Tue 9/8 – Wed 10/8 Stable beams #2010 18:18 RQT12.R7B1 trip. End of STABLE BEAMS #2010 - ~86 pb -1 in ~19 hours 20:30 No beam from PSB (RF problem in ring.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
MP3 List of main Issues during March 2010 MP3 - Team.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Production running 1 pb-1Lost to Mon h2062e32EOF studies Tue h17.152e32UFO Q8.L5 Tue h e32OP request Thu h e32OP.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Machine Coordinators: G. Arduini, J. Wenninger
Saturday :12 Stable beams fill 3351 Initial luminosity
Friday 15th June 01:11 Injection.
Wednesday September 14th
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Week 32 Started with luminosity production…
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 16 G. Arduini, J. Wenninger
LHC Morning Meeting - G. Arduini
Friday 31st August & night
LHC Morning Meeting - G. Arduini
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Finally.... We had to wait a long time.... We had many problems....
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday 24 October hours of 25ns MD
LHC Morning Meeting - G. Arduini
07/08/2010 Fill #1264 dump at 02:14:38.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Tuesday 20 September 2011.
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Wednesday 26 October 2011.
Wednesday 14:30 Fill 2011 dumped.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Mon 8/8 – Tue 9/8 Stable beams #2009
Tuesday
Presentation transcript:

Tue 9/8 – Wed 10/8 Stable beams # :18 RQT12.R7B1 trip. End of STABLE BEAMS # ~86 pb -1 in ~19 hours 20:30 No beam from PSB (RF problem in ring 4) Loss maps at injection with nominal bunch while waiting for RF repair in PSB 01:30-03:30 Setting-up beam in the PS Booster after repair. Lengthy injection (injection oscillations B2, several injection inhibits due to poor beam quality, B1 injection kicker pulse length check). An injection loss event being investigated 05:49 STABLE BEAMS # initial luminosity 2.1e33

Sequence of observations/registrations: 1)At : Timber reports all OK for the last time before event (I_DCCT (QPS) is stable) 2)At : The power converter receives a power abort command from EXTERNAL source and starts switching-off (from  -73 A) 3)At : First indication from Timber that the circuit current has started to decay. Large current spike observed on I_A (faster sampling rate) of power converter (but not on I_meas as sampling is not fast enough) 4)At : PIC assigns its first time stamp of the event– to QPS 5)At : Timber shows inconsistent current reading I_DCCT (QPS) Other remarks: - No Post-Mortem was delivered by the quench detector at any moment, but should have been as U_RES went largely outside the quench detection window during the first part of the current decay - All QPS flags remained ‘green’ in PVSS - Some minutes after the event the QPS controller went into stalled mode and had to be power cycled and reset before returning to operational conditions - Monitoring was on board A Outstanding questions: - Did the QPS system trip before or during the current decay ? - Why was no Post-Mortem files delivered ? Can a file be recuperated from the DQAMG-A ? - The quench detection system is located in RR77 – an area with some SEU activity. RADMON counts to be verified (M. Calviani) at the moment of incident. An SEU event cannot be excluded. However, it does not have the same signature as the event on RCBXV3.R1 in UJ16 (only the calculated dI/dt figures turned abnormal for 10 ms). -The RQT12.R7B1 was set to monitor board B to increase the chances of observation in case of repetition. RQT12.R7B1 trip (Knud, Jens)

End of fill #2010

Bunch population still at 1.26x10 11 p. Stable Beams #2011

MKI Temperatures (M. Barnes) Temperature MKI above injection interlock level in point 8  Rise-time data at 61C measured on MKI8-D (highest temperature we have data at to date). There is no evidence that the ferrite is at its Curie temperature, so 61 0 C measured is safe here  Increase of the intlk level to 62 0 C possible.

Injection losses At 03:00 beam dump at injection of B1. ALICE triggered + losses at TCTH.R2. No extraction from SPS at that time that is why no beam visible in the BTVDD. But what dumped the beam? Most likely explanation (tbc): satellites behind the circulating beam or bad timing of the kicker

Injection losses

SPS magnet: vacuum leak deteriorating  Another leak test performed and faulty magnet identified  Magnet is going to be replaced on Thu morning starting at 07:00 (16 hours) We will try to be in physics by that time. Interventions and most urgent accesses if the fill is dumped during the SPS intervention: – Auto reset for cryo-valves in IR5/7 (3 hours – no access) – Swap Board A  B for nQPS QF/QD Sector 81 – Oil leak warm compressor point 4 – require reconfiguration of point 4 (2-3 hours stop) – MKI2 (access – 2 hours) – RF Pending

Fill Overview FillPhasePeak L [10 33 cm -2 s -1 ] Length [h] Int. L [pb -1 ] Dump cause 2009STABLE Sector 81 trip (QPS quadrupoles) 2010STABLE RQT12.R7B1 (QPS-SEU?)

Working point