TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/2015 1 Part I: Current Situation a) Overview of TE-ABT Systems & equipment b) Naming conventions used.

Slides:



Advertisements
Similar presentations
Daniel Schoerling TE-MSC-MNC 1 Review of AD-ELENA TL dipole Daniel Schoerling on behalf of WP 2.2 ELENA IIC meeting 27 th February 2014.
Advertisements

Naming Summary Functional, Items, Assets, Drawings.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Recommendations for CERN drawings EDMS
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
1 User’s perspectives on the management of Elements Important for Safety (EIS) AMMW - CERN Anne Funken, Marc Tavlet / BE-ASR-SU.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
CERN Methodology document R. Betemps / EDMS Doc N° Methodology Workshop Catia / Smarteam L’ ateliers de méthodologies Catia / Smarteam 10eme Forum.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
TBTS Test Program & Schedule G. Riddone
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Review of the processes released in the framework of the MMP Goran Perinić.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
Project Codes/Coding Pierre Bonnal Project Codes/Coding — P. Bonnal2 Three to tango Agenda “as-is” “should-be” “to-be”
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Decommissioning of CTF3 Nothing has been studied on the cost, manpower needed, environmental impact (RP) etc. This is just to raise some points that may.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
Naming conventions Sub-committee Meeting.
Wim Weterings Remy Noulibos
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
PS / Booster septa control
LIU – EVM status and next steps
Vacuum Controls Quality Management
LINAC4 ADVISORY COMMITTEE
M.J. Barnes : Canadian Involvement with LHC
ELENA installation and commissioning status
Automatic emittance measurement in the CERN 1.4 GeV Booster
AD consolidation activities in LS2
Configuration Management and Layout Database ELENA Project
prepared by R.A.Barlow 30/056/2016
The MTF adjusted system to meet Vacuum Group needs
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
ELENA Technical Coordination
AMMS-WG BE-BI and PPE 9/12/2018.
Update on the PSB Transfer Lines
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
Potential Use of PEP-II Magnets by Project X
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Presentation transcript:

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I: Current Situation a) Overview of TE-ABT Systems & equipment b) Naming conventions used in TE-ABT c)TE-ABT Functional Positions in Layout database d)TE-ABT Equipment codes e)Physical Component Names Part II: Issues a) Shared Systems & Equipment b) Impact of changes for databases (Edms, CDD, Smarteam, ABCAM, MTF, Infor…) c) Impact of changes in existing machine layouts d) Consistency with other machine systems Conclusion

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-a: Overview of TE-ABT Systems & Equipment ABT Kickers & Septa Systems Locations More than 60 systems without on going projects (like ELENA) ! (Courtesy T. Fowler)

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-a: Overview of TE-ABT Systems & Equipment Example: ABT Kicker Control system Official System Codes 1 Equipment Code per Function CKPCU

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-a: Overview of TE-ABT Systems & Equipment Official System Codes 1 Equipment Code per Function Example: ABT Kicker Fluid system FKOPG

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-a: Overview of TE-ABT Systems & Equipment Official System Codes 1 Equipment Code per Function Example: For a single ABT Kicker Magnet system MKMCB

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-a: Overview of TE-ABT Systems & Equipment Official System Codes 1 Equipment Code per Function Remark: Magnet is not part of the Power Converter System Example: ABT Kicker Power Converter system RKMSW

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-a: Overview of TE-ABT Systems & Equipment Official System Codes Example: In ABT systems we also have JKSBM JKPLF VKVTK TKSTR

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-b: Naming Conventions used in TE-ABT LHC-PM-QA-204: Equipment Naming Convention (Edms doc )Edms doc _ Equipment design : _ Drawings : _ Layout Component : _ Physical Component : _ Equipment design : _ Drawings : _ Layout Component : _ Physical Component : _ Layout Sub-Component : PS-C-QA-0001 : Equipment Naming Convention (Edms doc )Edms doc

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-c: TE-ABT Systems in Layout database Example: Functional position naming BE.KFA14L1consists of 4 modules as described (1 per ring) PS Booster - Period 14 Sub-Component : Switch functional position Functional position naming according to: PS-C-QA-0001 Edms doc (p14)

