OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Michael Hahn reporting for Jean-Louis.

Slides:



Advertisements
Similar presentations
22-23/06/20093 rd Libera Users Meeting, ESRF1 3 years of experience of Libera BPMs at SOLEIL Nicolas HUBERT Synchrotron SOLEIL On behalf of Diagnostics.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling 1.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 1 G.Penco, M.Svandrlik Operation Uptime Maintenance Performance vs filling.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA The ANKA Vacuum System S.HermleA.Völker E.HuttelT.Fischböck.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
1 NEG COATING RESULTS AND TRENDS R. Kersevan, Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab Workshop on Vacuum Systems for Synchrotron Radiation.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
3rd Libera Users Meeting
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
February 2010 ALBA Synchrotron Light Source Francis Perez.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
OLAV III Experience with the LHC Insulation Vacuum System S. Blanchard, P. Cruikshank, B. Jenninger, N. Kos, W. Maan, L. Mourier, N. Provot, J. Wallner.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
1 MONTECARLO CALCULATIONS OF PRESSURE PROFILES FOR THE ESRF DIPOLE/CROTCH AREA R. Kersevan – Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab.
Slide: 1 MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD APS SPRING 8 ESRF AMMW2013 I. LECONTE – P. ROUSSELY – OPERATION Group.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
Vacuum System P. Chiggiato TE-VSC
Preparation Phase of the FAIR Project
PETRA III, Status and Upgrade
Vacuum Simulations for ELENA’s LNR-01 R. Kersevan IIC Meeting 9/6/2015
Sub-system integration for the VBOX
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
CESR Vacuum System Monitoring and Component Quality Assurance
Low Emittance Rings 2014 Workshop
Vacuum System Failures at HERA
CEPC Vacuum System Dong Haiyi 2017/11/5.
Action People Time [h] Shutting down the SR 2 1
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
XFEL Collimation and Beam Switchyard Vacuum Issues
Accelerator R&D Results from the B-factory
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Presentation transcript:

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Michael Hahn reporting for Jean-Louis Bersier, Francis Bodart, Emmanuel Burtin, Dominique Cognie, Gilles Debut, Franck Demarcq, Michel Garrec, Pierre Guerin, Roberto Kersevan, Gildas Le Flem, Laurence Loiacono Levet, Gérard Luce, Isabelle Parat, Daniela Schmied, Jacqueline Tucek and Vincent Marion (trainee)

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Storage Ring machine parameters –Circumference 844m –E = 6 Gev –200 (250) mA multibunch –90 mA 16 bunch –Vertical emittance nm Booster machine parameters – –Circumference 300m – –Repetition rate 10 Hz

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Storage Ring Vacuum System –Stainless Steel 316 LN Vacuum chambers connected by CF150 flanges –Lumped pumping by SIP Varian Starcell…. –and NEG St707 cartridges by SAES –Two long / three short machine shutdowns per year –In-situ baking equipment installed

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Beam-Lifetime is the key quality parameter as far as vacuum is concerned, we obtain 80 hrs at 200 mA in uniform mode Especially the modifications in the straight sections with the goal of an increased synchrotron light brilliance are critical for restarts: Quick conditioning is crucial in order to obtain acceptable Bremsstrahlungs- Level in the Beamline hutches ESRF follows two main directions to increase the brilliance –low gap Insertion Device vacuum chambers (10mm externally) with distributed pumping provided by NEG coating produced in-house at ESRF under CERN license –In Vacuum Undulators allow the magnets to come even closer to the electron beam (5.5mm), the vacuum tank is equipped with massive pumping by Ti Sublimators, SIPs and a 500 l/s St707 NEG cartridge

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 topics.. –Definition Preventive Maintenance / Downtime of Accelerators –Control System tools / Systematic Vacuum failure analysis –Additional machine data analysis for correlation –Temporary repair during Machine Shifts –Final repair / Machine Shutdown philosophy: To bake or not to bake…. –Discussion

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 The goal of our activities is to keep the unscheduled downtime of the accelerators due to vacuum as low as possible: One important parameter for the overall performance of the ESRF is (unwanted downtime / scheduled user hours) * total budget ESRF – all interventions and repairs should therefore take place during scheduled downtimes

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Control System tools

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Air leak This dynamic tool based on the ratio of normalised pressure in a given filling mode, helps us to detect : - -In USM, air leaks at a very early stage (ratio > 2) - -Ratio >5 signifies real problem on the SR (SR hitting vacuum chamber wall etc.) - In MDT, quick pressure peaks can be correlated with HOM’s in the RF cavity areas or bad RF finger contacts in an a transient bellow vacuum vessel can be identified

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 The application is programmed in Labview for Unix, it gives the possibility to compare the vacuum situation in a given mode of the Storage Ring (16 bunch, 1/3, 2/3, hybrid, single, uniform and “exotic” modes) to a stored known as “good” situation. As the data is presented as a factor compared to the reference for all relevant pressures of the SR we can identify degradation or potential vacuum problems in a single view. To store a “reference” situation the application provides a “Save” function that asks for the operation mode and stores the data accordingly with the actual time and date. This data set will be stored independent from the historical database which increases the availability time (HDB data would be saved for one year online, older data on tape). As an additional tool we have LINUX PCs in each cell that store permanently on a FIFO base all the vacuum data with 1 Hz, the intelligence of this “interface PCs” allows also to trigger a higher sampling rate for HDB when something is “happening” on the gauges. The ion pump current is monitored permanently to have an additional confirmation of p behaviour The early recognition of air leaks by means of these methods made that since 2001 all leak detections could be carried out during scheduled downtimes

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Additional machine data analysis for correlation Lifetime (h) Integrated dose (A.h) Change of the slopes on the pressure curve as well as on the lifetime profile pressure (mbar)

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Beamloss detectors cartography

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 The beamloss detectors are scintillators connected to each of the 64 dipole chambers on the SR, a MATLAB application allows to present the data representative and time- resolved. Differing from the real-time buffer as described for “vacgauge” this appliction recalls data from HDB (one hour from the desired starting time) We use also Bremsstrahlung data from XBPMs and a dedicated ionisation chamber in ID6 beamline hutch to qualify the conditioning of new ID vacuum chambers

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 pressure (mbar) CV9 ( ion pump current) CV11 (penning gauge) Helium detection + Repair

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April Identification of the leak, localization prediction by reading gauges and SIP currents location: Precision in the range of 1m 2.Leak detection during machine dedicated time, temporary fixing with varnish 3.Exchange of the Vacuum chamber during ESRF machine shutdown, with bake or warming depending on amount of new surface area - update of the history file 4.Improvements of spare chamber design following analysis of the failure

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 C17-1 C14-7 CROTCH1 CV4 CV2 CV11CROTCH2 C16-1 C15-2 C15-1 CV2 CV4 CROTCH1CV11 CELL15 CELL16 mbarmA

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Due to the water leak on a special absorber (one of a kind) we had to change absorber, dipole chamber, crotch chamber and re-baked the system after careful optical inspection with the endoscope During the restart this weekend we could recover quickly a reasonable average pressure and obtained (yesterday) lifetimes in the > mA

OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 P reventive M aintenance for S torage R ing O peration ACKNOWLEDGEMENTS Thank you: Gilles Chazot, Graham Naylor, Laurent Farvacque The first part of this presentation reports on work initiated and realized by Daniela Schmied, Isabelle Parat and the ESRF Vacuum Measurement & Analysis subgroup. Special thanks to the ESRF Computing Services.