Update on TMCI measurements March 5, 2008 G. Arduini, R. Jones, E. Métral, G. Papotti, G. Rumolo, B. Salvant, R Tomas, R. Steinhagen Many thanks to the.

Slides:



Advertisements
Similar presentations
SPS impedance work in progress SPSU meeting August 11 th 2011.
Advertisements

Impedance of SPS travelling wave cavities (200 MHz) A. Grudiev, E. Métral, B. Salvant, E. Shaposhnikova, B. Spataro Acknowledgments: Erk Jensen, Eric Montesinos,
Space Charge meeting – CERN – 09/10/2014
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Introduction Status of SC simulations at CERN
Particle Studio simulations of the resistive wall impedance of copper cylindrical and rectangular beam pipes C. Zannini E. Metral, G. Rumolo, B. Salvant.
Laslett self-field tune spread calculation with momentum dependence (Application to the PSB at 160 MeV) M. Martini.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
N. Biancacci MSWG CERN PS impedance localization update Transverse impedance localization method Application to the PS Conclusion and Outlook.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Update of the SPS transverse impedance model Benoit for the impedance team.
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
1 Transverse Mode Coupling Instability in the CERN SPS: Comparing HEADTAIL Simulations with Beam Measurements Benoit Salvant (EPFL / CERN Switzerland)
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
11 Update of the SPS impedance model G. Arduini, O. Berrig, F. Caspers, A. Grudiev, E. Métral, G. Rumolo, B. Salvant, E. Shaposhnikova, B. Spataro (INFN),
Update on injection studies of LHC beams from Linac4 V. Forte (BE/ABP-HSC) Acknowledgements: J. Abelleira, C. Bracco, E. Benedetto, S. Hancock, M. Kowalska.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Instability rise-time far above the TMCI threshold: Comparison between simple theory, MOSES and HEADTAIL E. Benedetto, E. Metral Acknowledgements: G. Rumolo,
RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group,
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Main activities and news from the Impedance working group.
Frank Zimmermann, material for LTC coherent tune shift due to collimator impedance - its dependence on gap size, bunch length, chromaticity, beta function,
1 Update on the impedance of the SPS kickers E. Métral, G. Rumolo, B. Salvant, C. Zannini SPS impedance meeting - Oct. 16 th 2009 Acknowledgments: F. Caspers,
Main Activities and News from LHC e-Cloud Simulations Frank Zimmermann ICE Meeting 8 June 2011.
Three examples of application of Sussix 1)Data from simulations  sensitivity 2)Data from measurements  frequency resolution.
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Longitudinal Painting S. Hancock p.p. G. Feldbauer.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
Elias Métral, LIS meeting, 29/01/2008 1/26 GAMMA TRANSITION JUMP FOR PS2 W. Bartmann, M. Benedikt, E. Métral and D. Möhl u Introduction with the case of.
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
HEADTAIL simulation during the accelerating ramp in the PS S. Aumon - EPFL & CERN Acknowledgement to B. Salvant, G. Rumolo.
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Longitudinal impedance of the SPS
Space charge studies at the SPS
Follow up on SPS transverse impedance
Longitudinal beam parameters and stability
Proposals for 2015 impedance-related MD requests for PSB and SPS
Benchmarking the SPS transverse impedance model: headtail growth rates
Upcoming longitudinal MDs
News on the TMCI and SPS transverse impedance
Update of Damping Ring parameters
Summary of Space-Charge Measurements, 2011
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
E. Métral, G. Rumolo, R. Tomás (CERN Switzerland), B
Status from the collimator impedance MD in the LHC
CERN / GSI Meeting on Collective Effects in CARE-HHH APD BEAM’07
W. Bartmann, M. Benedikt, E. Métral, D. Möhl, G. Rumolo and B. Salvant
LHC impedance: Comparison between phase 1 and IR3MBC – follow-up
News on TMCI in the SPS: Injecting high intensity bunches
Simulating transition crossing in the PS with HeadTail
Observation of Transverse Mode Coupling Instability at the PS and SPS
SPS collective effects Hannes, Gianni, Giovanni, Benoit, Yannis
CERN-SPS horizontal instability
2008 MDs Helmut Burkhardt, Rama Calaga, Wolfgang Hoefle, Riccardo de Maria, Elias Metral, Giulia Papotti, Giovanni Rumolo, Benoit Salvant, Bruno Spataro,
TMCI for LHC collimators (very preliminary results)
Presentation transcript:

