TE-MPE-EM Assembly workshop Betty Magnin 29/11/2012 1.

Slides:



Advertisements
Similar presentations
Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
Advertisements

Welcome to HEAD Electronics BV 1 Welcome to Head Electronics B.V.
BTEC First Engineering
BTEC First Engineering
TE-MPE-EM Costing Betty Magnin 29/11/ Costing History Operational budgets Invoicing Cost balancing over fiscal year 2 29/11/2012.
CERN Betty Magnin / Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Betty Magnin / Erik van der Bij CERN Electronics Design Office.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
EUG 20/06/2012 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
Creating a VUNet ID Barcode Barcoded VUNet ID can be used to authenticate a user for glucometers and Point of Use (POU)
Quality at your service. Key Figures Established December 5th, Subsidiaries in France, and 1 in China Turnover 2.5 M.€ in people at your.
Components of an Automated Manufacturing System
4/11/2011Rui de Oliveira1.  Collection of the biggest PCB failures we’ve seen at CERN workshop since 10 years.  The PTH (plated through hole) is the.
Demands for Producing IPC Class 3! Lars-Olof Wallin IPC European Representative Seminar MITT University
Systematic use of IPC Standards!
SEMINAR ON SURFACE MOUNT TECHNOLOGY
Introduction The IMPAK Tenant Retention Program is a leading Internet-based property management maintenance system for multiple, high-profile office buildings.
Presentation of HanKing
Quality Cost Quality Cost- those cost associate with the non achievement of product or service quality. Types Prevention Cost –Planning, Document, Control,
From Research Prototype to Production
Document Control Basics of Good Documentation and
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
Workshop Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Operations & Maintenance and Training.
SANILAB THE LOGICAL INDUSTRY CHOICE. SANILAB Industry edition Risk management is costly and stressing for production, quality and any other people of.
Introduction of Quality Procedures in the Electronics Design Office
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
INFO 627Lecture #101 Requirements Engineering and Management INFO 627 Review Glenn Booker.
“PCB” -AMIT NIKAM -ASHI NAGARIYA.
CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized.
WORKSHOP Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 9: Equipment Delivery.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
1 FTK Rear Transition Module Mircea Bogdan The University of Chicago March 9, 2015 Production Readiness Review.
CEP Set 2 (E) Disabilities. Situation and role You are Stanley Tsang – student at Kowloon College A volunteer for Society Link.
TE-MPE-EM Budget Structure Betty Magnin 29/11/
MicroMet Cutting Edge Technology Defence Systems Division.
EUG 01/02/2011 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
CERN EST -DEM CERN Erik van der Bij EP ELECTRONICS ADVISORY BOARD 4th Meeting 7 November 2002 Erik van der Bij CERN EST-DEM Group leader.
Adrian Janson, Melbourne High School Information Systems, Data and Information, The IPC and Organisations For VCE Software Development ¾, 2007.
TE-MPE Annual Meeting Activity report of EM section 11/12/2015 Betty Magnin.
CERN Workshop upgrade status Rui De Oliveira RD51 22/11/2011 WG6 WG6 9/1/20111Rui De Oliveira.
Electronics Group in Zeuthen K.-H. Sulanke Liebenberg,
TE-MPE-EM: Subcontracting Raphaël Berberat
TE-MPE-EM Design Office William Billereau 29/11/
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
A leading South African Electronic Contract Manufacturer Trends in electronic manufacturing and SMME Opportunities.
EN-ICE-DEM Some figures for job requests throughout the whole section, including 280 designs (new or modifications) 700 in-house MPGD and PCB.
IE Operations Analysis 1: ● System Analysis – Environment Analysis – Personnel Analysis – Facilities & Equipment Analysis – Process Analysis ● Traditional.
MPE-EM Workshop The assembly workshop S. KaufmannJune 16, 2016.
Etienne CARLIER TE-MPE-EM Support Feedback from TE/ABT.
Caitlin Grzybala Content Operations Analyst
Subcontracting of electronics modules
Welcome ! Capstone Design Lab is a new 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Welcome ! Capstone Design Lab is a newer 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Subcontracting and company selection
MPE-EM Workshop Purchasing strategy for electronic modules
MPE-EM Workshop Design Office William Billereau
Electronic Assembly Quality and Standards
Repair Management Script Auto Workshop management script Workshop Management System
Systems Design, Implementation, and Operation
Presentation.
Division of Air AirCom DARM’s New Compliance and Enforcement Database and Field Inspection Tool.
CAD CAM.
Introduction to Scheduling Chapter 1
L&V Manpower Development Prepared by: HR department Mar, 2013
The Basics of Information Systems
The Basics of Information Systems
Tour - session 9 Work Order Release and Production Activity Control
Computer-Aided Design (CAD)
Printed Circuit Board Reverse Engineering / Prototyping Suite (PCB-REPS) PROBLEM STATEMENT Avionics repair is often hindered when circuit card assemblies.
Presentation transcript:

TE-MPE-EM Assembly workshop Betty Magnin 29/11/2012 1

Fine-pitch photolithography facility - PCB manufacturing Industry Design Office Assembly Workshop Planning and subcontracting Technological and commercial choices Ordering, collecting components, tracking Invoicing Repair MPGD Design, manufacturing and assembly Structure 29/11/ staff/ 2 FSU1 staff / 9 FSU 4 Staff 8 staff/ 12 FSU

Assembly workshop Mission Ressources Workload Quality 29/11/20123

Mission Assembly prototypes 1 to 10 pces Rigid, flex, flex-rigid From design office or direct users Repair or modify PCB From direct users Assembly special pieces MPGD Not feasable in the industry Setup of new processes Feedback to the design office 29/11/20124

Some examples

1 technician specialized in production processes 1 technician specialized in production processes 3 technicians specialized in PCB assembly and special repair 3 technicians specialized in PCB assembly and special repair Resources 29/11/20126

Equipment CAD to CAM software Solder paste screen printing Automatic SMD placement SMD component repair and replacement Reflow soldering Cleaning Inspection Most of them are less than 6 years old 729/11/2012

Equipment 829/11/2012

9

1029/11/2012

11TE meeting29/11/2012

Workload Repairs and modifications 10 to 20 per month Priority on the other jobs Prototypes and special products 10 jobs in progress 15 in the pipeline Visibility max 2 months 29/11/201212

Quality Process validation Maintenance of equipment EDS directives 29/11/201213

Quality Assembly instruction from released documents in EDMS Acceptance: IPC standard Crosschecks (visual control after soldering and assembly) Feedback to the design office ! 29/11/201214

Any question? 29/11/201215