Lead from the front Texas Nodal 1 TPTF Update for TAC February 7, 2008 Trip Doggett.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 TPTF Update for TAC December 4, 2008 Joel Mickey
Advertisements

Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
1 Texas Nodal Texas Nodal Program Implementation TPTF June 6, 2006 Agenda.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 5, 2009 Joel Mickey
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Market Implementation Board Presentation October 1 Texas Nodal Market Implementation ERCOT Board of Directors Meeting Program status.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 6, 2008 Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
Texas Nodal Timeline Options, TPTF Jul 11, Timeline Options Trip Doggett TPTF
Lead from the front Texas Nodal 1 TPTF Update for TAC April 4, 2008 Trip Doggett.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
September 8, 2008 TPTF Nodal Core Projects Updates Nodal Project Managers.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 5, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Lead from the front Texas Nodal 1 TPTF Update for ROS October 16, 2008 Stacy Bridges
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
9/12/2006 TPTF MIS / Training Status & Update Pat Harris A portal is a web site or service that offers a broad array of resources and services such as.
Lead from the front Texas Nodal 1 TPTF Update for TAC January 4, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC June 26, 2008 Joel Mickey.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC Nov 2, 2006 Trip Doggett.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 Texas Nodal EDS 4 Early Delivery System Plan TPTF May 22 nd, 2007.
August 27, 2007 Executive Committee Meeting Texas Nodal Program Update Jerry Sullivan.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 TPTF Update for TAC September 4, 2008 Stacy Bridges
Protocol Revision Subcommittee Tom Burke January 3, 2013.
April 1, 2008 TPTF Texas Nodal Market Implementation Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 TPTF Update for TAC August 2, 2007 Trip Doggett.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 2, 2008 Stacy Bridges
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
1 Readiness Scorecard – Market Readiness Series Brandon McElfresh Nodal Readiness and Transition January 28, 2010.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
TPTF Update for TAC October 5, 2007 Trip Doggett
Protocol Revision Subcommittee
Texas Nodal Program Current Schedule and Recent Changes
Presentation transcript:

Lead from the front Texas Nodal 1 TPTF Update for TAC February 7, 2008 Trip Doggett

Lead from the front Texas Nodal 2 Agenda ItemDescriptionPurpose 1. Meeting SummarySummary of recent TPTF activitiesFor review 2. Next MeetingsUpcoming activitiesFor review 3. Approval of Readiness Metrics Request TAC Approval for ERCOT to move forward with the metrics E2, E4, E7, E10, E11, E14, E15, EMO3, EMO8, MO3, C1 thru C10, IMM1, revised MP14, N4, R0, R1, R2, and R3 For Vote 4. Approval of Milestones Request TAC acknowledge TPTF completion of the following Milestones– INF Market Participant Identity Management Requirements v2.3 Requirements complete Enterprise Data Warehouse Conceptual System Design v0.95 complete INF Market Participant Identity Management Conceptual System Design v1.7 complete For Vote

Lead from the front Texas Nodal 3 Meeting Summary – January 7  Meetings January 7-8 and January  On January 7, TPTF discussed the following:  Nodal Program Update  Nodal Timeline Update  Flaw in TPTF voting spreadsheet related to Consumer Segment votes.  Draft NPRR to address issue with September 28, 2006 motion affected by flaw in vote tally  Extension of the current Service Level Agreement  On January 7, TPTF approved an extension of the effective period of Service Level Agreement for Nodal EDS Environments v2.2 through February 1, 2008 as modified by TPTF on January 7, The motion carried by roll- call vote, with 100% in favor and one abstention (Coral Power). All Market Segments were represented for the vote.  Zonal-to-Nodal Transition Protocol Transition Plan and possible synchronization issues with the EDS Sequence Timeline  EDW Update  EDW response to questions/requests raised during previous TPTF meeting

