Design Point Studies for Next Step Device National High-power Advanced Torus Experiment NHTX C Neumeyer 7/25/06.

Slides:



Advertisements
Similar presentations
XP 1157 Increasing the CHI start-up current magnitude in NSTX B.A. Nelson et al. 1.
Advertisements

First Wall Heat Loads Mike Ulrickson November 15, 2014.
ASC XP-823 Error Field Correction and Long Pulse J.E. Menard, S.P. Gerhardt Part 1 Determine the source of, and optimal correction for, the observed n=3.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
ICC2004 Madison, Wisconsin The Multi-Pinch Experiment Outline PROTO-SPHERA purpose & aims Theoretical basis & analysis Multi-Pinch: a step towards PROTO-SPHERA.
Booster Main Bending Magnet Test in SM18. Why The energy upgrade of the PS Booster main bending magnet requires endurance tests at high current (≈12 kA)
Introduction to Spherical Tokamak
Critical Issue on Plasma Equilibrium for CS-less Tokamaks Kichiro Shinya Toshiba Corporation Japan-US Workshop on Fusion Power Plants and Related Advanced.
NSTX Center Stack Upgrade Workshop Brainstorming on Design Solutions for TF Joint C Neumeyer Jan 22, 2009.
Proposals for Next Year’s MFE Activities C. Kessel, PPPL ARIES Project Meeting, Sept. 24, 2000.
Development of the New ARIES Tokamak Systems Code Zoran Dragojlovic, Rene Raffray, Farrokh Najmabadi, Charles Kessel, Lester Waganer US-Japan Workshop.
Progress on Engineering and Costing Algorithms for ARIES Systems Code Zoran Dragojlovic, Rene Raffray, Chuck Kessel and Leslie Bromberg ARIES Project Meeting.
DEMO Parameters – Preliminary Considerations David Ward Culham Science Centre This work was jointly funded by the EPSRC and by EURATOM.
Use of Simple Analytic Expression in Tokamak Design Studies John Sheffield, July 29, 2010, ISSE, University of Tennessee, Knoxville Inspiration Needed.
Y. ASAOKA, R. HIWATARI and K
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
REQD FUTURE POWER SYSTEM CHANGES  Following additional work is required to be performed to restore full capability of the machine: 1. Provide power feed.
1 ST workshop 2005 Numerical modeling and experimental study of ICR heating in the spherical tokamak Globus-M O.N.Shcherbinin, F.V.Chernyshev, V.V.Dyachenko,
A novel model for Minimum Quench Energy calculation of impregnated Nb 3 Sn cables and verification on real conductors W.M. de Rapper, S. Le Naour and H.H.J.
Inner PF Coil Design Updated C Neumeyer 2/2/10. Changes Since Prior Version Added electrical insulation – Account for 3-wire system ground fault – Account.
NSTX_U Design Point Study Active H2O Cooling Pulse Length 60 sec C Neumeyer 5/19/6.
Bias Magnet for the Booster’s 2-nd Harmonic Cavity An attempt to evaluate the scope of work based of the existing RF design of the cavity 9/10/2015I. T.
NSTX/MAST Engineering Workshop C. Neumeyer National Spherical Torus Experiment (NSTX) NSTX Design Overview NSTX/MAST Engineering Workshop C. Neumeyer
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
NSTX Center Stack Upgrade Workshop Requirements & Design Point C Neumeyer Jan 22, 2009.
ARIES AT Project Meeting - Princeton, NJ 18 Sept 00 1 ARIES-AT Toroidal Field (TF) and Poloidal Field (PF) Coils Tom Brown, Fred Dahlgren, Phil Heitzenroeder.
V. A. Soukhanovskii NSTX Team XP Review 31 January 2006 Princeton, NJ Supported by Office of Science Divertor heat flux reduction and detachment in lower.
NSTX-U NSTX-U PAC-31 Response to Questions – Day 1 Summary of Answers Q: Maximum pulse length at 1MA, 0.75T, 1 st year parameters? –A1: Full 5 seconds.
Failure of Original TF Inner Leg Assembly C Neumeyer 4/10/3.
PF1A upgrade physics review Presented by D. A. Gates With input from J.E. Menard and C.E. Kessel 10/27/04.
EAST Data processing of divertor probes on EAST Jun Wang, Jiafeng Chang, Guosheng Xu, Wei Zhang, Tingfeng Ming, Siye Ding Institute of Plasma Physics,
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Compact Stellarator Approach to DEMO J.F. Lyon for the US stellarator community FESAC Subcommittee Aug. 7, 2007.
Design Point Studies for next step device National High-heat-flux Advanced Torus Experiment NHTX C Neumeyer 6/8/6.
Work with TSC Yong Guo. Introduction Non-inductive current for NSTX TSC model for EAST Simulation for EAST experiment Voltage second consumption for different.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
TITLE Stuart R.Hudson, D.A.Monticello, A.H.Reiman, D.J.Strickler, S.P.Hirshman, L-P. Ku, E.Lazarus, A.Brooks, M.C.Zarnstorff, A.H.Boozer, G-Y. Fu and G.H.Neilson.
GOLEM operation based on some results from CASTOR
Optimization of a High-  Steady-State Tokamak Burning Plasma Experiment Based on a High-  Steady-State Tokamak Power Plant D. M. Meade, C. Kessel, S.
Summary of RF Work To Date G. Taylor NSTX Monday Physics Meeting June 21, 2010 NSTX Supported by 1.
18th International Spherical Torus Workshop, Princeton, November 2015 Magnetic Configurations  Three comparative configurations:  Standard Divertor (+QF)
ZHENG Guo-yao, FENG Kai-ming, SHENG Guang-zhao 1) Southwestern Institute of Physics, Chengdu Simulation of plasma parameters for HCSB-DEMO by 1.5D plasma.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
Merging/compression plasma formation in Spherical Tokamaks
Simulation of Non-Solenoidal Current Rampup in NSTX C. E. Kessel and NSTX Team Princeton Plasma Physics Laboratory APS-DPP Annual Meeting, Savannah, Georgia,
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
REQUIREMENTS & ASSUMPTIONS C Neumeyer 4/10/3. FIELD AND CURRENT Base GRD requirement: 3kG at R 0 =0.854m with 4.5 sec flat top, once every 300s
NSTX OH Coil Optimization Ali Zolfaghari. Optimization Parameters: Coolant channel diameter –Larger coolant diameter will lead to coil temp above 100°
Presented by Yuji NAKAMURA at US-Japan JIFT Workshop “Theory-Based Modeling and Integrated Simulation of Burning Plasmas” and 21COE Workshop “Plasma Theory”
BACKGROUND Design Point Studies for Future Spherical Torus Devices Design Point Studies for Future Spherical Torus Devices C. Neumeyer, C. Kessel, P. Rutherford,
Long Pulse High Performance Plasma Scenario Development for NSTX C. Kessel and S. Kaye - providing TRANSP runs of specific discharges S.
Status of Upgrading Project of Tokamak T-15 E. Azizov 1), P. Khvostenko 1), I. Anashkin 1), V. Belyakov 2), E. Bondarchuk 2), O. Filatov 2), V. Krylov.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
Joint Meeting of the 3rd IAEA Technical Meeting on Spherical Tori and the 11th International Workshop on Spherical Torus St. Petersburg, 3 to 6 October.
SiD Solenoid Dump Resistor Wes Craddock SLAC Design Parameters and Concept Assume worse case of 2 GJ Use CMS parameters: Same Conductor with.
Areal RF Station A. Vardanyan
MANUFACTURING OF MAGNETS FOR SST-1 TOKAMAK
Positron production rate vs incident electron beam energy for a tungsten target
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Construction and Status of Versatile Experiment Spherical Torus at SNU
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
TBM thermal modelling status
Lower Ip Long Pulse L-mode and H-mode Advanced Scenarios
What I have learned from EAST experiments 胡友俊
as a prototype for Super c-tau factory
Analysis of Technical and Programmatic Tradeoffs with Systems Code
Presentation transcript:

