ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.

Slides:



Advertisements
Similar presentations
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
Advertisements

IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
ITIL: Service Transition
1 The Path to the Ph.D. in IS: Part 4, The Dissertation.
Avra Software CMPUT Process Quality and Software Assessment Case Study - slide#1©P. Sorenson and Amr Kamel Assessment Plan for Assessment Plan for.
Frequently Asked Questions (FAQ) prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9.
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
IEFC Workshop February 2010 H. Vincke for DGS/RP 1.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
SQA Architecture Software Quality By: MSMZ.
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Linac4 Risk Assessment Criteria and Methodology. Linac4 General Meeting – C. Rossi Definitions A risk is any event that could produce a change.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
TS, Length of YETS EYETS LIU & CONS Project
Safety during LS1 EN-STI Group meeting 1st February 2013 AP.Bernardes EN/STI.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
CERN Safety Coordination How it functions. CERN Safety: Who is Responsible?  Everyone present on CERN’s site, i.e. staff, members, and contractors alike.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
RSSO REPORT TE-MSC Andrea Musso – Virginia Prieto Hermosilla (RSSO’s) Acknowledgments - We wish to thanks: Michele Modena (Safety Link Person TE-MSC) for.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
RSSOs at CERN Prepared by Ans Pardons for the CERN RSSO training day With input from J. Pedersen.
Safety in LS1 Thomas Otto, TE DSO.
International Technical Safety Forum CERN, Geneva, Switzerland, April 12-16, 2010 CERN Safety Coordination How it functions M. Arnaud, C. Bedel, J. Etheridge,
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Radiation Protection computing tools Gérald Dumont HSE/RP.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Lowell Randel Global Cold Chain Alliance/ International Institute of Ammonia Refrigeration.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XI)
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
Welcome and News from EN and RSO Committee Ans Pardons 3 rd EN-RSSO Networking meeting, 22/6/2015.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LHC intervention scheduling with the Work Acceptance Tool
Health and Safety Self Assurance Toolkit 2017
PPIS TRAINING 2017.
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Safety in Construction and Upgrade Phases
East Area Renovation Project team #6 Launch safety agreement
Quality Assurance applied to Accelerator Safety
Session II: System authority for ERTMS 4RP Trackside approval
PPIS TRAINING 2017.
C. Adorisio Extracted from the presentation given at
BUSINESS CONTINUITY PLAN
PSS verification and validation
Radiation Protection Handbook
IMPACT YETS 2017–2018 & LS2 preparation
Safety in the East Area Renovation Project
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
BUSINESS CONTINUITY PLAN
Presentation transcript:

ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee meeting

Classification of interventions in radiation areas until now - 5 criteria, 3 levels ALARA procedures – 3 levels: o If the rad. risk is low <> very light procedure o If it is medium <> an optimization effort is required o If it is high <> an optimization effort is required, the procedure will be submitted to and presented at the ALARA committee 2

Retour d’experience until 2011/2012 Many positive examples prove that job optimization (reduction in dose to personnel) was, is and has to remain the main goal. But All DIMR Level III are prepared, not all DIMR Level II ALARA criteria are questioned No coherent approach in A&T departments and LHC experiments for Level I interventions RP act(ed) as “ owner ” of DIMRs Follow-up of recommendations not systematically done No clear guidelines for waiving ALARA committees meetings DIMR = Dossier d’Intervention en Milieu Radioactif

ALARA Review Working Group MEMBERS: Chair: H. Vincke (DGS/RP) Sc. Sec.: T. Wijnands (EN/HDO) RP (including RP group leader) RSOs from all departments and from the LHC experiments (GLIMOS from ATLAS repl. ATLAS RSO) ‘experts/user’ o R. Catherall o I. Efthymiopoulos o P. Bonna l 4

ARWG was expected to deliver: Proposal for ALARA criteria Proposal on how to initiate, to follow up and to archive the DIMRs (for all three levels) Proposal of guidelines for presentations to the ALARA committee Proposal of procedure waiving an ALARA committee meeting 5