Update on TMCI measurements March 5, 2008 G. Arduini, R. Jones, E. Métral, G. Papotti, G. Rumolo, B. Salvant, R Tomas, R. Steinhagen Many thanks to the OP teams, A. Bland, H. Burkhardt, T. Bohl, E. Chaposhnikova, E. Genuardi

Agenda Where we are Issues –Longitudinal aspects –Fitting the slope of the tune shift with intensity What to do next

MD on November 4th, 2007 Observing all the modes 2 intensity scans LOD = - 4 (Q-Qy)/Qs Bunch population (10 10 p/b)

MD on November 4th, 2007 Observing the main mode 2 intensity scans LOD = - 4 (Qmax-Qy)/Qs Bunch population (10 10 p/b)

HeadTail Simulations Fitting the measured tuneshift slope with intensity with headtail simulations (flat chamber, non linear bucket, wake field recalculated at every turn): Headtail parameters : ZyBB = M  / m QBB=1 fresBB=1.3 GHz Rms bunch length = m norm. mom. spread= Voltage = 1 MV long emittance = 0.2 eVs

Where we are Fitting the measured tuneshift slope with intensity with headtail simulations: 4 nov measurements HeadTail simulations 3 main issues  fitted BB impedance with HeadTail = M  /m (instead of 23/1.234)  values for the longitudinal parameters in the simulation?  similar behaviour but at about twice the bunch population

Where we are Fitting the measured tuneshift slope with intensity with headtail simulations: Headtail parameters : ZyBB = M  / m QBB=1 fresBB=1.3 GHz Rms bunch length = m norm. mom. spread= Voltage = 1 MV emittance = 0.2 eVs

Issues for simulating the SPS bunch with Headtail What longitudinal parameters should we put in the headtail simulations? –PS Beam is not matched to the SPS bucket (we could not find a satisfactory matching voltage, and filamentation is clearly visible on the HeadTail monitor on some traces) –Tomoscope before rotation in the PS gives 0.15 eVs –Bsm before rotation gives 0.26 eVs –The rms bunch length in the SPS measured with the HeadTail monitor is 0.21 m (0.7 ns rms at injection) HeadTail monitor 

Analysis of the MD from November 4 Longitudinal emittance as measured in the PS BSM 

Analysis of the MD from November 4 Longitudinal emittance as measured in the PS Tomoscope 

Issues for simulating the SPS bunch with Headtail For a longitudinal emittance of 0.21 m (value given by the HeadTail monitor), the bucket is rather full… Therefore we are in the non linear bucket regime, and it is more tricky to find the matching parameters Rms bunch length = 0.05 m Rms bunch length = 0.21 m

Issues for simulating the SPS bunch with Headtail Let’s check the headtail non linear bucket model with the linear bucket at small rms bunch length (0.05 m). Intensity Scan at low intensity ( to p/b) to prevent modes from shifting non linearly Linear bucket, non linear bucket, frozen and not frozen simulation results are superimposed on the following graph Round pipe Flat pipe

Issues for simulating the SPS bunch with Headtail Effective impedance deduced from the tuneshift (mode m=0) slope with intensity. (Sacherer formula) Round pipeFlat pipeFlat/round Headtail input 17.8 M  /m Expected from theory Z Z *  ²/ Headtail output Sacherer Parabolic 16.1 M  /m20 M  /m Headtail output Sacherer Gaussian 14.3 M  /m17.7 M  /m Parabolic : Gaussian : (from Elias) (from Helmut and Giovanni)

What to do next ? On the MD data 2007 –Choose the right longitudinal parameters for the headtail simulations (matched with 0.15 eVs, despite the measured bunch length? 0.15 eVs with 0.21 m not matched? None of the above?) –Perform HeadTail simulations with the chosen parameters, and include space charge. –Assess the starting distribution (bunch rotation in headtail?) –Can we crosscheck the HeadTail monitor bunch length with the scope in the Faraday cage? –Compare sussix algorithm to NAF algorithm (from Yannis), and understand the low phase difference value given by sussix for the phase advance between BPM1 and BPM2. MD in 2008? –As Gianluigi found out, BPM1 and BPM2 are not at 90° phase advance but 45°  possibility to improve the efficiency of the frequency analysis by using BPM3? –Can we monitor the longitudinal emittance in the SPS? –Is there a way to avoid the mismatch at injection?