Design Point Studies for Next Step Device National High-power Advanced Torus Experiment NHTX C Neumeyer 7/25/06

Outline Objectives Method Physics Assumptions and Plasma Shapes Engineering Assumptions and Issues - TF inner leg cooling - Heat removal from machine - Divertor heat removal - Power supply utilization Results Conclusions

Objectives of New Machine High P/R - plasma should accept P aux = 32MW NBI + 6MW RF = 38MW Non-Inductive Sustainment - solenoid sized for ramp-up flux only Long Pulse - active water cooling, 60 second pulse Full Use of PPPL/TFTR Infrastructure - full MG energy + grid power - full PS capacity - full NBI capacity Some Incremental Infrastructure Required - water flow - 138kV substation

Method XL-based “Systems Code” using non-linear optimizer (“Solver”) Jardin/Kessel algorithms used for NSST were starting point for Systems Code Continued evolution with Peng, Rutherford, Kessel for CTF studies - See PPPL Report 4165 “Spherical Torus Design Point Studies” Engineering & physics algorithms tailored to suit NHTX situation

Physics Assumptions

Range of Cross Sections  = 3.674/SQRT(A_100)  =0.6  = 3.674/SQRT(A_100)  =0.6 Simple limiter shape model:

Limiter model vs. Divertor separatrix flux surface from J. Menard A=1.8

Engineering Assumptions

TF Inner Leg Cooling Typical T v. t fPacking depends on J_avg and dZ fPacking depends on J_avg and dZ KCOOL model Possible x-section Cu H20 Adiabatic

Machine Heat Removal TFTR ratings… Water tank = gallons (adequate) Cooling power = 20MW (adequate) Component cooling = 3300 GPM (~ 1/6 of requirement) Not limiting Compared to PS (1200s) Not limiting Compared to PS (1200s)

Divertor Heat Removal 4” dia pipes are adequate for divertor supply/return manifolds (assume full power capacity on top and bottom)

Power Supplies Use PS at 15kA per PSS (continuous rating of SCRs) Rep rate limited to ~ 1200s min due to 3.25kA rms rating Xfmrs OK (8 hrs) Xfmrs OK (8 hrs) 5 parallel 750MCM per PSS ~ 50 parallel 1000MCM cables req’d for 200kA-60s/1200s

Procedure Scan over R0 and A with SOLVER set to maximize P_aux running at beta limit - R0 from 0.8 to A from 1.7 to 2.5 Select R0 and A and set SOLVER to maximize Ip With P_aux at 38MW and P_cd ≤ 32MW

Scan Results

Design Point R0=0.95/A=1.8 Yields 4MA/1.8T and P/R ~ 40

Plan View 12 outer legs (3 turns per leg) NBI 90, 100, 110cm

Elevation View TF, OH and PF coil dimensions as represented in systems code Extra +/-50cm in dZ TF would reduce performance by ~ 5% in Ip TF, OH and PF coil dimensions as represented in systems code Extra +/-50cm in dZ TF would reduce performance by ~ 5% in Ip

Conclusions More work is needed on parameter scans More careful study of A=1.8 to A=2.0 range Much work remains to… - develop & prove out physics and engineering aspects of design - optimize water cooling aspects Highlighted challenges… - TF bundle torsion - TF joint - large water flows