ALARA criteria 6 ALARA Criteria

ALARA criteria and levels at CERN: 7 ALARA Criteria risk assessment required -> RSO and RP decide on ALARA Level 5 mSv hard limits old new

DIMR & WDP Dossier d’Intervention en Milieu Radioactif & Work and Dose Planning 8 DIMR & WDP

: DIMR (Dossier d’Intervention en Milieu Radioactif) Started in 2009: DIMR based on a SharePoint site – …. to edit and store work and dose planning documents Create a new work and dose planning folder Create a new work and dose planning document Create a new radiological work permit

IMPACT - DIMR & WDP IMPACT ( I ntervention M anagement P lanning & A ctivity C oordination T ool), is a general tool to manage work and activities + related aspects, i.e. planning, infrastructure, co- activities, permits, requests and documentation. ARWG also strongly supported the idea to use IMPACT for DIMRs and they have been implemented into IMPACT already 10 DIMR & WDP

Formal Approach Formal Approach All work needs to be announced to superintendent (Work Planning coordinators for experiments)  RP, RSOs/GLIMOS and the superintendents (Work Planning coordinators for experiments) check the list of works and make a ‘first’ DIMR level classification. DIMR Level 1: Work planning by maintenance/repair team IMPACT no documented WDP needed Approval by RSSO/RPE DIMR Level 2 and 3: Work and dose planning by maintenance/repair team, RP and RSO/RSSO Approval by department GL, RSO, RP for DIMR Level II If DIMR Level 3 -> ALARA Committee IMPACT with DIMR 11 LHC experiments apply DIMR/WDP also for Level 1 – integrated into the access request DIMR & WDP

RP=DGS/RP

Guidelines for presentations in the ALARA committee meeting 13 ALARA Committee

Guidelines for presentations in the ALARA committee Short description of intervention and the type (planned, unanticipated, urgent unanticipated) Justification of intervention & consequences in case the intervention does not take place Put the intervention into context using events in the past (if applicable). o Similar activities on the same installation, REX, etc. o Last maintenance performed o Envisaged revisions or replacements in the future Presentation of the DIMR – should contain at least : o Detailed description of major steps of the intervention and the time estimates o Results of mock-up tests and dry-runs (if applicable) justifying the estimated times and working methods o Measures that have been retained to optimize the intervention (remote handling, local shielding etc …..) o Summary of the optimization measures that were considered but not retained o Present the ALARA parameters for the optimized and for the non-optimized version of the DIMR o Assessment of risks of accidents and incidents and measures that have been taken to minimize these risks Summary of the intervention 14 ALARA Committee

Waiving of an ALARA committee meeting 15 ALARA Committee

Waiving of the ALARA committee meeting Circumstances Repetitive intervention o A procedure has been worked out under which circumstances a waiving of the ALARA committee meeting could be possible – valid for interventions approved already once in the ALARA committee. Urgent maintenance/repair Suggestion: generic DIMRs should be worked out and approved a priori in an ALARA committee meeting. 16 ALARA Committee

…in case of waiving Waiving of the ALARA committee meeting has to be recorded This action shall also be noted in the DIMR. The outcome will be presented in the next Radiation Safety Officer Committee (RSOC) meeting... and summarized in the next ALARA committee meeting. 17

The ARWG discussed and looked into proposals for: ALARA criteria: o Criteria and Levels o Operational margins o Emergency intervention 18 DIMRs &WDP: o Ownership o Procedure to create, check, validate and close o Work optimization process o Retour d’expérience o Controls o Functionality, routing, CERN integration o Contractors, PCR o Approval rounds o Implementation issues ALARA committee: o Guideline for presentations o Frequency o Quorum o Roles o Waiving of the ALARA committee meeting

19 …were approved by S. Myers and R. Trant on 20 April 2013! Final report(s) from ARWG … EDMS doc #

20 Existing ALARA documents (EDMS , and ) will be combined into a single document and updated with the recommendations from the ARWG Next steps + The new rules have become effective on 20. April 2013