Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Tuesday 3 rd May 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight 9:45 probes injected.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Friday 15th June 01:11 Injection.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Wednesday 31 October: Morning
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Thursday :00: Physics fill from the night shift
Yesterday’s morning’s controls issues
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Cold compressor speed S45
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
LHC Status Fro Morning 9-Sep
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Friday 15th February - morning
Wednesday 26 October 2011.
Wednesday morning / afternoon
Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.
Tuesday
Presentation transcript:

Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent most of the morning in access, for the following reasons:  LBDS MKD card had to be changed;  Alice had a quick access in the shadow;  Observations done for the water leak in 30L4;  cryo accessed PM25 for verifications following the morning trip, unfortunately the usual problem had the patrol lost (sectors 1 and 4); LHC 8:30 meeting 27/04/2011

Tuesday 26 th April – morning shift Zinur found out that the RB.A34 switches had not opened once when they should have.  Tests were done, an access was given to change a card (which will be studied offline). All RB switches have been tested and work now correctly.  The events following the 400 kV power disturbance on Sunday morning at (Fill # 1732) leaves a number of issues to be properly addressed.  The basic problem was that the discharge request issued for the RB circuit in sector 34 (following a UPS interlock in IR3) didn’t result in the expected switch opening procedure due to a lack of complete current extinction in the quench loop.  DQQLC board has been exchanged in UJ33 and RB.A34 retested (as all other circuits to trigger correctly from the Odd side) – OK to continue for now, additional verifications need to be done during the upcoming TS. Then, finally, prepared for injection. Left the machine with probes in and the SPS checking the beams (problem on excessive transverse emittance). LHC 8:30 meeting 27/04/2011

“usual problem in PM25” LHC 8:30 meeting 3 27/04/2011 Access finished in pt 2. Patrols were lost at 10:18, sectors 1 and 4. Trying to find someone from the access system to check, it looks like the patrol was lost when people were accessing the PAD normally (usual problem in PM 25). Found Serge (Di Luca), who's on holidays, he'll get someone else to have a look. Also informed the coord. de site, Decombaz, for the patrol. He's by himself, probably GHH will go with him.

Camera PM25 entrance not working LHC 8:30 meeting 4 27/04/2011

Tuesday 26 th April – afternoon shift 16:02 Start ramp – 480 bunches 16:07 beams dumped by operator - most BPM crates for B2 were down – flying blind  called Lars Jensen mostly B2 front-ends crashed or noted with 'out of memory' Lars recommended to reboot the affected front-ends and to continue. Possible concentrator/cmw problem Back round  Switch LHCb polarity  18:43 dumped to allow access for cryo to de-ice a filter  21:45 pilots back in after access and pre-cycle  22:55 Start ramp  23:30 Stable beams # LHC 8:30 meeting 27/04/2011

#1739 LHC 8:30 meeting 27/04/ e32 cm -2 s -1 in Atlas

1739 – beam 1 - LHC 8:30 meeting 27/04/2011

1739 – beam 2 – flat top LHC 8:30 meeting 8 27/04/2011

Beam intensity evolution LHC 8:30 meeting 9 27/04/2011

This morning 07:08 Cryo maintain lost - caused by fault on cooling of turbine – fast recovery foreseen A problem with a PXI that controls the motors of 2 tertiary collimators in IP1-L – being checked now Injection adjustment (Verena & Malika)  Injection oscillation out of tolerance Dynamic b3 correction deployment  test ramp Physics with 624 bunches LHC 8:30 meeting 27/04/2011