Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.

Slides:



Advertisements
Similar presentations
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
NA62 vacuum controls, F. Mateo TE-VSC-ICM Vacuum controls of the NA62 experiment Fernando Mateo TE-VSC-ICM 1 of 14.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS Vacuum Objects Specifications Review Sebastien Blanchard TE/VSC Interlocks,
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
HIE-ISOLDE Project Status Report
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of Vacuum Control System MACS week June 2011 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
HIE-ISOLDE Project Status Report
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Isabelle Laugier, AT/VAC/ICM Section May 6 th 2008 LHC Vacuum Control system.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team HIE-ISOLDE Physics Coordination WG Meeting CERN, 16 February 2015.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
TBTS Test Program & Schedule G. Riddone
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
HIE-ISOLDE Project Status Report 50th ISOLDE & nTOF Technical Committee meeting July 1st 2015 Y. Kadi.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Technology Department BI.DIS general controls status R.A.Barlow EC section
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
ESS Vacuum Standardization
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ELENA installation progress F. Butin / ELENA collaboration.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
FCT and CERN Portuguese Trainee Programme Report
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Facility for Rare Isotope Beam (FRIB) PLC Control Systems Introduction
LINAC4 Vacuum Control System Review
Recent developments in the Vacuum Control Software
XFEL Vacuum System Commissioning
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Cryogenic C&C Scope of work
HIE-ISOLDE Status Report
WP Coordinaten XFEL RF Operation
HIE-ISOLDE Project: Planning & Resources
Undulator Vacuum System
Undulator Vacuum System
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION

Vacuum, Surfaces & Coatings Group Technology Department HIE-ISOLDE (High Intensity and Energy Isolde) Project aims at increasing the energy and intensity of the radioactive ion beams delivered by the present Rex-Isolde facility. Energy up to 10MeV/u will be reached by a new post-accelerating, superconducting (SC) linac. Beam will be delivered via a High Energy Beam Transfer (HEBT) lines to three experimental stations for nuclear physics Author: K.Radwan2/17 19 September 2014 IPAC The HIE-Isolde Vacuum System G.Vandoni, S.Blanchard, K.Radwan, P.Chiggiato

Vacuum, Surfaces & Coatings Group Technology Department REX-ISOLDE HIE-ISOLDE ISOLDE 6xCM 3xTL Building 170 Author: K.Radwan3/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department HIE-ISOLDE Evolution of HW & Vacuum Layout 2012/ /2014 Author: K.Radwan4/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department HIE-ISOLDE Evolution of HW & Layout PUMPS (Primary + Turbo) % Valves (Angel + Gate + Fast) %5% Gauges (Pirani+Penning + PB + PS) %2% Author: K.Radwan5/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Rough pumping Turbo pumping N 2 venting He processing CM sector vacuum: gauges, valves Process Control Schemes Author: K.Radwan6/17 19 September 2014 G.Vandoni

Vacuum, Surfaces & Coatings Group Technology Department Hardware Architecture Deliverables by Controls WU Deliverables by WP main WUs Author: K.Radwan7/17 19 September 2014 x13

Vacuum, Surfaces & Coatings Group Technology Department Hardware Interlock Deliverables by Controls WU Deliverables by WP main WUs 6 x CRYOGENICS 6 x RF Author: K.Radwan8/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Rack Layout Total: 11 Vacuum Control Racks; 2 positions 9 racks are used + 2 racks as spare 10x 1x Author: K.Radwan9/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department HIE-ISOLDE all racks installed Author: K.Radwan10/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Vacuum Controls Cables - EN/EL Cables + racks : Cables DIC done Cables installation : ongoing cables to be installed HEBT cables installation finished: end-Sep-14 HEBT + SC-LIN cables installed + tested: beg-Nov-14 Racks : all installed with voltage distributors (10 sockets blocks) Author: K.Radwan11/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Author: K.Radwan12/17 SC Linac HEBT 19 September 2014 HIE-ISOLDE cables installation – ongoing

Vacuum, Surfaces & Coatings Group Technology Department HIE-ISOLDE General Planning Project is spreaded into stages: commissioning: 1 – HEBT (Transfer Lines TL)end-Nov-14 1a – 1 x CM + 1 x Inter Tank + TLJun/Jul b – 2 x CM + 2 x Inter Tank + TLend – 6 x CM + 6 x Inter Tank + TL2016/17 Author: K.Radwan13/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Controls HW (Crates, Racks) Design & manufacturing specs finished All components from outside CERN purchased & available (Stage 1) CERN-mag components will be bought by manufacturer (Dechelette) Manufacturing specs sent to Dechelette HEBT crates production ends : mid-Oct-14 (Stage 1) SC-Linac crates production : end-Nov-14 (Stage:1a,1b,2) (to be confirmed) Crates installation + commissioning Start immediately as first crate available & tested : mid-Oct-14 (if instruments available) Workunit Status – 1 – Author: K.Radwan14/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Controls SW (PLC + SCADA) UNICOS CPC6 Instrums specification-list for SW generation ( UNICOS ): end-Sep-14 (HEBT) Generate & load PLC + SCADA SW: mid-Oct-14 (HEBT) Process development (pumping, venting): similar to REX Other SW development for : injection-line, fast-valves, Penning, TMPs -> ongoing : end-14 Cryomodule controls test-bench : A test-bench (mockup CM) was set-up in Vacuum lab (b.101) to develop and test the control system. The controls (cables, crates, racks, SW) will be reused for the RF cold tests in SM18. Development ongoing : Dec-2014 Use crates already produced : mid-Oct-14 Move control system from b.101 to SM18 : by Jan-15 Workunit Status – 2 – NEW !! Author: K.Radwan15/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Timeline for commissionings SCADA (supervision) availability for instruments commissioning: HEBT Stage 1: end-Oct-14 B.101 test-bench : Dec-14 CM cold tests in SM18: Jan/Feb-15 SC-LIN CM1 Stage 1a: Jun/Jul-15 Workunit Status – 3 – Author: K.Radwan16/17 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Author: K.Radwan17/17 Hardware Design done Purchase ongoing HW production ongoing Software Specs in work Process in work HEBT: SCADA ready in time for HEBT commissioning: end-Nov-2014 Cryomodule test SM18: SCADA ready Jan/Feb 2015 SC-LIN Stage 1b : Jun/Jul 2015 General Users will be in charge of operating the facility, so the vacuum control system must be simple and safe! Planning very tight after several changes of the layout & delays in the project Conclusions 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Thank you for your attention ! Author: K.Radwan 19 September 2014

Vacuum, Surfaces & Coatings Group Technology Department Spare slides

Vacuum, Surfaces & Coatings Group Technology Department Vacuum layout – HEBT G.Vandoni