Preparations for working on Station 1 November 22, 2005.

Slides:



Advertisements
Similar presentations
Archiving NCSX Construction Information Using the PPPL Windows Based Server.
Advertisements

Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
More CMM Part Two : Details.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Release & Deployment ITIL Version 3
Effective Methods for Software and Systems Integration
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
From Research Prototype to Production
 Journeyman  Management  Specialization  Teaching  Owning a business.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
CMM Level 2 KPA’s CS 4320 Fall Requirements Management 1 Goals: – System requirements allocated to software are controlled using a baseline for.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Common Test Project CMU Presentation Jason Weighley Manager Test Engineering.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
New Reactor Construction Inspection
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
NCSX NCSX Project Meeting Wayne Reiersen 15 December 2004.
NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
How the NCSX Project Does Business
Project Management Why do projects fail? Technical Reasons
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
WEEK 3 Project Planning.
CSC 480 Software Engineering Team Issues. Essence of a Successful Team To be successful, teams must  Plan their projects  Track their progress  Coordinate.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
Accelerator Readiness Review October 31, 2006
CSC 480 Software Engineering
Software and Systems Integration
Software and System Delivery
Lesson 1- Operations Management
Manufacturing Engineering (ME)
Software Engineering I
DOE Review of the LCLS Project October 2006
Software Reviews.
Presentation transcript:

Preparations for working on Station 1 November 22, 2005

Topics Roles and responsibilities Documentation Procurements Schedule Safety

Field period assembly is a complex activity involving many jobs and job managers VV Final Design (1203) Goranson Non-VVSA Procurements (1204) Dudek VVSA Fabrication (1250), FPA Oversight and Support (1802), Field Period Assembly (1810) Viola FPA Tooling and Constructability (1803) Brown FPA Measurement Systems (1804) Raftopoulos Stellarator Core Management and Integration (1901) Nelson Magnetic Diagnostics (3101), Dimensional Control (8205) Stratton A clear and common understanding of roles and responsibilities is needed

Paul Goranson Cog engineer for VV Systems (WBS 12). Responsibilities –developing the design, –providing procurement packages (specs and drawings), and –communicating design intent on assembly, installation, and test issues

Larry Dudek Job Manager for non-VVSA procurements (Job 1203) and the RLM for On-site Fabrication which includes Coil Mfg and FPA. Responsibilities –Tracking and ordering or fabricating all non-VVSA parts and materials. Ditto for FPA tooling and fixtures. –Notifying cognizant design personnel when late procurement packages threaten impacting production –As RLM, ensuring that on-site work is done safely, safely, safely and meets technical, cost and schedule objectives

Mike Viola Tech rep for VVSA fab (Job 1250) and Job Manager for FPA (1802, 1810). Responsibilities –Developing a resource-loaded plan for all FPA work and managing to that plan to meet technical, cost, schedule, and safety objectives –Coordinating development of procedures and training for personnel performing FPA –Implementing practices and safety controls to ensure the work gets done safely, safely, safely –Serve as lift engineer as required for FPA and Coil Mfg

Tom Brown Job Manager for FPA Tooling and Constructability (1803). Responsibilities –Develop a resource-loaded plan for FPA tooling and fixtures and managing to that plan to meet technical, cost, schedule, and safety objectives –Design tooling and fixtures for FPA –Provide technical documentation to support procurement and on-site fabrication activities –Define the sequence by which FPA will be performed consistent with tooling and fixtures, design intent, and safe practice

Steve Raftopoulos Lead Metrology Engineer and Job Manager for FPA Measurement Systems (1804). Responsibilities –Provide the metrology hardware and software best suited for NCSX needs –Develop expertise and provide training for field personnel in their use –Develop metrology procedures –Perform measurements as required –Archive metrology data and make it available to the project

Brent Stratton Dimensional Control Coordinator and Job Manager for Dimensional Control (8205). Responsibilities –Develop dimensional control plan which prescribes how dimensional control objectives will be met in FPA –Review procedures and measurement results to assure that the dimensional control plan is being properly implemented.

Brad Nelson Job Manager for Stellarator Core Design and Integration (1901) and RLM for Stellarator Core Design and Procurement. Responsibilities –Develop specifications and assembly drawings that define the end product and inspections and tests for each FPA Station –Ensure that all WBS 1 design and procurement activities are being managed to support technical, cost, schedule, and safety objectives

Documentation Manufacturing Facility Operations Plan FPA MIT/QA Plan Procedures –Overarching procedure for Station 1 –Supporting procedures (mounting, initial metrology, layout of flux loops, H/C tubes, installing flux loops, etc.)

Schedule PMB (Strykowsky) lays out a realistic plan for accomplishing the work In order to meet those schedule objectives, we want to be working to earlier dates so that when we hit the speed bumps, we can still meet or beat the dates in the PMB Dudek will be maintaining a more detailed schedule that we will work towards and report against at weekly or bi-weekly meetings. The purpose is to resolve issues as they arise.

Safety Safety controls and practices need to be established for FPA Coil manufacturing provides a good pattern A successful ACC review is required before the RLM can authorize operation for each station