Lead from the front Texas Nodal 4 Meeting Summary – January 7 (continued)  On January 7, TPTF discussed the following:  Clarification Request - Nodal Protocols Section 3.2.3, System Adequacy Reports  Clarifications to information requested by the Medium-Term System Adequacy Report and the Short-Term System Adequacy Report  Quality Center Update  Congestion Revenue Right (CRR) Update  EDS - CRR Testing Market Participant Handbook v1.05  Explanation of Market Submission/Retrieval Items  Settlement issues for the Draft NPRR - PCRR Release Mechanism  On January 7, TPTF endorsed forwarding the draft NPRR on PCRR Release mechanism to PRS as modified by TPTF on January 7, The motion carried by roll-call vote, with 100% in favor and ten abstentions (LCRA, CenterPoint Energy, Luminant, AEP, Calpine, Coral Power, Exelon, Reliant, BP Energy, and CitiGroup). All Market Segments were represented for the vote.  Review proposed Market Rules changes to draft NPRRs:  Draft NPRR - Protocol Sections 4 and 6 Formula Clarifications and Related Revisions  Draft NPRR - Changes to Section 8 to Incorporate Role of TRE, the IMM, and the Concept of Market Compliance  NPRR093, Clarification to Definition of DUNS Number; Section 2, Definitions and Acronyms

Lead from the front Texas Nodal 5 Meeting Summary – January 8  On January 8, TPTF discussed the following:  MMS Update  MMS deferral items:  Changes that impact Market Participants  Changes that impact ERCOT Operations  Timeline for development and implementation of proposed changes  Status of current FAT  Development of draft NPRR for Disclosure of Resource Offers and Supply Curves in accordance with PUCT Rule (f)  Calpine proposal and Exelon comments regarding settlement issues associated with current limitation for combined-cycle configurations  INF Project  Review disposition of comments for the Market Participant Identity Management Requirements  On January 8, TPTF approved the INF Market Participant Identity Management Requirements v2.3 with the understanding that it will be updated to incorporate changes recommended by TPTF on January 8, The motion carried by roll-call vote, with 100% in favor and five abstentions (First Choice Power, AEP, City of Allen, City of Eastland, and Coral Power). All Market Segments, except Cooperative, were represented for the vote.

Lead from the front Texas Nodal 6 Meeting Summary – January 8 (continued)  On January 8, TPTF discussed the following:  Announce January 14 Subgroup to discuss DAM Participation issues for Self- Committed Generation Resources  Review remaining Readiness Metrics and market comments in the PMO Working Readiness Metric Inventory: ERCOT Internal Metrics  E2 - Verify ERCOT Performance Monitoring Test Plan  E4 - Transition Pricing Mechanisms  E7 - Validate EDW Access and Accuracy of Postings Required by the IMM and PUCT Rules Required by the IMM and PUCT Rules  E10 - Validate EDW Commercial Systems Access Accuracy  E11 - Validate EDW Compliance Data Access  E14 - Verify QSE Performance Monitoring Test Plan  E15 - Verify TSP Performance Monitoring Test Plan Energy Management Operations Metrics  EMO3 - Verify Outage Evaluation System Functionality  EMO4 - Run 7 Day Stability Test  EMO8 - Conduct EECP Test

Lead from the front Texas Nodal 7 Meeting Summary – January 8 (continued)  On January 8, TPTF discussed the following:  Review remaining Readiness Metrics and market comments in the PMO Working Readiness Metric Inventory (continued): Market Operations Metrics  MO1 - Operate DA Market for 7 Days  MO2 - Operate 7 Day market with RUC  MO3 - Verify Supplemental Ancillary Services Market (SASM)  MO6 - Verify DAM Ancillary Services Contingency Metrics  C1 - Contingency Plan Procedures for Weekly, Daily and Hourly RUC Failure  C2 - Contingency Plan Procedures for DAM Failure  C3 - Contingency Plan Procedures for ICCP Data Failure  C4 - Contingency Plan Procedures for SCED Failure  C5 - Contingency Plan Procedures for Key Settlement and Financial Transfer Processes  C6 - Develop Plan for SE Failure  C7 - Contingency Plan Procedures for a Backup Facility  C8 - Contingency Plan Procedures for Portal/API Failure  C9 - Contingency Plan Procedures for Site Unavailability

