Tracker Week, CERN, 10-13 Feb 2004 12 Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.

Slides:



Advertisements
Similar presentations
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
Advertisements

CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Strasbourg status Ring 7 pilot run François Didierjean.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.
GuidoTonelli /TK_GM/CERN/07_12_05 1 TIB/TID Status Report (on behalf of the INFN consortium) STATUS OF THE INTEGRATION ACTIVITY OF THE TIB/TID_FWD TIB-MTCC.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
Status Report on Bonding at Catania
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Bonding web site, renovated
UCSB Hybrid Bonding & Testing
FNAL Production Experience
On behalf of the US TOB testing group
US Module Production Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Results from module testing
Vienna Module Production
Module Failures on RODs
Module Production Status in Florence
CMS Perugia Modules Production Review
Module production in Italy
Bari production centre resp. M. de Palma
Hybrid Status/Deliveries
CMS Perugia Gantry Status Report
FNAL Hybrid Testing Status
Module Production in Brussels
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di Catania and INFN – Sezione di Catania

12 Feb 2004Tracker Week - Module Production2 Salvatore Costa - Catania Outline There were no major specific technical issues in the Reports from individual Centers. –Zurich showed that it’s better to remove transport plate to bond and pull-test TEC R4 Modules I will report here on: 1.New Bonding Centers 2.New decisions about Procedures 3.Summary of number of Modules bonded and give a 1.Quick review of Module bonding quality indicators

12 Feb 2004Tracker Week - Module Production3 Salvatore Costa - Catania New Bonding Centers 1.CATANIA On 5 Dec 2003 the INFN Consortium agreed to re- designate Catania as Production Center. Previously it was “Bonding Repair Center” and also already had responsibility for LT Module Testing. Facility is 2 Hughes 2470 II machines (older) –It’s foreseen Catania will bond ~500 TIB/TID Modules. –Modules for Catania come from the Bari Gantry. Received: 25 Modules. Bonded: 11 fully, 5 “almost”. 2.HAMBURG Have 19 modules w/ or w/o ceramic stiffener, and no glue at corners of sensor. Successfully bonded 2, after placing glue under corners. Also made their own jigs (2).

12 Feb 2004Tracker Week - Module Production4 Salvatore Costa - Catania Module Pull Tests (50 th wires, PA Test Areas) At each Center: 1.On every Module for the first 20 Modules of the current production (i.e. after PA bonding problems and kapton cable break problem solved) if OK, or until results are either satisfactory or cannot be further improved but fall within specs. 2.On 1 Module/week afterwards. 3.Bonds in PA test areas will still be made on every module but pulled either if a problem is suspected or else once per week together with the 50 th wires. Pull Test Procedures

12 Feb 2004Tracker Week - Module Production5 Salvatore Costa - Catania Number of Modules Bonded since the epoch 44 (16) 12

12 Feb 2004Tracker Week - Module Production6 Salvatore Costa - Catania Number of Modules Bonded ZURICH after Hyb prod resumed with stiffener added to kapton cable 44 (16)

12 Feb 2004Tracker Week - Module Production7 Salvatore Costa - Catania Indicators of bonding quality 1.Results of pull tests [specification for production Modules : mean > 5g] –on Pitch Adapter test areas –on a sample of readout bonds (every 50 th wire) 2.Number of repaired failures during bonding –typically wire fails to stick until either pads are cleaned or PA edges are supporeted or or bonding parameters are increased 3.Number of unbonded channels (that were not supposed to be left unbonded for Sensor strip defects)

12 Feb 2004Tracker Week - Module Production8 Salvatore Costa - Catania Module Pull Tests Performed # Modules pull tested, separately per bond type after 01Dec2003 (since the epoch) Results in DB from 9 Centers out of 14 CenterPA TAPA-SenSen-Sen Bari24 (27)24 (30) n/a Catania11 (11) n/a Firenze1 (7) 0 (2) n/a Padova0 (1) 0 (2) n/a Pisa1 (8) 18 (29) n/a Torino19 (27) n/a Fermilab7 (7)7 (41)0 ( 0) Santa-Barbara20 (32) 20 (29) Zurich0 (0) 4 (12) n/a

12 Feb 2004Tracker Week - Module Production9 Salvatore Costa - Catania Explanation of pull test results shown …. ~ 15 plots like the one below. Pruned and summarized into just 2 plots… 01Dec2003

12 Feb 2004Tracker Week - Module Production10 Salvatore Costa - Catania Pull Test Results Summary Only Modules bonded after 01Dec2003 make this plot BA CT FI PI TO FNAL UCSB # Modules pull tested

12 Feb 2004Tracker Week - Module Production11 Salvatore Costa - Catania Pull Test Results Summary Only Modules bonded after 01Dec2003 make this plot BA CT PI TO FNAL UCSB UCSB ZH Sen-Sen # Modules pull tested

12 Feb 2004Tracker Week - Module Production12 Salvatore Costa - Catania Repaired failures during bonding [Only Modules bonded after 01Dec2003] center# Modules /Module Bari260.5 Catania117.6 Fermilab70.9 Firenze291.0 Padova83.6 Pisa870.4 Santa-Barbara Torino180.0 Zurich40.0

12 Feb 2004Tracker Week - Module Production13 Salvatore Costa - Catania Number of unbonded channels [Other than those which were supposed to be left unbonded because of known Sensor strip defects] –So far only 3, at Catania (bonding accident)

12 Feb 2004Tracker Week - Module Production14 Salvatore Costa - Catania The last edit… All 556 Modules bonded so far Strips unbonded for whatever reason (mostly Sensor defects)