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-c: Explanation of Functional position name BE1.KFA14L1.RKTHY01M B = PS Booster machine (ensemble de l’accélérateur avec tous les systèmes et sous-systèmes) E = Ejection system (système principal de l’accélérateur) 1 = PS Booster Beam 1. KFA = Kicker Fast Action (fonction élément principal du système BE) 14 = period 14 (position dans la ligne optique de l’élément principal KFA dans l’anneau) L1 = section droite L1 de la période 14 (position dans la ligne optique de l’élément principal KFA dans l’anneau). R = Power Converter (système secondaire attache à l’élément principal KFH34 du système principal ER) K = Kicker (categorie de générateur ) THY = THYratron HV switch function (fonction de l’équipement du système secondaire) 01M = position 01M (position de l’élément secondaire dans le système secondaire) a

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-d: Equipment Codes in Accelerators Naming DB: ABT Equipment Codes Request (Edms doc )Edms doc ABT Equipment Codes in Naming DB:Naming DB Example : RKMSW R = Power Converter K = Kicker (Power Converter Category ) MSW = Main SWitch function

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-e: Physical Component Names PX.RKMSW012-CR P = PS area X = PS Complex machines R = Power Converter (système secondaire attache à l’élément principal KFH34 du système principal ER) K = Kicker (Power Converter Category) MSW = Main Switch function 012 = position 012 (slot sequence)a CR = CERN manufacturing Site = Switch Serial Number

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I-c: TE-ABT Functional Positions in Layout database PR.SD13 = Straight section 13 PE.KFA13 = Ejection Kicker 13 PE.KFA13-21.CK = Ejection Kicker Shared Control System PE.KFA13.MK = Ejection Kicker 13 Magnetic System PE.KFA13.MKKFA001 = Ejection Kicker 13 Tank Assembly 001 PE.KFA13.MKMAG001 = Ejection Kicker 13 Magnet Assembly 001 PE.KFA13.MKMOD001 = Ejection Kicker 13 Magnet Module 001 PE.KFA13.MKMCB001 = Ejection Kicker 13 Magnet Cnx. Box 001 Example: Magnet Module for a kicker in PS machine

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part 2-a: Shared Systems & Equipment: AD LNA _ 10 Power Convertors for AD + Elena _ 1 Power Convertor swap between AD & Elena _ AD & Elena Naming Conventions are #ADElena _ AD & Elena Racks Naming for kickers re-defined (ex: MYMCR-05) _ 3 kickers in AD + 1 Kicker in Elena

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part 2-b: Impact of changes in databases (Edms, CDD, Smarteam, Layout, Infor…) EDMS ABCAM SMARTEAM

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part 2-b: Impact of changes in databases (Edms, CDD, Smarteam, ABCAM,…) EDMS ABCAM SMARTEAM

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part 2-b: Impact of changes in databases ( Layout, Infor…) Layout INFOR_EAM

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Chicane BI-SMV BI-DIS BI.KSWs BI.TKSTR From Linac 4 PS Booster Rings BI.MSBSWBI.MSMIF Part 2-d: Consistency with other machine systems PS Booster Linac 4 Injection _ Change in a layout component name to a 5 letter component code (BI.MSMIF) instead of a 3 letter (BI.BHZ) component code removes « consistency » in the naming of an existing machine.

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part 2-d: Consistency with other machine systems AD and Elena Naming Conventions PS-C-QA-0001 : Equipment Naming Convention (Edms doc )Edms doc is used for AD machine LNA-QA-002 : Equipment Naming Convention (Edms doc )Edms doc is used for ELENA machine _ With shared systems, common existing naming conventions would be easier to implement. _ A new naming convention should cover all systems in order to avoid multiple naming systems

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Conclusion _ The 5 character equipment code defining on a function is OK for ABT (CKPCU, MSMIE, FKOPG, …) _ The replacement of an existing QAP naming scheme in existing machines would create considerable difficulties for ABT databases. Example: Changing layout code from BE1.KFA14L1.RKDSW001 to RKDSW.361.KFA14L1.DSW001 _ The layout component name is the biggest issue for standardisation in ABT _ Having the « K » letter for Kickers or « S » letter for Septa in the equipment codes makes it easy to create or retrieve them.

TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/