Lead from the front Texas Nodal 8 Meeting Summary – January 8 (continued)  On January 8, TPTF discussed the following:  Review remaining Readiness Metrics and market comments in the PMO Working Readiness Metric Inventory (continued): Contingency Metrics (continued)  C10 - Verify Single Point of Failure Recovery EMS/MMS/NMMS/CRR/COMS IMM Metrics  IMM1 - Market Monitor Systems Capability Overall Readiness Metrics  R0 - Market Participants Operations Readiness  R1 - Nodal Readiness Declaration  R2 - Develop Texas Nodal Market Launch Plan  On January 8, TPTF endorsed ERCOT moving forward with the following metrics as modified by TPTF on January 8, The motion carried by roll-call vote, with 100% in favor and no abstentions. All Market Segments, except Independent Generator, were represented for the vote.  ERCOT Internal Metrics  E2 - Verify ERCOT Performance Monitoring Test Plan  E4 - Transition Pricing Mechanisms  E7 - Validate EDW Access and Accuracy of Postings Required by the IMM and PUCT Rules

Lead from the front Texas Nodal 9 Meeting Summary – January 8 (continued)  January 8 vote continued:  Required by the IMM and PUCT Rules  E10 - Validate EDW Commercial Systems Access Accuracy  E11 - Validate EDW Compliance Data Access  E14 - Verify QSE Performance Monitoring Test Plan  E15 - Verify TSP Performance Monitoring Test Plan  Energy Management Operations Metrics  EMO3 - Verify Outage Evaluation System Functionality  EMO8 - Conduct EECP Test  Market Operations Metrics  MO3 - Verify Supplemental Ancillary Services Market (SASM)  Contingency Metrics  C1 - Contingency Plan Procedures for Weekly, Daily and Hourly RUC Failure  C2 - Contingency Plan Procedures for DAM Failure  C3 - Contingency Plan Procedures for ICCP Data Failure  C4 - Contingency Plan Procedures for SCED Failure  C5 - Contingency Plan Procedures for Key Settlement and Financial Transfer Processes  C6 - Develop Plan for SE Failure

Lead from the front Texas Nodal 10 Meeting Summary – January 8 (continued)  January 8 vote continued:  Contingency Metrics  C7 - Contingency Plan Procedures for a Backup Facility  C8 - Contingency Plan Procedures for Portal/API Failure  C9 - Contingency Plan Procedures for Site Unavailability  C10 - Verify Single Point of Failure Recovery EMS/MMS/NMMS/CRR/COMS  IMM Metrics  IMM1 - Market Monitor Systems Capability  Overall Readiness Metrics  R0 - Market Participants Operations Readiness  R1 - Nodal Readiness Declaration  R2 - Develop Texas Nodal Market Launch Plan  On January 8, TPTF discussed the following:  Market Rules Changes to language in Draft NPRR - Protocol Sections 4 and 6 Formula Clarifications and Related Revisions  On January 8, TPTF endorsed forwarding to PRS the draft NPRR for Protocols Sections 4 and 6 Formula Clarifications and Related Revisions as amended at TPTF on January 8, The motion carried by roll-call vote, with 100% in favor and three abstentions (Austin Energy, CenterPoint Energy, and AEP). All Market Segments, except Independent Generator, were represented for the vote.

Lead from the front Texas Nodal 11 Meeting Summary – January 21  On January 21, TPTF discussed the following:  Nodal Timeline Update  Nodal Program Update  Need for Draft NPRR for Scheduling and Operating Transmission Devices in the Nodal Environment  EDS Update  Testing concept for the 168-Hour Test  Recent activities and status for EDS testing  Review disposition of comments for the EDS - CRR Testing Market Participant Handbook v1.05  On January 21, TPTF approved the EDS - CRR Testing Market Participant Handbook v1.06 as submitted. The motion carried by roll-call vote, with 100% in favor and one abstention (Exelon). All Market Segments, except Independent Generator, were represented for the vote.  Verifiable Cost Subgroup Update  Recent activities for the Verifiable Cost Subgroup  DC Tie Subgroup Update  Recent activities from the Jan. 17th DC Tie Subgroup Meeting

