Cooling Loop Update ATLAS W4 Sheffield 3-2-2016 Richard French The University of Sheffield + all UK contributors.

Slides:



Advertisements
Similar presentations
Finally, a compressed air piping system so simple…it’s EZ!
Advertisements

Restructure of WP4 – provisional ideas and numbers to promote discussion Ian Wilmut.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
Cooling connections in the service gap Richard French The University of Sheffield.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
WP4 cooling update RAL 6 th Oct Welding – high repeatability statistics Bending – 2.275mm OD trials in Titanium with comparison of 1.8” OD bend.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
MICE Target Mechanical Design l Contents »Status of modelling and drawing »Work being undertaken at RAL on shaft and bearing prototypes »Procedure for.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report September 28, 2000 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber,
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Update February, 2001 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber, F.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool June 2012 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
1 ATLAS Upgrade WP4 Face to Face meeting at Edinburgh - 11 th Jan 2011 WP4 task 2: Cooling activities Richard French – The University of Sheffield.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Cooling loops for prototype staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
WP4 – Plans for next 6 months
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
1 Overview Stainless Steel to Titanium joining (temp connection) Copper to Titanium (pressure drop measurements) ATLAS Upgrade dissimilar metal joining.
1 ATLAS Upgrade WP4 Face to Face meeting QMUL 9 th May 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool 10 th November 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort December, 2001 N. Hartman,
Strategies to Improve Electron Beam Weld Quality for ISIS TS2 Targets Arghya Dey and Leslie Jones Target Design Group ISIS, STFC, RAL.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
Results of short module and qualification strategy
1 ATLAS Upgrade WP4 Face to Face meeting Oxford 14 th May 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John.
Straw man layout for ATLAS ID for SLHC
UK Knowledge of Pipe Bending and Pressure Testing Martin Gibson (RAL) Pipe bending by Ian Lancaster University Connector welding by.
Service channels between Tracker and PP1
Ti/SS transitions A.Basti INFN-PISA*
Service channels between Tracker and PP1
MICE Target Mechanical Design
Pipe Bending Ian Mercer, Harald Fox, Richard French.
Future tube procurement Richard French
Cooling loops for prototype Staves
Mechanics: (Tim).
WP4 – Plans for next 6 months
Services Layout – Update
GE alternative and outcome
Presentation by: Paul Kemp-Russell.
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Undulator System Components Status Dean Walters
LCLS Vacuum System Plans (July 07)
Presentation transcript:

Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors

Stave Core Cooling Circuit Deliverable is 12 Stave Cores in total for 2yr bridge – deemed not enough to be useful (WP ). Is this a 1.3m or 1.4m long item? To mitigate the inevitable delay of a useful decision…….. Sticking with 1.3m – 2.275mm x 0.125mm CP2 Ti tube – Build only 2x new stave cores at 1.3m with isolators now ready for end Feb/March 2016 – This uses last remaining parts (isolators in short supply). NP nm Stave Cooling Assembly (Peter Sutcliffe 12/06/2014)

Stave Core Cooling Circuit 30x new electrical isolator assemblies arrives mid-end March to allow production of new stave cores. From reception of new isolators, produce and test all 12 cooling circuits in for July 2016 IN THE PERIOD MARCH – JULY 2015 Establish: Electrical Isolator development Begin capillary connection development + Trial new robust weld tooling Examine low cost fitting alternatives (pg8) Caveat = We still do not have any of the proposed thicker walled tube to work with!!

Prototype Electrical Break Final design iteration for test items 2 Titanium Caps & ID Alumina ceramic sleeve Vac Brazed into cap Cap vac brazed to tube Initial Evaluation Mechanically robust Standard component off the shelf for us to order Fast turnaround Leak rate high 10-9 mBar ls Pressure handling = 150 Bar Low statistics = 50 items only

Design / Costs: Prototype Isolator 2.2 to 1/8” OD Prototype short section: Note – no VCR fitting, this was brazed onto a short tube stub and then TIG welded to the isolator. This attracted both additional costs and labour. Only 20mm of useable tube was sticking out from the cap. This caused problems for TIG welding preparation and the weld head clamping. Weld prep allowed only one shot at welding correctly due to short tube length. Increasing tube length reduced “furnace optimisation” eg, we could not pack as many units into the oven per run therefore increasing cost. There was nothing wrong with this and it worked well but uses 2.275mm to 3.175mm OD NOT 2.275mm to 2.500mm OD Cp2 Ti tube. Costing based from quotation on 02/7/2013 ex vat ITEMQTYUNIT £Delivery£ Total Isolator w6, Brazing W Fitting W6, FTE Eng FTE Tech CoC25.00 Shipping25.00

Isolator production refinements in the 2year bridge Process not yet fully optimised for high volume production but with careful QA the physical items is acceptable, maybe not the cost (per unit cost has little reduction in high volume)? What do we look for? Main worry is embrittlement (2x furnace (or heat) cycles for 4 brazed joints) Furnace cycle #1 = Alumina Ceramic to Titanium cap (this is fine) Furnace cycle #2 = Tube to cap (needs better refinement (understood and will implement). WHY? = TEMPERATURE = ~780°C, which is borderline/just below Ti oxidisation temp. Statistics - 50 produced: 4 used for DT and NDA, 6 failed visual inspection = 40 GOOD components 3 Isolators now remain used but re-workable = 1 stave + ½ spare. Next batch will reduce the heat cycles from 2 to 1 (less oxidisation and contamination of Titanium). To refine and therefore reduce production costs we could explore: EB welding of the Ti tube to the Ti cap & VCRs then make only one ceramic vac brazed joint This means we can use a lower temperature braze alloy to avoid Ti oxidisation moving further away from “dangerous” temperature range (>800°C) for Titanium (new braze is at 580°C). This gives a better (unaltered) temper tube for the TIG welding operations & bending. This allows us to maximise furnace cycles for different ceramic OD’s (Strips and PIXEL EC’s). Refinement still needed: High braze alloy flow (aesthetics issue, not functionality)

Design / Cost Options : 4mm OD Ceramic (large) Full assembly inclusive of VCR fitting. Note – this U section and lengths are designed only for vacuum brazing of fittings and isolators. One weld to the stave core is possible. 16mm distance is too short to allow TIG welding as this would locate the weld in the HAZ of the tube. Position & accuracy of U bend must checked post brazing (annealing tube through heat cycle of furnace) as bend will relax. Could reduced unit cost by £30 ea with tests to braze full assembly in one shot. More trials needed = +£3/5k! Costing based from quotation on 02/12/2015 ex vat QTYUNIT £Delivery£ Total w16, w289, Optional Cert of Conf25.00 Tooling Cost <415, Tooling Cost >10007,500.00

Design / Cost Options : 4mm OD Ceramic (large) Part assembly excluding VCR fitting. Note – this U section and lengths are designed only for vacuum brazing of fittings and isolators. One weld to the stave core is possible. 16mm distance is too short to allow TIG welding as this would locate the weld in the HAZ of the tube. We could (if between a rock and a hard place) use cheaper 316L 2.5mm ID compression fittings then convert to a VCR or threaded adaptor only ~£1k less £ than full assembly = significant effort penalty Costing based from quotation on 13/11/2015 ex vat QTYUNIT £Delivery£ Total w15, w281, Cert of Conf25.00 Tooling Cost <415, Tooling Cost >10007, £3.60ea = Not economically viable