Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.

Slides:



Advertisements
Similar presentations
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Advertisements

Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
COUNTY OF LOS ANGELES FIRE DEPARTMENT FORESTRY DIVISION (323)
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Titusville to Edgewater Bike Loop PD&E Study
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
West Contra Costa Unified School District
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Project Location Map Contents of Presentation Welcome Project Location Map Contents of Presentation Agency Involvement & Responsibilities Project Purpose.
STA Safety Project PID #76439 December 12, 2006.
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Appeal Tuesday, January 14, Background Appeal Grounds Design Modification Options Community Feedback Staff Recommendation.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Environmental Impact Report (EIR) Update May 2, 2016.
Planning & Community Development Department Contract to provide Environmental Consulting Services for the Rehabilitation and Reuse of the Pasadena YWCA.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Planning & Community Development Department Rose Bowl Aquatic Center Master Plan 360 North Arroyo Boulevard Predevelopment Plan Review PPR City.
Holly Street Bridge Retrofit and Rehabilitation Project
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
Project Status & Right-of-Way Acquisition
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Little Rapids Habitat Restoration St
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Facilities Report to the Buffalo State College Senate May 6, 2016
Overview What is the CEQA environmental review process?
Construction Management & Inspection
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Butte County Board of Supervisors September 27, 2016
Constructed c.1932 Designated as a Master Plan Historic Site in 1979 Significant for commercial and social history related to the Depression A unique.
Brackish Water Desalination Project Draft EIR
Walker Street Reconstruction Project 25% Design Public Hearing
I Street Bridge Replacement Project
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Item 6b

Project Vicinity Park Ave Bridge

Existing Park Avenue Bridge

Project Background & Benefits Vitally important bridge as the only access to/from Little Balboa Island Originally built in 1930 and rehabilitated numerous times Full replacement necessary due to advanced deterioration of structurally critical elements Benefits include: Improved traffic and pedestrian access and safety Improved boat access under the bridge structure with fewer columns State of the art bridge construction

New Bridge Structure Replaces existing 85-year old bridge Widens both traffic lanes from 10-ft to 11-ft Widen both sidewalks from 4-ft to 6-ft Reconstruct ADA-compliant pedestrian ramps Reduce the number of bridge piles in Grand Canal Maintain architectural character of existing bridge

End of Presentation  Item 6b, Application No  Park Ave Bridge Replacement  City of Newport Beach

Back-up slides

Temporary Bridge at Balboa Avenue Reasons supporting this as the best construction approach: Two-lanes of traffic provided through construction phase Unimpeded emergency response access Minimize traffic related impacts Minimize construction impacts in environmentally sensitive Grand Canal Avoid higher risks associated with staged construction approach Confined work area having to maintain vehicle/pedestrian access Structural viability of 85-year old bridge through partial removal

CEQA Compliance Initial Study/Mitigated Negative Declaration (IS/MND) prepared pursuant to CEQA Guidelines IS/MND circulated for 30-day public review period October 6, 2014 through November 5, 2014 IS/MND supported by detailed air quality, noise, historical, hazardous materials, water quality, hydraulics and traffic technical studies All impacts associated with the project were determined to be mitigated to below a level of significance Six comment letters received (RWQCB, OC Public Works, California Cultural Resources Preservation Alliance, and adjacent home/business owners) City prepared written Responses to Comments; no comments affecting or altering conclusions within the IS/MND were raised

Project Funding & Schedule Highway Bridge Replacement & Replacement Program (Federal Funds) Total Project Funding: $4,414,000 Environmental & Engineering: $886,100 Construction: $3,528,000 Schedule: Approve Environmental Document – November 2014 Obtain Coastal Commission Permit Approval – September 2015 Complete Final Design – September 2015 Construction – January 2016 to December 2016