent with this state. Prices at all four points are identical, masking the underlying reliability issue Issue 1 Example – 2% rule at timestamp T = 0 A B 50 MW line loaded to 102% C Bus C has a +10% SF on this constraint but does not see any price signal. There is no generator on this node. 10 D Bus D has a -10% SF on this constraint but does not see any price signal. There is no generator on this node.

Based on the historical price signals produced by SCED, bus C seems to have a good pricing profile and a developer decides to build a generator on bus C. Since there are no historical price signals, developer will never recognize reliability issues ERCOT and TDSP screening studies may catch this issue, only if they show up in typical base cases. If not, developer builds generation. When developer builds the intended generation, ERCOT would activate the constraint and the generator would become a discount to the rest of the system The only remedy would be a SPS, specifically at higher SF levels. Point D would have been a better siting location Issue 1 Example – 2% rule at timestamp T = 1 A B 50 MW line loaded to 102% C There is now a generator on this bus with a +10% SF on this constraint. Now we see price signals since there are generators with shift factors greater than 2% 11 D Bus D has a -10% SF on this constraint. This bus will now see a price signal associated with the reliability issue

The 2% rule is inconsistent through generation development cycles The 2% rule masks potential reliability issues that are supposed to be discovered through price signals The 2% rule is a throwback to zonal congestion management and is no longer relevant to the design intent of the nodal market Issue 1 Summary 12