Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, 2001 1 Fuse Boxes Chiho Wang Duke University.

Slides:



Advertisements
Similar presentations
Module design for B-layer replacement V.1. Bare Module dimensions mm Active area mm mm Footprint mm stack 200um chip 20um bumps.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Module Gas Leak Chiho Wang Duke University.
Integrated Circuits (ICs)
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
ECE 201 Circuit Theory I1 Resistors in Series Resistors connected at a single node Current through each resistor is the same.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Presented by Tim Surtell in association with
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN HV capacitor Testing.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Chiho Wang TRD Conference Duke University Bari, Sep Design and Construction of the ATLAS Barrel TRT Chiho Wang Duke University.
W. EbensteinDOE Review Duke UniversitySeptember 1999 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature failure.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Part II: Using PCB Layout Software – Custom Component Libraries
SS2 AND SS3 2014/2015 SESSION. In order to enjoy the various advantages of electricity in premises certain precautionary and method of wiring using appropriate.
High Density Interconnect (WBS 1.4.3) Extension Cables (WBS 1.4.4) Douglas Fields University of New Mexico Douglas Fields, FVTX DOE Review November 17,
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
ATLAS TRT Barrel Design Review, 1998 Barrel TRT Electronics Cooling Chiho Wang Duke University.
SQUID Performance in a HV Environment
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Groningen, 1-2 February 2001 FPU Preliminary Design Review1 First Stage Cryogenic IF Amplifier Centro Astronómico de Yebes Observatorio Astronómico Nacional.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
1 Fulvio TESSAROTTO CERN, 20/03/ GDD Meeting - Contribution from Trieste FIRST LOOK AT THGEM IN TRIESTE LAB. The set-up to measure currents THGEM.
F.Videbaek PXL geometry update. PXL ladder For realistic simulation it is essential to get the proper layout of ladders. Starting point 1.SW model 2.Material.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Make a Model A box company makes boxes to hold popcorn. Each box is made by cutting the square corners out of a rectangular sheet of cardboard. The rectangle.
RD51 Group Saha Institute of Nuclear Physics 14 February, 2014
1 ABC130 Module Envelope Envelope set by 2 locations 1.Power end – biggest contribution coming from shield box 2.Data I/O end – set by wire bonding from.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
Belle-II iTOP HVB Status SLIDE FOR INCLUSION IN GARY’S PRESENTATION Belle II General Meeting Gerard Visser Indiana University CEEM 11/13/2012.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule.
Chiho Wang ATLAS TRT Duke University CERN, Feb Gas-Flow Measurements Chiho Wang Duke University.
1 Coming - Embedded Active Components! How Does IPC Respond? TAEC Meeting, Minneapolis October 24, 2004 Denny Fritz.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Continuity tester a handy tool for testing circuits
NOVA DESK RANGE.
TOWER 3 CONFIGURATION Configuration:
Summary of Fuse Testing for Barrel Module Fuse Boxes
Barrel TRT Module Cooling
Some proposals on HV circuits realization for segmented straw detector
Summary of Fuse Testing for Barrel Module Fuse Boxes
Flex Status A.Nomerotski, 4 May 2010.
TUTORIAL An inverting amplifier circuit using Op-amp 741 IC, a feedback resistor, Rf = 95 kΩ and input resistance, Rin is used in a feedback oscillator.
HUBER+SUHNER ACS Confidential ACS May 2013.
Resistors in Series Resistors connected at a single node
testing and experimenting with electronic circuits
EGR 101 Introduction to Engineering I
Presentation transcript:

Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University

Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Box Components  FR-4 casing  FR-4 printed circuit film u 1812 size 1nF filter capacitors (same as module capacitor) u 1206 size 1-2k filter resistors u Custom made fuses  Truncated Molex 2759 female terminal  Habia HFI 150 minicoax HV cable  GC Corona dope coating  Furon K102, 0.001” Kapton ” Acrylic adhesive tape  2-56 Nylon screw

Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Prototype  Fuses replaced by 2010 size 1M  resistors for HV testing

Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Molex 2749 terminal CUT

Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Type 1 Fuse Box Prototype

Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuses

Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse & fuse box dimension  Fuse length: 5.8mm u prototype assumes 5.08mm u Additional space available in each module type: type 1: 3.2 mm type 2: 6.9 mm type 3: 7.9 mm

Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse & fuse box dimension  Fuse height: leg space ~ 4mm u Prototype allows 3mm. u Increase ~  x 2 ~ 2-3mm for 2 layers of fuses

Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Summary  Fuse box prototypes have been in use for ~ 1 year in various module production QA processes. u Each module requires at least a dozen times of fuse box connection before completion.  Present design works and sees no obvious problem.  Available fuse dimension requires minor change in fuse box dimensions but is within acceptable range.  When fuse is available will proceed with fuse box prototype.