CUNA Mutual Group’s Quality Assurance Process In the context of Solution Delivery.

Slides:



Advertisements
Similar presentations
Process and Product Quality Assurance (PPQA)
Advertisements

Software Quality Assurance Plan
QuEdge Testing Process Delivering Global Solutions.
PROCESS FRAMEWORK Lecture - 3. Topics covered PROCESS FRAMEWORK PROCESS MODELS DIFFERENCE.
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Software Quality Assurance Plan
Chapter 4 Quality Assurance in Context
© 2013 IBM Corporation Tivoli and Maximo Quality Improvement Initiatives March 2014.
ITIL: Service Transition
Project Scope Management
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
Stepan Potiyenko ISS Sr.SW Developer.
Documentation Testing
Chapter 5: Project Scope Management
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
SE 555 Software Requirements & Specification Requirements Validation.
Copyright  Larry Dribin, Ph.D. SE470_EngFlows_v1.ppt SE470 EngFlows - 1 Excellence in Software Engineering Repeatable Level Defined Level Manage.
System Development Life Cycle (SDLC)
Chapter 5: Project Scope Management
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Project Scope Management
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
© 2006, Cognizant Technology Solutions. All Rights Reserved. The information contained herein is subject to change without notice. Automation – How to.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
October 15, 2004 – 1 Welcome IPMA and SolutionsIQ Professional Event Testing, Testing, 1…2…3… Improving software quality -- one bug at a time.
Advanced Project Management Project Plan Templates
Effective Methods for Software and Systems Integration
PMP® Exam Preparation Course
Test Organization and Management
1 Chapter 2 The Process. 2 Process  What is it?  Who does it?  Why is it important?  What are the steps?  What is the work product?  How to ensure.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Don’t Just “Test”… Validate!!
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Project Scope Management Process
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Chapter 5: Project Scope Management Information Technology Project Management.
How To Build a Testing Project 1 Onyx Gabriel Rodriguez.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Project Life Cycle.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
Project Scope Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s original presentation.
Validate Scope What we have: Requirement Traceability Matrix Verified Deliverables What we do: Inspection What we get: Accepted Deliverables.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Chapter 12 The Network Development Life Cycle
PI2134 Software Engineering IT Telkom.  Layered technology  Software Process  Generic Process (by Pressman)  Fundamental activities (by Sommerville)
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Defining and Managing Project Scope. MOV Scope Phases Time Estimates Resources Tasks Schedule Budget Sequence Project Planning Framework.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Configuration Control (Aliases: change control, change management )
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Software Testing-STLC
Certified Software Tester How To Build a Testing Project, Part 1.
Software Reviews Ashima Wadhwa.
ITIL: Service Transition
Software Engineering (CSI 321)
Software Quality Engineering
Software Verification and Validation
Chapter 10 Software Quality Assurance& Test Plan Software Testing
TechStambha PMP Certification Training
Software Requirements
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Introduction To software engineering
Presentation transcript:

CUNA Mutual Group’s Quality Assurance Process In the context of Solution Delivery

What is Solution Delivery? The process of delivering a new technology solution or delivering new functionality in an existing technology solution

Solution Delivery Examples b Building a new business system b Adding to an existing business system b Purchasing a business system b Creating a Lotus Notes database b Adding a new storage system to our servers b Upgrading our word processing tool b Bringing in a new development tool b Operating system maintenance cycles b Upgrading network topology b Making a configuration change

Working Customer w/ Scheduled Operation Plan Identified Plan to Resolve Need New Application or Technology Tools System Diagnostics Operate Production Ready Solution Consult (People or Process) Interpret Implement & Stabilize Production Acceptance Reactive or Proactive Need Established Schedule Non-technical solution Fixes Existing Component Logged and Routed Request Strategic Planning Running Solution Selected Technology Solution Tested Solution Develop Feasibility & Planning Conceptualize Defined High Level Drivers Gate CUNA Mutual’s IT Process Workflow

Business Case (Scope) Checkpoint Requirements Checkpoint DesignComponent Integration Test Construct Checkpoints Environment Integration Test Acceptance Test Implementation Test Benefits Realization Assessment = Verify = Validate Test PhasesSpecification Phases Component (Unit) Test Checkpoint CUNA Mutual’s QA V-Model Conceptualization Feasibility/Planning Develop Implement/Stabilize Operate Are we doing the right job? Are we doing the job right?

Quality Assurance Checkpoints b Verification/Validation b Test Planning on left (Review) b Test Execution on right (Testing) b Dual Development paths b Communication b Roles defined b Business Involved Throughout b No Surprises

Before it gets physical...

Quality Plan The Quality Plan describes the specific deliverables that are inspected at each checkpoint on the V-Model. In addition to detailing the validation and verification objectives on each deliverable, the plan lists the roles that are involved and the contribution each role makes. The Quality Plan is documented in the Wizard in the IT Process Workflow Book.

Quality Plan Expectations b Deliverables should be stable when entering a checkpoint b Informal reviews can be held throughout development to enhance the quality with formal review looking for defects b Standards vs. Guidelines b Suggestions will be incorporated or addressed with appropriate authority (See the Quality Plan for each deliverable) b Defects need to be fixed at the point of origin and cycle back through the process b Changes need to be reflected to previously reviewed deliverables - may require follow up reviews b The project plan needs to be evaluated at every checkpoint b Test results will be approved by someone other than the tester

Test Planning makes testing a non-event

Business Case (Scope) Checkpoint Requirements Checkpoint DesignComponent Integration Test Construct Checkpoints Environment Integration Test Acceptance Test Implementation Test Benefits Realization Assessment = Verify = Validate Component (Unit) Test Checkpoint QA V-Model Conceptualization Feasibility/Planning Develop Implement/Stabilize Operate Are we doing the right job? Are we doing the job right? Traditional development example

Business Case (Scope) Checkpoint Requirements Checkpoint DesignComponent Integration Test Construct Checkpoints Environment Integration Test Acceptance Test Implementation Test Benefits Realization Assessment = Verify = Validate Component (Unit) Test Checkpoint QA V-Model - Purchased View: Purchaser is responsible for tasks ‘above’ the line. Conceptualization Feasibility/Planning Develop Implement/Stabilize Operate Are we doing the right job? Are we doing the job right? Vendor Performs ‘below’ the line.

Business Case (Scope) Checkpoint Requirements Checkpoint DesignComponent Integration Test Construct Checkpoints Environment Integration Test Acceptance Test Implementation Test Benefits Realization Assessment = Verify = Validate Component (Unit) Test Checkpoint QA V-Model Conceptualization Feasibility/Planning Develop Implement/Stabilize Operate Are we doing the right job? Are we doing the job right? Infrastructure/Hardware example

Our Approach to Process Learn the rules so you know how to break them Properly Dalai Lama

Questions?