Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.

Slides:



Advertisements
Similar presentations
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Advertisements

HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
How to keep the SPS running for another 25 years V. Chohan ( based on Input from N. Gilbert & many Equip. Groups) IEFC Workshop 12 th Feb 2010.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Update on the PSB Cooling and Ventilation Systems
Magnet activities in SPS during EYETS
Linac4-PSB 160 MeV connection readiness review
CONS and HL-LHC day Analysis of needs from TE-EPC
CONS and HL-LHC day Analysis of needs from BE-CO
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Equipment simplified model SMR UR safety
East Hall under construction
LIU Wire Scanner Milestones June 2017
LIU – EVM status and next steps
AD consolidation activities in LS2
Planning and Installation
EC Activities Status for the LIU
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS activities during LS2 TE-EPC (Power Converter Group)
COOLING & VENTILATION INFRASTRUCTURE
TE-MSC activities in SPS during YETS
K. Foraz on behalf of OSS members
Installation XFEL Tunnel WP 34
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
M. Zerlauth, I. Romera 0v1.
Experimental Areas – LS2 planning
Review Bloc 4 and SM18 facilities and upgrade
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders

GroupConsolidation ItemsRelated BudgetComments EN-CVCooling plant replacement2MCooling towers need to be replaced; also higher risk of legionella spread; chilled water system size incorrect (+no spare); RF equipment still cooled with drinking water in open circuit; currently no surface/tunnel circuit separation (RP request) Chilled water plant replacement2M Renovation of ventilation system3.5M (large uncertainty due to asbestos) Fire risk, unreliable controls, not working instrumentation, issues with condensate… TE-VSC12 pumping groups to be exchanged; essential are 4 pumping groups (BI and BT line) 500k4 pumping groups with difficult access highest priority; risk of failure and spare situation increasing if not replaced 2

GroupConsolidation ItemsRelated BudgetComments TE-EPC20+2 MidiDiscap PC for LT and LTB lines, 24+2 MaxiDiscap PC for LT, LTB and BI lines; related WIC machine protection, communication gateways, electrical feeders, metallic structure for racks 710kMany obsolete parts of actual PC; obsolete MIL controls; DC instead of pulsed operation; risk of accidents without metallic support structure Renovation of all PC controls for the full LHC injector chain based on G64 and MIL-1553 (~300 PC) 3M (for all LHC injectors) Obsolete electronics, 60% of CPU software unknown; high communication error rate 3

4 GroupConsolidation ItemsRelated BudgetComments TE-MSCBT.BHZ10210kurgent and approved cons item Other magnets please completexxx EN-STIBTP.STP10300kconfirm if cons item!!! BE-BIDCCT head amplifier10kstudy done? Other items??? interlocksWICconfirm!! EN-ELPlease confirmxxx

No need for CONS (or included in LIU) HL-RF (cons. already part of LIU) POPS-B budget transferred to LIU Main dump was CONS, already completed Transport: 100% consolidation, already completed Survey Extraction kickers/septa (cons. already part of LIU) Management, commissioning, HST Cables not part of this overview 5