WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.

Slides:



Advertisements
Similar presentations
Carbon Regulation and Resource Planning Jim Hill Western Resource Planning Forum June 21, 2010.
Advertisements

Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Reliability Challenges White Paper Victoria L. Ravenscroft Senior Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Metrics Definition Task Force Carl Linvill, Chair—MDTF W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
Study Results February 10, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RPCG – CCTA Process Vijay Satyal & Colby Johnson Reliability Planning & System Adequacy April 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Case Report PC 10 High Carbon Price PC 11 Low Carbon Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Case Results PC06 High NG Price PC07 Low NG Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Effect of Thermal Generation Replacement on System Frequency Response Enoch Davies, PE Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Energy-Water-Climate Change Potential Scenario(s) Gary Graham—Chair, SPSG W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Program Comparison Protocol vs Proposal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Wind & Transmission: The Clean Energy Superhighway Mark Lauby Manager, Reliability Assessments, NERC.
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Environmental and Cultural Data Use in Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
SPSC Low Carbon Tool: Interim Status Report CREPC/SPSC meeting San Diego, CA October 5, 2012 Arne Olson.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Clean Power Plan TENNESSEE MINING CONFERENCE AGENDA November 3, 2015 John Myers Director, Environmental Policy and Regulatory Affairs.
Puerto Rico Electric Power
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC 2015 Work Plan Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Use of EDWG Data by the LTPT WECC Staff January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Clean Power Plan & Reliability – An Update TEPPC Winter 2016 Meeting February 3 rd – 4 th 2016 Vijay Satyal PhD, Sr. Policy Analyst W ESTERN E LECTRICITY.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
2026 Common Case Development Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
© 2016 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 OPUC Meeting April 21, 2016.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Integrated Resource Plan 2016
RAC Implementation Status
2017 Study Program Discussion
Background on the 2016 Study Program Process
Study Results Common Case Study
Western Electricity Coordinating Council
RE Grid Integration Study with India
Byron Woertz Manager, System Adequacy Planning
PC21 Coal Retirement Study
RAC Implementation Status
Byron Woertz, Manager—System Adequacy Planning
Study Results Common Case Study
Study Results PC8-PC16 System Stress Tests
Scenario Development Subcommittee January 4, 2018
Byron Woertz, Manager—System Adequacy Planning
Study Results Drought Scenario Study
WECC Scenario Task Force (WSTF)
Presentation transcript:

WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Overview Summary of reliability assessment activities in 2015 Sample study case report Process and opportunities for developing the 2016 work plan 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

2015 TEPPC Study Program Data Bases 2024 Common Case 2026 Common Case 10-Year (PCM) Studies 2024 Common Case “Core Cases”Other Cases 20-Year (CapEx) Studies LTPT Enhancements 2034 Reference Case 20-Year Study Cases Round Trip Base functionality Enhanced functionality Issue-Based Analyses Flexibility Assessment Energy-Water- Climate Change Nexus Clean Power Plan Planning for Uncertainty 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Summary Observations 10-Year Cases – No unserved load – Path flows affected differently – High renewable energy  dump energy – Incremental load usually served by coal or gas – Carbon price assumptions are significant – Coal retirements require significant discussion 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Summary Observations (cont.) Priorities for Infrastructure – Uncertainties in planning – Expected future grid – Need for increased collaboration – Continue investigation of Variable Energy Resource integration – Operational flexibility needs – Potential gas-electric interface issues 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Summary Observations (cont.) Priorities for Policy – Clean Power Plan resource mix changes – Effects of DER technologies and policies – Transmission utilization impacts of legislation and regulations (CA AB 350, CPP), EV adoption) – Coal fleet flexibility and retirements – System flexibility to accommodate VERs – Impacts of expanded EIM 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

WECC 10-Year Planning Process Key Concern Define the Question Focus Question How might the Western Interconnection need to change in the next years to be able to reliably serve load with available resources? 10-Year Study Cases Where might we see congestion based on given load, resource and topology parameters? Common Case Expected future 10 years from base year 7 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

10-Year Study Results Inputs Defined by Requestor Congestion Differs from “Utilization” Some Paths Designed for High Utilization Most Heavily Utilized U75 > 50% ORU90 > 20% ORU99 > 5% 8 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Primary Results for Today Generation Changes vs CC Overall Findings Path Flow Changes vs CC 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PC-21: Coal Retirement Key Question: How will transmission flows and congestion be affected in the West in a study case that approaches the 2024 trajectory of reducing carbon emissions to 80% below the 2005 levels by 2050? Assumptions: Retirement of several coal-fired generators Additional renewable resources and EE Additional gas-fired generation Additional energy storage 10 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PC-21 Generation Changes Source 2024 Gen, TWh PC-21 Gen, TWh Increase (Decrease) Energy Storage Steam - Coal (123.8) Combined Cycle Combustion Turbine Solar Wind Dump Energy W ESTERN E LECTRICITY C OORDINATING C OUNCIL Source2024 GenPC-21 Increase (Decrease) Production Cost (1,000s) (0.6) CO 2 (MMTon)363277(86)

PC-21 Heavily Utilized Paths 12 W ESTERN E LECTRICITY C OORDINATING C OUNCIL P52 Silver Peak-Control P60 Inyo-Control P83 Montana Alberta Tie Line Path75%90%99% P60 Inyo-Control 115 kV Tie38%25%18% P52 Silver Peak- Control 55 kV34%23%0% P83 Montana Alberta Tie Line20%11%7%

PC-21 Findings Generation Increased Energy from CC and CT Increased Energy from Remaining Coal Units Increased Renewable energy— 18% to 23% Transmission Congestion on Path 83 (Alberta to Montana) High utilization on Path 52 and 60— controllable Other Findings No Unserved Load Decreased Production Cost Decreased CO2 but less than goal 13 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PC21 CO 2 Reduction 14 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

2016 Study Request Process 15 W ESTERN E LECTRICITY C OORDINATING C OUNCIL 2016 JanFebMarAprMayJunJulAugSepOctNovDec 2016 TEPPC Considers Summary Transmission Planning Assessment Report 12/13/2016 TEPPC Decision on Requests for Reconsideration 6/10/2016 Requests for Reconsideration Due 5/12/2016 TEPPC Considers Approval of Study Program 4/12/2016 Draft Study Program Posted 4/5/2016 Study Request Window Jan 1 – Jan 31 Study Program Development Feb 1 – Mar 31 Analysis and Reporting Apr 1 – Dec 31 Summary Report Development Oct 1 – Dec 31

Contact Information Byron Woertz Manager – System Adequacy Planning (801) W ESTERN E LECTRICITY C OORDINATING C OUNCIL