Lead from the front Texas Nodal 12 Meeting Summary – January 22  On January 22, TPTF discussed the following:  Quality Center Update  Quality Center Reports  Software Problem Report (SPR) Defects  Project Artifact Schedule  Readiness Metric R3, 168-Hour System Stability Test and Trial Real-Time Settlement Metric to incorporate the following metrics:  EMO4 - Run 7 Day Stability Test  MO1 - Operate DA Market for 7 Days  MO2 - Operate 7 Day market with RUC  MO6 - Verify DAM Ancillary Services  Readiness Metric N4, Network Modeling Single-Entry  Revisions to Metric MP14, MP EDS-2 Trials Participation  On January 22, TPTF waived notice to vote for Metric MP14, MP EDS-2 Trials Participation. The motion carried by roll-call vote, with 100% in favor and three abstentions (City of Dallas, Town of Flower Mound, and Coral Power). All Market Segments were represented for the vote.

Lead from the front Texas Nodal 13 Meeting Summary – January 22 (continued)  On January 22, TPTF discussed the following:  On January 22, TPTF approved a Motion to request TAC approval for revisions to the Readiness Metric MP14, MP EDS-2 Trials Participation, as modified by TPTF on January 22, 2008, and to endorse ERCOT moving forward with the following Readiness Metrics:  R3, 168-Hour System Stability Test and Trial Real Time Settlement  N4, Network Modeling Single Entry  The motion carried by roll-call vote, with 100% in favor and five abstentions (LCRA, City of Dallas, Town of Flower Mound, Coral Power, and Exelon). All Market Segments were represented for the vote.

Lead from the front Texas Nodal 14 Meeting Summary – January 22 (continued)  On January 22, TPTF discussed the following:  IDA Punchlist Update  Review disposition of comments for the IDA Punchlist  Discuss the need for draft NPRR to address IDA Punchlist Items for MIS and EIP  Private Use Networks (PUN) Subgroup Update  Recent activities from the Jan. 11th PUN Subgroup Meeting  NPRR092, Remove Voltage Schedules Requirement  On January 22, TPTF approved a Motion to forward TPTF comments for NPRR092, Remove Voltage Schedules Requirement, to PRS for consideration. The motion carried by roll-call vote, with 100% in favor and no abstentions. All Market Segments, except Independent Generator, were represented for the vote.  COMS Project  Discuss clarifications for Emergency Operations Settlements  EDW Update  Disposition of comments for the EDW Conceptual System Design  On January 22, TPTF approved the EDW Conceptual System Design v0.95. The motion carried by roll-call vote, with 100% in favor and one abstention (Reliant). All Market Segments were represented for the vote.

Lead from the front Texas Nodal 15 Meeting Summary – January 22 (continued)  On January 22, TPTF discussed the following:  EDW Update (continued)  Section 8 Performance Reports Update  INF Update  Disposition of comments for the Market Participant Identity Management Conceptual System Design  On January 22, TPTF approved the INF MPIM CSD v1.7 as submitted. The motion carried by roll-call vote, with 100% in favor and one abstention (Reliant). All Market Segments, except the Independent Generator and Consumer segments, were represented for the vote.  Real-Time Reports (RTR) Project Update  Overview of the project  Announce Conceptual System Design (CSD) document in review  EIP Update  Market Participant Data Access  Update on the April 23, 2007 brochure "Understanding Market Participant Data Access“

Lead from the front Texas Nodal 16 Meeting Summary – January 22 (continued)  On January 22, TPTF discussed the following:  EIP Update (continued)  Disposition of comments for the External Interface Specification v1.07  On January 22, TPTF approved the EIP External Interfaces Specification v1.07 with the understanding that additional descriptions would be added to the document as discussed at TPTF on January 22, 2008 to address comments received during the document review ending January 16, 2008, including descriptions for: - Key string composition for Outage mRIDs - PriceCurve multi-hour block - Explanations for OutageIdent, OutageWarning, LastModifiedby, - LastModified, versionID, groupID, OutageNotes - Difference between newSchedule and Schedule  The motion carried by roll-call vote, with 100% in favor and two abstentions (CenterPoint and AEP). All Market Segments, except the Independent Generator, were represented for the vote.  Disposition of comments for the MIS External Interfaces Specification v0.35  Review NPRR090, Corrections of FIP-FOP in Energy Offers  On January 17, PRS voted to reject Sections and and to forward PRS Recommendation Report and IA to TAC

