TE-MPE-EM Assembly workshop Betty Magnin 29/11/2012 1
Fine-pitch photolithography facility - PCB manufacturing Industry Design Office Assembly Workshop Planning and subcontracting Technological and commercial choices Ordering, collecting components, tracking Invoicing Repair MPGD Design, manufacturing and assembly Structure 29/11/ staff/ 2 FSU1 staff / 9 FSU 4 Staff 8 staff/ 12 FSU
Assembly workshop Mission Ressources Workload Quality 29/11/20123
Mission Assembly prototypes 1 to 10 pces Rigid, flex, flex-rigid From design office or direct users Repair or modify PCB From direct users Assembly special pieces MPGD Not feasable in the industry Setup of new processes Feedback to the design office 29/11/20124
Some examples
1 technician specialized in production processes 1 technician specialized in production processes 3 technicians specialized in PCB assembly and special repair 3 technicians specialized in PCB assembly and special repair Resources 29/11/20126
Equipment CAD to CAM software Solder paste screen printing Automatic SMD placement SMD component repair and replacement Reflow soldering Cleaning Inspection Most of them are less than 6 years old 729/11/2012
Equipment 829/11/2012
9
1029/11/2012
11TE meeting29/11/2012
Workload Repairs and modifications 10 to 20 per month Priority on the other jobs Prototypes and special products 10 jobs in progress 15 in the pipeline Visibility max 2 months 29/11/201212
Quality Process validation Maintenance of equipment EDS directives 29/11/201213
Quality Assembly instruction from released documents in EDMS Acceptance: IPC standard Crosschecks (visual control after soldering and assembly) Feedback to the design office ! 29/11/201214
Any question? 29/11/201215