Lead from the front Texas Nodal 17 Meeting Summary – January 23  On January 23, TPTF discussed the following:  EDS testing issue:  How will the changes that are necessary for the EDS system be authorized so that EDS testing may proceed while corresponding documentation updates proceed through the governance process?  Proposed Revision for EMS White Paper:  High Dispatch Limit (HDL) And Low Dispatch Limit (LDL) During Startup and Ancillary Service (AS) Recall  On January 23, TPTF approved the updates in the HDL And LDL During Start up and AS Recall white paper v1.1 as submitted. The motion carried by roll-call vote, with 100% in favor and no abstentions. All Market Segments, except the Independent Generator, were represented for the vote.  Updates and new effective period for the Service Level Agreement for Nodal EDS Environments  On January 23, TPTF approved the updated SLA for Nodal EDS Environments v3.3 as modified by TPTF on January 23, The motion carried by roll-call vote, with 100% in favor and one abstention (CPS San Antonio). All Market Segments, except the Independent Generator, were represented for the vote.  Resource Registration Update

Lead from the front Texas Nodal 18 Meeting Summary – January 23 (continued)  On January 23, TPTF discussed the following:  Review disposition of comments for draft NPRR for PUCT Publication of Resource and Load Information  Revisions for configuration limitation in whitepaper IDA003, Combined-Cycle Unit Modeling in the Nodal Design  Discuss Market Participant Satisfaction Survey Results

Lead from the front Texas Nodal 19 Next Meetings  Next meetings  Monday February 4 through Wednesday February 6  Thursday February 21 and Friday February 22  Monday March 3 through Wednesday March 5  Thursday March 20 and Friday March 21

Lead from the front Texas Nodal 20 Next Meetings (continued)  On February 4 through February 6, likely topics include:  Nodal Program Update / Nodal Timeline Update  Discuss “pens-down” dates for systems functionality  Posting of Severity 1 & 2 defects  NMMS Update  Open Severity 1 defects for NMMS  Market Rules Update  Plan for “nodalizing” remaining protocols  EDS Update  Disposition of comments for the updates for EDS 3 SCED Market Participant Handbook v3.01  Approach to 168-Hour Test, including settlement issues  LMP reasonableness Daily report review  Process for authorizing temporary changes for EDS system while corresponding documentation proceeds through the approval process  Documentation synchronizations related to the recent formula revision in the EMS White Paper, HDL and LDL During Startup and AS Recall  Draft NPRR for , Continuous Telemetry of the Status of Breakers and Switches

Lead from the front Texas Nodal 21 Next Meetings (continued)  On February 4 through February 6, likely topics include:  MER Update  Review market feedback for the Market Participant Satisfaction Survey Results and Action Plan  EIP Update  Review updates for the MIS External Interfaces Specification  Current Day Report (CDR) Project Update  Disposition of comments for the Current Day Reports Conceptual System Design  INF Hardware Update  Outage Scheduler Update  Status of detailed design and FAT testing  Section 8 Update  Discuss NPRR097, Changes to Section 8 to Incorporate Role of TRE, the IMM, and the Concept of Market Compliance, including:  Language differences between NPRR097 and current Nodal Protocols  Activities of the Feb. 4 Task Force  DC Tie Update  Reasons for imports of emergency power over DC Ties in 2007  Draft NPRR for settlements of emergency power over DC Ties

Lead from the front Texas Nodal 22 Next Meetings (continued)  On February 4 through February 6, likely topics include:  EDW Update  COMS Project  Approach and possible NPRR language to clarify Emergency Operations Settlements  Discuss Fuel-Oil Index Price  Draft NPRR for incorporating PUCT Publication of Resource and Load Information  Recent revisions to the draft NPRR to reflect feedback from the market and from nodal projects  DAM Subgroup Update  Recent activities for the TPTF Subgroup for Self-Committed Resources in DAM  WMS Settlement Point Subgroup Update  Update on activities for the Jan 28th High-Low Task Force Meeting  Update on Combined-Cycle white paper discussion with IMM

Lead from the front Texas Nodal 23 Approval of Readiness Metrics  On January 8, TPTF voted to endorse ERCOT moving forward with the metrics E2, E4, E7, E10, E11, E14, E15, EMO3, EMO8, MO3, C1 thru C10, IMM1, R0, R1, and R2 as modified by TPTF on January 8, The motion carried by roll- call vote, with 100% in favor and no abstentions. All Market Segments, except the Independent Generators, were represented for the vote.  On January 22, TPTF approved a Motion to request TAC approval for revisions to the Readiness Metric MP14, MP EDS-2 Trials Participation, as modified by TPTF on January 22, 2008, and to endorse ERCOT moving forward with the following Readiness Metrics:  R3, 168-Hour System Stability Test and Trial Real Time Settlement  N4, Network Modeling Single Entry  The motion carried by roll-call vote, with 100% in favor and five abstentions (LCRA, City of Dallas, Town of Flower Mound, Coral Power, and Exelon). All Market Segments were represented for the vote.

Lead from the front Texas Nodal 24 Approval of Readiness Metrics (continued)  Request TAC approval for ERCOT to move forward with the metrics:  E2 - Verify ERCOT Performance Monitoring Test Plan  E4 - Transition Pricing Mechanisms  E7 - Validate EDW Access and Accuracy of Postings Required by the IMM and PUCT Rules  E10 - Validate EDW Commercial Systems Access Accuracy  E11 - Validate EDW Compliance Data Access  E14 - Verify QSE Performance Monitoring Test Plan  E15 - Verify TSP Performance Monitoring Test Plan  EMO3 - Verify Outage Evaluation System Functionality  EMO8 - Conduct EECP Test  MO3 - Verify Supplemental Ancillary Services Market (SASM)  C1 - Contingency Plan Procedures for Weekly, Daily and Hourly RUC Failure  C2 - Contingency Plan Procedures for DAM Failure  C3 - Contingency Plan Procedures for ICCP Data Failure  C4 - Contingency Plan Procedures for SCED Failure

Lead from the front Texas Nodal 25 Approval of Readiness Metrics (continued)  Request TAC approval for ERCOT to move forward with the metrics:  C5 - Contingency Plan Procedures for Key Settlement and Financial Transfer Processes  C6 - Develop Plan for SE Failure  C7 - Contingency Plan Procedures for a Backup Facility  C8 - Contingency Plan Procedures for Portal/API Failure  C9 - Contingency Plan Procedures for Site Unavailability  C10 - Verify Single Point of Failure Recovery EMS/MMS/NMMS/CRR/COMS  IMM1 - Market Monitor Systems Capability  Modified MP14, MP EDS-2 Trials Participation  N4, Network Modeling Single Entry  R0 - Market Participants Operations Readiness  R1 - Nodal Readiness Declaration  R2 - Develop Texas Nodal Market Launch Plan  R3, 168-Hour System Stability Test and Trial Real Time Settlement

Lead from the front Texas Nodal 26 TAC Approval of Milestones  On January 8, TPTF approved the INF Market Participant Identity Management Requirements v2.3 with the understanding that it will be updated to incorporate changes recommended by TPTF on January 8, The motion carried by roll-call vote, with 100% in favor and five abstentions (First Choice Power, AEP, City of Allen, City of Eastland, and Coral Power). All Market Segments, except Cooperative, were represented for the vote.  On January 22, TPTF approved the EDW Conceptual System Design v0.95. The motion carried by roll-call vote, with 100% in favor and one abstention (Reliant). All Market Segments were represented for the vote.  On January 22, TPTF approved the INF MPIM CSD v1.7 as submitted. The motion carried by roll-call vote, with 100% in favor and one abstention (Reliant). All Market Segments, except the Independent Generator and Consumer segments, were represented for the vote.  The Transition Plan says: “Any declaration of the accomplishment of a major milestone (business requirements, conceptual design, and successful completion of Market Participant testing) or a decision to proceed is contingent on the approval of both ERCOT and TAC.”  Request TAC acknowledge TPTF completion of the following Milestones –  INF Market Participant Identity Management Requirements v2.3 complete  Enterprise Data Warehouse Conceptual System Design v0.95 complete  INF Market Participant Identity Management Conceptual System Design v1.7 complete

Lead from the front Texas Nodal 27 Questions